062116_Drawings.pdf
PDF 25 MB Posted
- Attached to
- Bldg. 850 G Renovate For New Workload Federal contract opportunity
- Solicitation number
- FA8201-16-B-0002
About this file
Drawings B-850
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
HILL AFB, UTAH
ARCH. DESIGN WEST
ANDY TONGISH
DESIGNER
A-E FIRM
DESCRIPTION BY
ENGINEERING ASSISTANT
HILL AFB, UTAH
DATE
DATE
DATE
DATE
REVISION
DATE
DATE
DATE
ELECTRICAL REVIEW
MECHANICAL REVIEW
CIVIL/STRUCTURAL REVIEW
PHYS HANDICAP/INT DESIGN
BASE COMPREHENSIVE PLANNER
ARCHITECTURAL COMPATIBILITY
DEPARTMENT OF THE AIR FORCE
75TH AIR BASE WING
75TH CIVIL ENGINEER GROUP
DATE
DATE
DATE
DATE DATE
WORK REQUEST NO.
KRSM NO.
BASE PROJECT MANAGER
OF
DATE
SHEET
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
COMMUNICATIONS
SAFETY
DATE FIRE DEPARTMENT
BIOENVIRONMENTAL REVIEW
ENVIRONMENTAL REVIEW
CUSTOMER-FUNCTIONAL REVIEW
CORROSION ENGINEER
ENERGY CONSERVATION REVIEW
FIRE PROTECTION REVIEW
SECURITY FORCES
CHIEF ENGINEER
CHIEF PROJECT MANAGEMENT
FORCE PROTECTION
APPROVED-75 CEG
57154
TITLE SHEET
MAINTENANCE ENGINEERING
CIVIL ENGINEER
PARSONS BRINKERHOFF
488 E. WINCHESTER, SUITE 400
MURRAY, UTAH 84107
PHONE 801-288-3278
MECHANICAL ENGINEER
VAN BOERUM & FRANK ASSOC.
330 S. 300 E.
SALT LAKE CITY, UTAH 84111
PHONE 801-530-3148
FAX 801-530-2708
ELECTRICAL ENGINEER & FIRE PROTECTION
SPECTRUM ENGINEERS, INC.
324 S. STATE STREET, SUITE 400
SALT LAKE CITY, UTAH 84111
PHONE 801-328-5151
FAX 801-401-8422
COST CONTROL
PARAMETRIX, INC.
7186 SOUTH HIGHLAND DRIVE
SALT LAKE CITY, UTAH 84121
PHONE 801-733-5900
STRUCTURAL ENGINEER
ARW ENGINEERS
1594 W. PARK CIRCLE
OGDEN, UTAH 84404
PHONE 801-782-6008
FAX 801-782-4656
G-001
1 73
KRSM 142043
DEPARTMENT OF THE AIR FORCE
75TH AIR BASE WING
75TH CIVIL ENGINEER GROUP
PROJECT ARCHITECT
ARCHITECTURAL DESIGN WEST
795 NORTH 400 WEST
SALT LAKE CITY, UTAH 84103
PHONE 801-539-8221
FAX 801-539-8224
142043
RIGOBERTO LEON
RENOVATE SOUTHERN BAY G FOR NEW WORKLOAD B 850
FINAL SUBMITTAL
3/2/2015
RE-ISSUED 6/21/2016
BY ADDENDA
JURISDICTION
HILL AIR FORCE BASE
CODE ANALYSIS
AFB DESIGN COMPATIBILITY
2012 (IBC) INTERNATIONAL BUILDING CODE
2012 (IMC) INTERNATIONAL MECHANICAL CODE
2012 (IPC) INTERNATIONAL PLUMBING CODE
2011 (NEC) NATIONAL ELECTRICAL CODE.
UFC 3-600-01 - FIRE PROTECTION
ANSI C-2, NATIONAL ELECTRICAL SAFETY CODE
LIFE SAFETY CODE, NFPA 101
ANSI/ASCE 7-95
GENERAL
OCCUPANCY (IBC 304.1) B / F-1 / S-1
NON SEPARATED OCCUPANCY
TYPE OF CONSTRUCTION (IBC TABLE 503) IIB
BUILDING AREA (TABLE 503)
BUILDING AREA REMAINS UNCHANGED
FIRE-RESISTANCE REQUIREMENTS (TABLE 601)
PRIMARY STRUCTURAL FRAME 0-HR
BEARING WALLS 0-HR
EXTERIOR 0-HR
INTERIOR 0-HR
NONBEARING WALLS 0-HR
EXTERIOR 0-HR
INTERIOR 0-HR
FLOOR CONSTRUCTION 0-HR
ROOF CONSTRUCTION 0-HR
COORIDORS 0-HR
FIRE SUPPRESSION SYSTEM
FIRE EXTINGUISHING SYSTEM YES
OCCUPANT LOAD CALCULATION (IBC 1004.1.1)
STORAGE / MECHANCIAL =7,146 S.F. @ 300 =25 OCCUPANTS
BUSINESS AREAS =3,136 S.F. @ 100 =32 OCCUPANTS
INDUSTRIAL AREAS =16,220 S.F. @ 100 =163 OCCUPANTS
TOTAL OCCUPANTS =220 OCCUPANTS
PLUMBING FIXTURE REQUIREMENTS
RESTROOMS - PROVIDED IN ANOTHER AREA
DRINKING FOUNTAIN - PROVIDED
LEGEND
OCCUPANCY F-1
OCCUPANCY S-1
EXIT
OCCUPANCY B
C
C E
E G
G J
J L
L
2 2
6 6
BA
A
D F H K M
N
N
300K CLEANROOM
MOTOR
VIBRATION
CHANGE
100K CLEANROOM
JANITOR
MECHANICAL
DEMIL
BRAIDING
FIRE
CONFERENCE
OFFICE
105 OFFICE
OFFICE
COMMUNICATIONS
HALLWAY
ENTRANCE/LOCKERS
CABLE SHOP
CABLE SHOP
111 STORAGE
CUBICLES
FORKLIFT TRAVEL
FIRE
PARTICLE MEASURING SYSTEM
AREA OF
PROJECT
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
G-002
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
S H
E E
T I N
D E
X
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
SHEET LIST
INDEX SHEET SHEET NAME
P PLUMBING
38 P-101 PLUMBING PLAN
39 P-102 NATRUAL GAS PLAN
40 P-501 PLUMBING DETAILS
41 P-601 PLUMBING SCHEDULES
42 LG-101 LAB GAS PLAN
43 LG-102 LAB GAS SCHEMATICS
HP HYDRAULIC PIPING
44 HP-101 HYDRAULIC POWER PACK SYSTEM PIPE ISOMETRIC
- SUPPLY LINE
45 HP-102 HYDRAULIC POWER PACK SYSTEM PIPE ISOMETRIC
- RETURN LINE
46 HP-103 HYDRAULIC POWER PACK SYSTEM P&ID - LEGEND &
SYMBOLS
47 HP-104 HYDRAULIC POWER PACK SYSTEM P&ID
48 HP-105 HYDRAULIC POWER PACK SYSTEM STANDARD PIPE
HANGER SUPPORT
E ELECTRICAL
49 EE-001 SYMBOL SCHEDULE, SHEET INDEX
50 EE-601 PANEL SCHEDULES
51 EE-602 PANEL SCHEDULES
52 EE-603 PANEL SCHEDULES
53 ES-101 ELECTRICAL SITE PLAN
54 ED-101 DEMOLITION PLAN
55 EP-101 POWER PLAN
56 EP-102 ROOF POWER PLAN
57 EP-401 ENLARGED POWER PLAN
58 EP-402 ENLARGED POWER PLAN
59 EP-501 DETAILS
60 EP-502 DETAILS
61 EP-503 DETAILS
62 EP-601 DEMOLITION ONE LINE DIAGRAM
63 EP-602 NEW ONE LINE DIAGRAM
64 EP-603 EQUIPMENT SCHEDULE
65 EL-101 LIGHTING PLAN
66 EL-601 LIGHTING FIXTURE SCHEDULE
67 EY-101 AUXILIARY PLAN
68 EY-501 AUXILIARY DETAILS
69 EY-601 AUXILIARY DIAGRAMS
FP FIRE PROTECTION
70 FA-101 FIRE ALARM PLAN
71 FA-601 FIRE ALARM DETAILS
72 FP-101 FIRE PROTECTION PLAN
73 FP-601 FIRE PROTECTION DETAILS
SHEET LIST
INDEX SHEET SHEET NAME
G GENERAL SHEETS
1 G-001 COVER SHEET
2 G-002 SHEET INDEX
C CIVIL
3 CU-100 OVERALL UTILITY / SITE PLAN
4 CU-101 UTILITY PLAN
5 CU-501 CIVIL DETAILS
6 C-101 OVERALL SITE PLAN
7 C-102 SITE PLAN
8 C-103 SITE DETAILS
D DEMOLITION
9 D-101 DEMOLITION PLAN
A ARCHITECTURAL
10 A-101 FLOOR PLAN
11 A-102 ROOF PLAN
12 A-201 EXTERIOR ELEVATION
13 A-301 BUILDING / WALL SECTIONS
14 A-401 ENLARGED PLANS
15 A-402 INTERIOR ELEVATIONS
16 A-601 FINISH FLOOR PLAN
17 A-602 SCHEDULES
18 A-650 EQUIPMENT PLAN
19 A-701 REFLECTED CEILING PLAN
M MECHANICAL
20 M-000 MECHANICAL SYMBOLS
21 M-001 MECHANICAL GENERAL NOTES
22 M-002 MECHANICAL COMCHECK
23 M-101 MECHANICAL FLOOR PLAN
24 M-102 MECHANICAL ROOF PLAN
25 M-301 MECHANICAL SECTIONS
26 M-401 ENLARGED MECHANICAL PLAN
27 M-501 MECHANICAL DETAILS
28 M-601 MECHANICAL SCHEDULES
29 M-602 MECHANICAL SCHEDULES
30 M-603 MECHANICAL SCHEDULES
31 M-701 MECHANICAL SCHEMATICS
32 M-702 MECHANICAL SCHEMATICS
33 M-703 MECHANICAL SCHEMATICS
34 M-704 MECHANICAL SCHEMATICS
35 M-705 MECHANICAL SCHEMATICS
36 MPD-101 MECHANICAL PIPING DEMOLITION PLAN
37 MP-101 MECHANICAL PIPING PLAN
2 1/16" = 1'-0"
EXITING FLOOR PLAN
NORTH
1" = 200'-0"
OVERALL PLAN
B-843
B-850
B-845
B-847
B
B
B
B
B-864
B-859
B-860
B-858
N
0' 50' 100' 200' 300'
Scale: 1"=100'
GRAPHIC SCALE
LEGEND
PROPOSED NATURAL GAS
EXISTING NATURAL GAS
EXISTING UNDERGROUND POWER
EXISTING STEAM LINE
EXISTING STORM DRAIN
EXISTING POTABLE WATER
EXISTING INDUSTRIAL WASTE
EXISTING SANITARY SEWER
EXISTING JET FUEL
EXISTING OVERHEAD ELECTRIC
EXISTING PRESSURE IRRIGATION
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
P R O J E C T
M A N A G E R
D E S I G N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S I T E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A I R
F O R C E
T H
C I V I L
E N G I N E E R
G R O U P
T H
A I R
B A S E
W I N G
CU-100
R E
N O
V A
TE
S
O U
TH
E
R N
B A
Y G
. F O
R N
E W
W O
R K
LO
A
D B
U
TI
LI
TY
O V
E R
A
LL
P
LA
N R
IG
O
B E
R
TO
L E
O N
/0
2/
FINAL SUBMITTAL
A B
T D
R W
S S
B
3/2/15
L
PR
O
FE
EE
E
S
SS
UFO ATETAT H
R
NI
GN
OI
L AA
R R
UT C
N
S UT
B
B
B
B-859
Pinch Existing Line and Fuse Weld Tee to tie into Existing 1.5" Gas Line Field Verify size, depth, and material. Coordinate gas outage at Building 838 with Contracting Officer
Construct Poly gas valve in valve box Begin tracer wire inside valve box with 3-feet ± slack above top of valve box
Route pipe under overhead steam line
Retain & Protect Existing Utility Lines Hand Dig both sides of pipe as needed until existing utility line is crossed
Directional Bore or Mole under the roadway open cut and patch not allowed, pull tracer wire under road with gas pipe.
Construct 390'± 1.5", DR11, 80 psi Natural Gas Line
Photo 1 Looking Southeast
Retain & Protect Existing Utility Lines Hand Dig both sides of pipe as needed until existing utility line is crossed
Construct 3'x4' Concrete Pad for Gas Meter Extend Riser through Concrete Pad Construct Rotary Gas Meter with Lockable Bypass, Seismic Automatic Shutoff Valve, and Y Strainer set on Pedestal.
Coordinate pad location so that pipe into building comes in 9" to 12" from Northwest Corner of inside wall and 12" to 18" above finish floor.
Construct 2 bollards on north side of pad to protect gas meter.
N
0' 10' 20' 40' 60'
Scale: 1"=20'
GRAPHIC SCALE
LEGEND
PROPOSED NATURAL GAS
EXISTING NATURAL GAS
EXISTING UNDERGROUND POWER
EXISTING STEAM LINE
EXISTING STORM DRAIN
EXISTING POTABLE WATER
EXISTING INDUSTRIAL WASTE
EXISTING SANITARY SEWER
EXISTING JET FUEL
EXISTING OVERHEAD ELECTRIC
EXISTING PRESSURE IRRIGATION
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
P R O J E C T
M A N A G E R
D E S I G N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S I T E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A I R
F O R C E
T H
C I V I L
E N G I N E E R
G R O U P
T H
A I R
B A S E
W I N G
CU-101
R E
N O
V A
TE
S
O U
TH
E
R N
B A
Y G
. F O
R N
E W
W O
R K
LO
A
D B
U
TI
LI
TY
P
LA
N R
IG
O
B E
R
TO
L E
O N
/0
2/
FINAL SUBMITTAL
A B
T D
R W
S S
B
3/2/15
L
PR
O
FE
EE
E
S
SS
UFO ATETAT H
R
NI
GN
OI
L AA
R R
UT C
N
S UT
B-850
TRENCH ZONE
MATERIAL, SEE
SPECIFICATIONS
IDENTIFICATION TAPE
PIPE ZONE
MATERIAL, SEE
SPECIFICATION
6" FOR PIPES
12" DIA.
OR SMALLER.
#10 AWG. COPPER
WIRE FINDER
PIPE TRENCH DETAIL
PHOTO 1
3'X4' X10" THICK CONCRETE PAD
W/ FIBER MESH
10" THICK SLAB
6" COMPACTED ROAD BASE
4'
3'
1.5" YELLOW NATURAL GAS LINE FROM MAIN
30"x30" RISER UP
1.5" MAIN SHUT OFF VALVE
1.5" AUTOMATIC SEISMIC SHUTOFF VALVE
1.5" PRESSURE REGULATOR, 5 psi OUT
1.5" BYPASS LINE WITH SHUTOFF VAVLE
1.5" ROTARY GAS METER
FLANGE CONNECTIONS
1.5" GAS LINE TO BUILDING
TRANSITION FROM PE TO BLACK IRON PIPE
GAS PAD DETAIL
WELDED CONNECTION
1.5" Ø PIPE SUPPORTS
ANCHOR EACH SUPPORT TO CONCRETE WITH FOUR 1/2"Ø
BOLTS, DRILL AND EPOXY GROUT INTO SLAB 4" MIN.
THREADED JOINT TYPICAL
1.5" GAS LINE TO BUILDING
PROFILE VIEW
PLAN VIEW
3'X4' CONCRETE PAD, 10" THICK
W/ FIBER MESH
SET TOP OF SLAB EVEN WITH TOP OF
WATERWAY
ADJUST PAD LOCATION SO THAT PIPE FROM
METER TURNS UP AT BYPASS TEE, AND
ELBOWS OVER TO WALL WITHOUT ADDITIONAL
BENDS
CORE HOLE IN BUILDING CORNER 9" TO 12"
FROM INSIDE CORNER, 12" TO 18" ABOVE FINISH
FLOOR, COORDINATE WITH MECHANICAL FOR
LOCATION, AFTER PIPE HAS BEEN INSTALLED,
SEAL HOLE IN WALL WITH CAULK
APPROXIMATE FINISH FLOOR
1/2"Ø ANCHOR BOLT 4 EACH PER PLATE
DRILL AND ANCHOR TO SLAB, 4' DEEP EACH
1/4" STEEL PLATE
"Y" STRAINER
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
P R O J E C T
M A N A G E R
D E S I G N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S I T E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A I R
F O R C E
T H
C I V I L
E N G I N E E R
G R O U P
T H
A I R
B A S E
W I N G
CU-501
R E
N O
V A
TE
S
O U
TH
E
R N
B A
Y G
. F O
R N
E W
W O
R K
LO
A
D B
C
IV
IL
D
E
TA
IL
S
R
IG
O B
E R
TO
L
E O
N
FINAL SUBMITTAL
A B
T D
R W
/0
2/
S S
B
3/2/15
L
PR
O
FE
EE
E
S
SS
UFO ATETAT H
R
NI
GN
OI
L AA
R R
UT C
N
S UT
NOTE:
TRENCH MUST BE INSPECTED BY PROJECT
MANAGER OR CONTRACTING OFFICER'S
DESIGNATED REPRESENTATIVE PRIOR TO
BACKFILLING. INSPECTION WILL VERIFY
TRACER WIRE, TRENCH DEPTH, AND PIPE
BEDDING MATERIAL.
1.5" ISOLATION VALVE
1.5" ISOLATION VALVE
NOTE:
ELECTROFUSION WELD OR BUTT FUSION
WELD HDPE PIPE JOINTS. OTHER
METHODS OF PIPE JOINING ONLY WITH
PERMISSION OF CONTRACTING OFFICER.
H A
V E
N U
E
CANOPY COLUMNS
CONCRETE RAMP
SEE 1/C-102
LINE OF ASPHALT TO
REMOVE & REPLACED
LINE OF CURB & GUTTER TO REMOVE
FIELD VERIFY
+/- 21'-0"
NEW PAINTED
DIRECTIONAL
ARROW
EXISTING PARKING STRIPES
EXISTING TRANSFORMER
EXISTING POWER POLE
AREA OF ASPHALT
TO BE REPLACED
DOCK
AREA OF ASPHALT
TO BE REPLACED
AREA OF ASPHALT
TO BE REPLACED
NITROGEN EQUIPMENT PAD,
CONSTRUCTION JOINTS
SHALL BE PLACED AT 10'-0"
O.C.
EXITING STAIRS
NITROGEN EQUIPMENT PAD, CONSTRUCTION
JOINTS SHALL BE PLACED AT 10'-0" O.C.
EXITING STAIRS
EXISTING SIDEWALK
& ROCKS
EXISTING PARKING & STRIPING
EXISTING CURB RAMP
NEW TRANSFORMER
FDCFDC
24'-0"
'-0
'-0
40'-0"
6" 19'-6" 19'-6" 6"
4"
NOTE: CONTRACTOR SHALL REMOVE EXISTING WATERWAY LONG SOUTHSIDE OF
BUILDING. ALL PADS AND NEW GRADING SHALL SLOPE AWAY FROM BUILDING
B850
BAY G
C-103
C-103
C-103
6' -0
6'
-1 0"
3'-2" 6'-6" 3'-2"
6'-0"
6' -0
5'
-6
6' -0
6'
-0
9" 6'-6" 9"
S
LO
P E
/8
S
LO
P E
/8
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
C-101
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
O V
E R
A L L S
IT
E
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
3/32" = 1'-0"
OVERALL SITE PLAN
NORTH
A D
D
EN
D
/2
1/
H
V E
N U
E
C-102
CANOPY COLUMNS
CONCRETE RAMP
LINE OF ASPHALT TO REMOVE
LINE OF CURB & GUTTER TO REMOVE
FIELD VERIFY
+/- 21'-0"
NEW PAINTED
DIRECTIONAL
ARROW
EXISTING PARKING STRIPES
C-102
ALUMINUM
THRESHOLD
EXISTING CURB & GUTTER
EXISTING CURB & GUTTER
EXISTING SIDEWALK
EXISTING SIDEWALK
11'-11"
2' -0
'-0
2' -0
C-102
C-102
C-102
2'-0" 8'-11" 5'-0"
CONCRETE ISLAND
LEVEL W/ SIDEWALK
ASPHALT
4" CONCRETE RAMP
ON BASE
CONCRETE ISLAND
LEVEL W/ SIDEWALK
EXP.
JOINTS
LINE OF CANOPY ABOVE
CMU
COLUMN
EXISTING
BUILDING
DOWN FLAT
8'-0" 3'-11"
100'-0"
100'-0"
100'-0"
99'-6"
LINE OF CANOPY
ABOVE
NOTE: PATCH ASPHALT AS REQUIRED.
PROVIDE PROPER SLOPE.
'-0
HSS 4x4x1/4 COL. ON 1/2"x10"x10" BASE PL W/ (4) 3/4" Ø A.B. ON 16"x16"x2' DEEP
CONC PIER ON FOOTING. TYP.
C-102
OPP.
EXISTING SIDEWALK
HSS 4x4x1/4 COLUMNS
PRE-FINISHED STANDING SEAM METAL
ROOF SYSTEM W/ 12" PANEL WIDTHS
HM FRAME & DOOR
4" CONCRETE RAMP
WITH BASE MATERIAL
ASPHALT PATCH
PERLINS, SEE CANOPY
FRAMING PLAN
109'-0"
TOP OF COLUMN
PRE-FINISHED MTL. FLASHING
BASE PLATES
HSS TRUSSES
1'-1"
MIN.
2"
NOTE: SEE 3/C-102
FOR FRAMING PLAN
PRE-FINISHED METAL FASCIA
PRE-FINISHED STANDING SEAM METAL
ROOF SYSTEM W/ 12" PANEL WIDTHS
HSS 4X4X1/4" COLUMN
HM FRAME & DOOR
HSS 4x4x1/4
PRE-FINISHED STANDING SEAM METAL
ROOF SYSTEM W/ 12" PANEL WIDTHS
100'-0"
TOP OF COLUMN
HM FRAME & DOOR
109'-0"
HSS 4x4x1/4
HSS 4x2x3/16
2' -6
COLUMN BEYOND
BASE PLATE
BASE
PLATE
/2
HSS 4x2x3/16 PURLINS, TYP.
PROVIDE WELDED END CAPS
EACH END
HSS 6x3x3/8
HSS 3x3x1/4
HSS 4x3x1/4
1/4" CAP PL.
NOTE:
WELD ALL JOINTS W/1/4" FILLET
WELDS ALL AROUND
HSS 3X3X1/4
3"
1'-0"
TYP
3/16
C-102
1'-0"
EXTERIOR
LIGHT
PRE-FINISHED STANDING SEAM METAL
ROOF SYSTEM W/ 12" PANEL WIDTHS
EXISTING BUILDING
RIDGE CAP
SNOW GUARD
PRE-FINISHED MTL. FLASHING
SNOW GUARD
RUN-OFF GUTTER
RUN-OFF GUTTER
PRE-FINISHED STANDING SEAM METAL
ROOF SYSTEM W/ 12" PANELS WIDTHS
PRE FINISHED METAL FASCIA
BASE PLATE
EXISTING BUILDING
HSS 4x4x1/4 COLUMNS
SNOW GUARD
PRE-FINISHED
MTL. FLASHING
C-102
C-102
EXISTING BUILDING
HSS 4x4x1/4" COLUMN, BELOW TYP.
HSS 4x2x3/16" FRAMING, TYP.
EXISTING
BUILDING
HSS 4x2x3/16" FRAMING, TYP.
EQ
EQ
EQ
EQ
HSS TRUSS,
SEE SECTION
2"
1/
2" 7"
1/
2"
1/4 BASE PL 1/2"X10"X10" W/
(4) 3/4" Ø ANCHOR BOLTS
W/10" MIN. EMBEDMENT
16"X16" PIER. REINFORCE W/ (4)
#5 (V) AND #3 TIES @ 6" O.C.
3'X3'X12" FTG W/ (3) #5 E.W.
2' -0
BASE PLATE
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
C-102
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
S
IT
E P
L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL 1/8" = 1'-0"
SITE PLAN
1/4" = 1'-0"
MAIN ENTRY
1/4" = 1'-0"
CANOPY SECTION
1/4" = 1'-0"
CANOPY ELEVATION
1/4" = 1'-0"
CANOPY SECTION
1/4" = 1'-0"
CANOPY ROOF PLAN
1/4" = 1'-0"
CANOPY ELEVATION
1/4" = 1'-0"
CANOPY FRAMING PLAN
1" = 1'-0"
COLUMN FOUNDATION DETAIL
NORTH
ASPHALT
PIPE HANDRAIL 1-1/2" - 2"
CONCRETE STAIRS
CONCRETE SLAB
EXISTING BUILDING
HM DOORS & FRAME
MECHANICAL
6" CONCRETE
FOUNDATION W/
FOOTINGS
EXISTING FLOOR SLAB
1'-0"
6"
1 1/2" PIPE GUARD
PAINT
1'-0"
ASPHALT
1 1/2" PIPE GUARD
PAINT
CONCRETE STAIRS
CONCRETE SLAB
EXISTING BUILDING
HM DOOR & FRAME
(EXIT ONLY)
FIRE
6" CONCRETE
FOUNDATION
EXISTING FLOOR SLAB
SCHEDULED WALL & CEILING
PROVIDE WALL TYPE W4 FOR
BOTH WALL & CEILING
FRAMING
6"
SURFACE
MOUNTED
LIGHTING
1/4" PLATE
PAINT
BOLT, NUT & WASHER
1 1/2" PIPE
PAINT
ENLARGED BRACKET DETAIL
C-103
3' -6
3' -6
PIPE HANDRAIL 1-1/2" - 2"
" M
IN
FI
EL
D V
ER
IF
Y
3' -0
1'-0"
1' -6
4" 4"
#6 @ 12" oc EACH WAY
7" M
IN
. E
M
BE
D
TOP OF CONCRETE PAD
3/4" BASE PLATE
1" DIA. ANCHOR BOLT
1" GROUT
BASE PLATE - SEE
ENLARGED DETAIL
SEE
3A
6" GRAVEL BASE
CONCRETE SLAB
CONCRETE SLAB
NOTES:
SEE SECTION FOR REINFORCING.
CONCRETE f'c = 5000 psi REINFORCING STEEL fy = 60,000 psi
1' -6
NOTE:
CONTRACTOR SHALL VERIFY
SLAB THICKNESS, SIZE &
REINFORCEMENT W/ NITROGEN
TANK MANUFACTURER
3C
DETAIL
3B
DETAIL
3A
DETAIL
SE
E
N O
TE
A
BO
VE
AS
SU
M E
EXISTING ASPHALTASPHALT PATCH
BASE COURSE
EX
IS
TI
N
G
4"
M
AT
C H
EX
IS
TI
N
G
8"
M
AT
C H
(5) TREADS @ 12"
5'-0"
#4 @ 12" O.C. EACH WAY
#3 NOSE BAR EACH STEP
COMPACTED FILL
PATCHED ASPHALT
SEE: /7 C-103
1" RADIUS NOSE
TYP.
1'-4"
" M
IN
6" FOUNDATION WALL
REINFORCING ?
x'Xx' FOOTING WITH #4's @ 12" O.C. E.W.
6" CONC. SLAB
C-103
C-103
C-103
5'-0"
3' -6
3'
-0
6" 4'-0" 6"
2' -6
6"
10" CONC. PAD
GAS METER
3' -0
1'-6"
EXISTING WATER WAY
EXISTING
WATER WAY
C-103
F.
V.
1' -3
F.V.
2'-0"
FLOOR LINE
5' -0
STANDING SEAM MTL. ROOF
STEEL TUBE
GAS METER, SEE
CIVIL DRAWINGS
CONC. FOUNDATION
TUBE STEEL FRAMING
GAS LINE
BUILDING BEYOND
C-103
STANDING METAL
SEAM ROOFING
2" x 4" x 1/4" STEEL TUBE
FRAMING (4 SIDES),
3" DIA. STEEL TUBE, TYP.
10" CONC. PAD
8"
1/4
2" x 4" x 1/4" STEEL TUBE
FRAMING (4 SIDES), PROVIDE
WELDED END CAPS EACH END
1/4
4" BASE COURSE
8" Ø CONC.
FOUNDATION
M
IN
3' -0
EXISTING WATERWAY
EXISTING BUILDING
GAS METER
8"
M
IN
3' -0
6" 3'-0"
STANDING METAL SEAM ROOFING
2" x 4" x 1/4" STEEL TUBE
FRAMING (4 SIDES)
3" DIA. STEEL TUBE
5' -0
10" CONC. PAD
4" BASE COURSE
1/4
FOUNDATION BEYOND
8" Ø CONC. FOUNDATION
6"x6"x3/8" PLATE WITH (4) 1/2"x8"
ANCHOR BOLTS
COLUMN
CONC. FOOTING BELOW
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
C-103
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
S
IT
E D
E T
A
IL
S
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
3/8" = 1'-0"
MECHANICAL 118 EXITING
3/8" = 1'-0"
FIRE 123 EXITING
1/4" = 1'-0"
EXTERIOR SLAB DETAILS
1" = 1'-0"
ASPHALT PATCH
3/4" = 1'-0"
CONC. STAIR DETAIL
1/2" = 1'-0"
ENLARGED PLAN @ GAS METER
1/2" = 1'-0"
EXTERIOR ELEVATION @ CANOPY
3/8" = 1'-0"
SECTION @ CANOPY
3/8" = 1'-0"
SECTION @ CANOPY
1 1/2" = 1'-0"
BASE PLATE DETAIL
A D
D
EN
1/
C E G J L
2 2
6 6
BA D F H K M N
LOADING DOCK
OFFICE AREA
EXISTING SLIDING DOOR TO REMAIN
BOLT IN CLOSED POSITION
DOOR PULLEY SYSTEM
DISCONNECT FROM
DOOR OPERATION
controls
EXISTING ROOF
DRAIN TO BE
PROTECTED
FIRE ALARM PANELS AND
RISER TO BE PROTECTED
DURING CONSTRUCTION
EXISTING DOOR &
FRAME - change hardwware
3'-4" 8"
2' -0
'-4
2' -0
'-7
31'-5 1/2" 2'-6" 30'-8" 2'-6" 30'-7 7/8" 2'-6" 30'-8" 2'-6" 30'-8" 2'-6" 31'-5"
EXISTING CONCRETE DECK
APPROX. 24'-9" ABOVE
REMOVE EXISTING FE
RETURN TO OWNER
REMOVE EXISTING FE
RETURN TO OWNER
SAWCUT PORTION OF
EXISTING CONCRETE
PANEL FOR NEW
DOOR & FRAME
SAWCUT PORTION OF
EXISTING CONCRETE
PANEL FOR NEW
DOOR & FRAME
SAWCUT PORTION OF
EXISTING CONCRETE
PANEL FOR NEW
DOOR & FRAME
SAWCUT PORTION OF
EXISTING CONCRETE
PANEL FOR NEW DOOR
& FRAME
6'-4" 1'-6" 3'-4" 8"
REMOVE BOLLARDS
3' -4
8"
REMOVE EXISTING
ELECTRICAL PANEL
SEE ELECTRICAL
EXISTING ROOF DRAIN
TO BE PROTECTED
FIRE ALARM PANELS AND
RISER TO BE PROTECTED
DURING CONSTRUCTION
REMOVE PANELS & TRANSFORMER
SEE ELECTRICAL
REMOVE CONDUITS & OUTLETS
RELATED TO THE CHARGING STATION
SEE ELECTRICAL
EXISTING TRANSFORMER
& PANELS TO BE
PROTECTED DURING
CONSTRUCTION
EXISTING OVERHEAD DOOR
PROTECT DURING CONSTRUCTION
EXISTING OVERHEAD DOOR
PROTECT DURING CONSTRUCTION
EXISTING DOOR &
FRAME - change hardwware
GENERAL NOTE
CONTRACTOR SHALL REMOVE ALL NON-USED
ITEMS IN THE CONSTRUCTION AREA. SEE
MECHANICAL, FIRE PROTECTION AND
ELECTRICAL DRAWINGS
relocate controls to other side of door remove FE
DEMOLISH EXISTING
CONCRETE RAMP &
FOOTINGS
APPROX. DEMOLITION OF
EXTERIOR FOR NEW STAIRS
APPROX. DEMOLITION OF
EXTERIOR FOR NEW CONCRETE
PAD
APPROX. DEMOLITION OF
EXTERIOR FOR NEW CONCRETE
PAD & STAIRS
NOTE:
CONTRACTOR SHALL REMOVE
VENTILATORS FROM THE ROOF AND
PROVIDE A GALVANIZED METAL CAP
OVER THE OPENING. INSTALL AND
SEAL TO PROTECT BUILDING FROM
WATER LEAKAGE.
NOTE:
ALL DIMENSIONS ARE TO BE FEILD
VERIFIED BY CONTRACTOR.
NOTE:
CONTRACTOR SHALL MODIFY
WATERWAY AS NEEDED.
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
D-101
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
D E
M O
L
IT
IO
N
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
3/32" = 1'-0"
DEMOLITION PLAN
9NORTH
LOADING DOCK
OFFICE AREA
300K CLEANROOM
MOTOR
VIBRATION
CHANGE
100K CLEANROOM
JANITOR
MECHANICAL
DEMIL
BRAIDING
FIRE
CONFERENCE
OFFICE
OFFICE
OFFICE
COMMUNICATIONS
HALLWAY
ENTRANCE/LOCKERS
CABLE SHOP
CABLE SHOP
STORAGE
EXISTING SLIDING DOOR
TO REMAIN
BOLT IN CLOSED POSITION
SECURE AREA
EXISTING STAINLESS
STEEL DOOR PULLEY
STSTEM TO REMAIN
existing isolated pad controls fire riser and panelsfire riser
C
C E
E G
G J
J L
L
2 2
6 6
BA
A
D F H K M
N
N
CUBICLES
FORKLIFT TRAVEL
EXISTING STAIRS
119A
115C 115A
115B112 116
119B
120123 118
33'-8" 16'-5" 5'-6 1/4" 32'-0" 23'-4 5/8"
7' -6
6'-2"
23'-11 1/2" 7'-9 3/8"
5'-0" CLEAR
W4
W4
W1
W1
W4
W4
W1
W4
W4
W4
W1
W4
W4
A-401
A-401
16'-0"
'-0
6' -0
" C
LE
AR
W4
FIRE
A-402
Sim
C
LE
AR
4' -6
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
C
LE
AR
'-0
C
LE
AR
'-0
C
LE
AR
'-0
CLEAR
22'-0"
CLEAR
59'-0"
C
LE
AR
'-3
/2
C
LE
AR
'-0
7'-11 1/4" 12'-0 3/4" 10'-7 3/4" 7'-4 1/4"
CLEAR
37'-11"
C
C
W1
6' -1
1/
2"
A-402
W1
'-0
10'-6 3/8"
'-0
118A
1' -6
8' -1
/4
'-7
6' -0
TEMPERATURE: 72° F, +/- 5° F
HUMIDITY: 50% OR LESS
POSITIVE PRESSURE
10 AIR CHANGES/HOUR
SEE FOR
CANOPY DRAWINGS
/1 C-102
C-1032
C-103
C-103
ELECTRICAL
118a
CR1
CR1
118B
LOW WALL
RETURN (TYP)
LOW WALL
RETURN (TYP)
SIM
1'-6"
FEC
FEC
FEC
8" CONCRETE SLAB
SEE FOR DETAILS
A-201
78'-4 1/8" 61'-3 1/8" 51'-3 3/4" 7'-9 3/8"
/3 C-103
18" CONCRETE SLAB
SEE FOR DETAILS/3 C-103
NEGATIVE PRESSURE
S
LO
P E
/8
FT
S
LO
P E
/8
FT
NOTE:
CONTRACTOR SHALL GRADE NEW ASPHALT TO SLOPE AWAY FROM BUILDING
NOTE:
CONTRACTOR SHALL GRADE NEW
ASPHALT TO SLOPE AWAY FROM BUILDING
W4 1'-6"
PARTICLE MEASURING SYSTEM
W4
W1
W1
SECURITY WALL
FLOOR TO DECK ABOVE, GRID 7 FROM GRID A - GRID N
FLOOR TO GYPSUM BOARD CEILING, FIRE 120-L1 & FIRE 123-L2
-seal all penetrations -sound proof room -contr shall provide insul on all walls -gb clg w/ insul
CLEAR
8'-0"
TEMPERATURE: 72° F, +/-5° F
HUMIDITY: 30% MIN, 50% MAX
POSITIVE PRESSURE
15-20 AIR CHANGES/HOUR
W4
19'-6" 19'-6"
5/8" GYPSUM BOARD
5/8" GYPSUM BOARD
3 5/8" METAL STUDS @ 16" oc
(20 GAUGE)
4 7/8"
5/8" GYPSUM BOARD
3 5/8" METAL STUDS @ 16" oc
(20 GAUGE)
4 1/4"
W1
W2
W4
2" MINERAL FIBER, 3 pcf, FRICTION FIT
IN SPACE, FROM FLOOR
TO CEILING @ BRAIDING 122, PMS 124
AND WALL BETWEEN 104 & 105 ONLY
(STC 45)
WALL TYPES
NOTE:
1. ALL WALLS TO EXTEND FROM FLOOR TO 6" ABOVE CEILING LINE UNLESS NOTED.
5/8" TYPE 'X' GYPSUM BOARD
5/8" TYPE 'X' GYPSUM BOARD
600S162-54 (33KSI) @ 16" oc (16 GAUGE) 6" x 1 5/8" FLANGE STUDS
7 1/4"
SECURITY
WALL
UL419
EXTEND TO
DECK ABV.
MODULAR
CLEANROOM WALL
4 1/4"
CR1
BRIDGING @ 5'-0" oc, VERTICALLY
EXPANDED METAL MESH
INT. EXT.
GENERAL NOTES
1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE. LARGER SCALE
DRAWING SHALL HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS. THE GENERAL CONTRACTOR
SHALL NOTIFY THE ARCHITECT OF ANY DIMENSION DISCREPANCIES OR CONFLICTS BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
2. CONTRACTOR SHALL VERIFY LAY-OUT OF STRUCTURAL, MECHANICAL, AND ELECTRICAL.
3. ALL INTERIOR DIMENSIONS ARE TO/FROM FACE OF STUD. DIMENSIONS MARKED 'CLEAR' OR 'CLR' ARE FROM FACE OF FINISH TO FACE OF FINISH AND SHALL BE MAINTAINED AND CANNOT BE FIELD ADJUSTED
WITHOUT PRIOR APPROVAL OF THE ARCHITECT.
4. ALL DOOR FRAMES SHALL BE MIN. 4" FROM SIDE WALL UNLESS NOTED OTHERWISE.
5. CG = CORNER GUARD. SEE A-601
FEC = SEMI RECESSED FIRE EXTINGUISHER. SEE 13/A-4026.
7. BLOCKING TO BE PROVIDED FOR ALL WALL MOUNTED EQUIPMENT SEE 10/A-402
8. WINDOW TYPES - SEE SHEET A-602 XX
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-101
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
F L O
O R
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R R
S
FINAL SUBMITTAL
3/32" = 1'-0"
FLOOR PLAN - BAY G
NORTH
A D
D
EN
1/
C
C E
E G
G J
J L
L
2 2
6 6
BA
A
D F H K M
N
N
C-102
HP 1
1200#
RTU 1
700#
RTU 2
700#
RTU 3
700#
RTU 4
700#
RTU 5
700#
RTU 6
700#
RTU 7
700#
RTU 8
700#
H 2 360#
CU 1
XXX#
CH 2
1700#
CH 3
1600#
A-201
RTU3 - RTU7
20x14 penetration, each 22x22 penetration, each
RTU 8 - RTU9
14x14 penetration, each 14x14 penetration, each
(2) 2" penetrtations
CH3
(2) 6" PENETRATIONS
H2 36" penetration 48" penetration
H1 30" penetration 48" pentration
RTU1 - RTU2
20x14 penetration, each 22x22 penetration, each
EXISTING
VENTILATOR
EXISTING
VENTILATOR
EXISTING
VENTILATOR
EXISTING
VENTILATOR
EXISTING SEALED OPENING
EXISTING SEALED
OPENING
EXISTING SEALED
OPENING
NOTE:
CONTRACTOR SHALL PATCH AND REPAIR
EXISTING ROOF SYSTEM AT ALL NEW
PENETRATIONS. CONTRACTOR SHALL
MAKE REPAIRS TO MAINTAIN EXISTING
WARRANTY. VERIFICATION AND
CERTIFICATION WILL BE REQUIRED.
CONTRACTOR SHALL VERIFY WITH OTHER
TRADES FOR ANY ADDITIONAL ROOF
PENETRATIONS.
H 1 360#
10'-0"
'-0
CH 1
1700# 17'-6"
'-0
3' -0
30'-0"
'-4
CH1
(2) 6" PENETRATIONS
CH 2
(2) 6"
PENETRATIONS
3' -0
CONC. TEE LINE
TYP.
1. ALL OPENING MUST NOT CUT RIBS OR BEAMS.
2. ALL OPENINGS CUT LARGER THAN 12", INSTALL
ANGLE FRAME AROUND OPENING W/ L4x4x1/4 HEADERS
TO ADJACENT BEAMS (SEE DETAIL).
3. TWO ADJACENT OPENINGSARE TO BE TREATED AS A
SINGLE OPENING IF NOT SEPERATED BY AT LEAST 12".
4. IF THE EDGE OF AN OPENING IS WITHIN 6" OF A RIB OR
BEAM, NO ANGLE IS REQUIRED AT THAT EDGE.
5. CONTRACTOR SHALL REMOVE VENTILATORS FROM
THE ROOF AND PROVIDE A GALVANIZED METAL CAP
OVER THE OPENING. INSTALL AND SEAL TO PROTECT
BUILDING FROM WATER LEAKAGE.
ROOF PLAN STRUCTURAL NOTES
TY
PI
C
AL
9' -6
6'-0" TO 6'-7"
VARIES
6'-0" TO 6'-7"
VARIES
BEAM
PANEL JOINT
BEAM
BEAM
BEAM
PANEL JOINT
R
IB
R
IB
R
IB
ALL OPENINGS MUST NOT CUT RIBS OR BEAMS.
AT ALL OPENINGS CUT LARGER THAN 12", INSTALL
ANGLE FRAME AROUND OPENIN, WITH L4" x 4" x1/4"
HEADERS TO ADJACENT BEAMS (SEE BELOW).
TWO ADJACENT OPENINGS ARE TO BE TREATED AS A
SINGLE OPENING IN NOT SEPERATED BY AT LEAST 12".
IF THE EDGE OF AN OPENING IS WITHIN 6" OF A RIB OR
BEAM, NO ANGLE IS REQUIRED AT THAT EDGE.
P 1/4" x 2" x 3 1/2"L
L4" x 4" x 1/4"
P 1/4" x 5" x 8" W/ (2) 1/2"
DIA. EPOXY ANCHORS W/
3 1/2" EMBEDMENT
L
3/16"
C
BEAM
L
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-102
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
R O
O F
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
3/32" = 1'-0"
ROOF PLAN
1/4" = 1'-0"
ENLARGED ROOF JOIST PLAN
3/4" = 1'-0"
PANEL OPENING DETAIL
CONCRETE STAIRS & METAL RAILINGCONCRETE STAIRS & METAL RAILING
NITROGEN EQUIPMENT CANOPY
SEE FRAMING PLAN & DETAILS
CONCRETE STAIRS
& METAL RAILINGNITROGEN TANKS CONCRETE SLAB
SEE DETAILS
EXT.
FDC
EXT.
FDC
EXISITING DOCK & STAIRS
EXISTING RAMP TO
BE REMOVED - SEE
DEMOLITION PLAN
EXT. LIGHT
EXT. LIGHT
EXT. LIGHTEXT. LIGHT
EXT. BUILDING
A-201
S
LO
P E
STANDING SEAM METAL ROOFING
FLASHING
STANDING SEAM METAL ROOFING
W/ 12" OVERHANG
8" CHANNEL FRAMING
EACH END AND MID-SPANS
PAINT
10'-0"
4X4 TS
SEE PLAN FOR SPACING
PAINT
EXISTING BUILDING
8" CONCRETE SLAB ON GRAVEL BASE
SEE /3 C-103
3/4" PLATE W/
BOLT EACH SIDE
PAINT
NOTE:
CONTRACTOR SHALL VERIFY
SLAB THICKNESS, SIZE &
REINFORCEMENT W/ NITROGEN
TANK MANUFACTURER
1'-0"
FLASHING
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-201
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
E X
T E
R
IO
R E
L E
V A
T I O
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
1/8" = 1'-0"
SOUTH ELEVATION
1/4" = 1'-0"
NITROGEN EQUIPMENT CANOPY
3/8" = 1'-0"
NITROGEN CANOPY SECTION
A-402
CUBICLES
HALLWAY
OFFICE
EXISTING CONC. SLAB
LAY-IN TILE SYSTEM SCHEDULED WALL
SCHEDULED WALL
SCHEDULED
DOOR & FRAME
108'-6"
B.O. CEILING
109'-0"
B.O. CEILING
100'-0"
FIN. FLOOR
LIGHT FIXTURE, TYP.
LAY-IN TILE SYSTEM
LAY-IN TILE
SYSTEM
SECURITY WALL - SEE
CLEAN ROOM SYSTEM
LAY-IN TILE SYSTEM
1' -0
TO DECK ABOVE
1/2"
COVED FLOORING
300K CLEANROOM
/11 A-402
EXISTING CONCRETE SLAB
100'-0"
FINISH FLOOR
109'-0"
B.O. CEILING
C E G JD F H K
FIRE
CABLE SHOP
CABLE SHOP
BRAIDING
122 DEMIL
STORAGE
EXISTING CONC. SLAB
LAY-IN TILE SYSTEM
SCHEDULED DOOR & FRAME
SCHEDULED DOOR & FRAME
109'-6"109'-6"
B.O. CEILINGB.O. CEILING
LIGHT FIXTURE, TYP.
SUSPENDED GYPSUM
BOARD CEILING
LAY-IN TILE SYSTEM
SCHEDULED WALL
SCHEDULED WALL
SCHEDULED WALL
SCHEDULED WALL
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-301
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
B U
IL
D
IN
G
W
A L L S
E C
T
IO
N S
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
1/4" = 1'-0"
SECTION - ADMINISTRATION
3/4" = 1'-0"
SECURITY WALL SECTION
1/4" = 1'-0"
BUILDING SECTIONS (INTERIOR WALLS)
C E
A
A-301
CUBICLES
CONFERENCE
OFFICE
OFFICE
OFFICE
COMMUNICATIONS
HALLWAY
ENTRANCE/LOCKERS
106 107
101B
101A
102B
102A
A A A A
B B B
W1
W1
W4
W1
W1
W1
W1
W1 W1
W1
W2
W2
W1
W1
W1
W4
W1
W4W4W4W4
W1
W1 W1
CABLE SHOP
300K CLEANROOM
'-7
/8
66'-2" 12'-2 1/8"
23'-2 7/8" 10'-6" 10'-9 5/8" 10'-10 7/8" 11'-7 7/8"
'-1
3/
8" 7'
-0
/8
'-3
/8
4'-3 1/2" 13'-6" 12'-0" 12'-0" 12'-0"
3'-5" 3'-5" 3'-5"
C
LE
AR
6' -5
/2
C
LE
AR
5' -0
A-402
A-402
3/A-402
2/ A-
MIN.
7'-1"
CLEAR
10'-6 3/8"
CR1
CR1
2' -1
0" 1/
2" G
AP
ALUMINUM THRESHOLD
W1
PRINTER COUNTER
18" D x 5'-0" L
1' -7
6/A-402
S
TC
M
IN
W1
W1
W1
SECURITY WALL
FLOOR TO DECK ABOVE, GRID 7 FROM GRID A - GRID N
FLOOR TO GYPSUM BOARD CEILING, FIRE 120-L1 & FIRE 123-L2
L
L
W1
JANITOR
1/A-402
4/A-402
5/ A-
W4
CR1
W4W4
W4
W4
W2
W4
7' -7
/4
W2
3/ 8"
MECHANICAL
ELECTRICAL
118a
STORAGE
100K CLEANROOM
10'-7"
1' -1
5/
8"
1' -1
5/
8"
2'-5 3/8" 4'-8 5/8" 1'-4 3/8"
5/
8"
W1
5/8" GYPSUM BOARD
5/8" GYPSUM BOARD
3 5/8" METAL STUDS @ 16" oc
(20 GAUGE)
4 7/8"
5/8" GYPSUM BOARD
3 5/8" METAL STUDS @ 16" oc
(20 GAUGE)
4 1/4"
W1
W2
W4
2" MINERAL FIBER, 3 pcf, FRICTION FIT
IN SPACE, FROM FLOOR
TO CEILING @ BRAIDING 122, PMS 124
AND WALL BETWEEN 104 & 105 ONLY
(STC 45)
WALL TYPES
NOTE:
1. ALL WALLS TO EXTEND FROM FLOOR TO 6" ABOVE CEILING LINE UNLESS NOTED.
5/8" TYPE 'X' GYPSUM BOARD
5/8" TYPE 'X' GYPSUM BOARD
600S162-54 (33KSI) @ 16" oc (16 GAUGE) 6" x 1 5/8" FLANGE STUDS
7 1/4"
SECURITY
WALL
UL419
EXTEND TO
DECK ABV.
MODULAR
CLEANROOM WALL
4 1/4"
CR1
BRIDGING @ 5'-0" oc, VERTICALLY
EXPANDED METAL MESH
INT. EXT.
GENERAL NOTES
1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE. LARGER SCALE
DRAWING SHALL HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS. THE GENERAL CONTRACTOR
SHALL NOTIFY THE ARCHITECT OF ANY DIMENSION DISCREPANCIES OR CONFLICTS BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
2. CONTRACTOR SHALL VERIFY LAY-OUT OF STRUCTURAL, MECHANICAL, AND ELECTRICAL.
3. ALL INTERIOR DIMENSIONS ARE TO/FROM FACE OF STUD. DIMENSIONS MARKED 'CLEAR' OR 'CLR' ARE FROM FACE OF FINISH TO FACE OF FINISH AND SHALL BE MAINTAINED AND CANNOT BE FIELD ADJUSTED
WITHOUT PRIOR APPROVAL OF THE ARCHITECT.
4. ALL DOOR FRAMES SHALL BE MIN. 4" FROM SIDE WALL UNLESS NOTED OTHERWISE.
5. CG = CORNER GUARD. SEE A-601
FEC = SEMI RECESSED FIRE EXTINGUISHER. SEE 13/A-4026.
7. BLOCKING TO BE PROVIDED FOR ALL WALL MOUNTED EQUIPMENT SEE 10/A-402
8. WINDOW TYPES - SEE SHEET A-602 XX
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-401
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
E N
L A
R G
E D
P L A
N S
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
1/4" = 1'-0"
ENLARGED ADMINISTRATION
1/4" = 1'-0"
JANITOR 117
NORTH
A D
D
EN
1/
BASE
GYPSUM BOARD
(PAINT)
8' -6
BI-LEVEL DRINK FOUNTAIN
SEE PLUMBING PLAN
EXISTING CONC. FLOOR
DOUBLE TIER LOCKERS
W/ SLOPED TOP
ENTRANCE/LOCKERS
BASE
H.M. FRAME W/ WOOD DOOR
GYPSUM BOARD
(PAINT)
MOP SINK
BASE
SS SHELF W/ MOP HOLDERS
FRP WAINSCOT
JANITOR
PAINTED GYPSUM BOARD
3'-0"
4' -0
4'-0"
MOP SINK FAUCET
SS SHELVING
NIC
ENTRANCE/LOCKERS
METAL BRACKETS
30 CELL PHONE LOCKERS
DOUBLE TIER LOCKERS
W/ SLOPED TOP
BASE
GYPSUM BOARD
(PAINT)
A-402
4' -0
JANITOR
BASE MOP SINK
FRP WAINSCOT
PAINTED GYPSUM BOARD
MOP SINK FAUCET
SS SHELF W/ MOP HOLDERS
4'-0"
CEILING MOUNTED PROJECTOR
ATTACH TO STRUCTURE ABOVE
OWNER PROVIDED
CEILING MOUNTED SCREEN
ATTACH TO STRUCTURE ABOVE
BASE
C
C
EXISTING CONCRETE
COLUMN
SCHEDULED WALL
SCHEDULED WALL
E
E
SCHEDULED WALL
SCHEDULED WALL
SCHEDULED DOOR
& FRAME
EXISTING CONCRETE COLUMN
L
L
2 2
ALIGN GYPSUM BOARD W/
SIDE OF COLUMN
SCHEDULED WALL
EXISTING COLUMN
EXISTING DOOR
& FRAME
WALL FRAMING
(20 GA. TYPICAL U.N.O.)
16 GA. MTL MOUNTING STRAP
V A
R
IE
S
F V
W
E Q
U
IP
M E
N T
NOTE:
FIELD VERIFY ALL EXISTING WALLS TO RECEIVE BLOCKING
2"
EXISTING ROOF STRUCTURE
SLIP JOINT CHANNEL
SCHEDULED WALL - EXTEND
TO DECK ABOVE
3'
6"
FIRE EXTINGUISHER
CABINET, SEE /13 A-402
SCHEDULED
WALL
SEMI RECESSED FIRE
EXTINGUISHER CABINET
ENTRANCE/LOCKERS
HALLWAY
109'-6"
109'-0"
108'-6"
109'-0"
SCHEDULED WALL
LAY-IN TILE CEILING
LAY-IN TILE CEILING
METAL BRACKETS
30 CELL PHONE LOCKERS
SCHEDULED WALL
3' -6
BASE
1" PLASTIC LAMINATE SHELF
1'-4"
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-402
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
IN
T
E R
IO
R
E L E
V A
T
IO
N S
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL 1/4" = 1'-0"
DRINKING FOUNTAIN
1/4" = 1'-0"
ENTRANCE / LOCKERS - 101
1/4" = 1'-0"
JANITOR - 117
1/4" = 1'-0"
ENTRANCE / LOCKERS - 101
1/4" = 1'-0"
JANITOR - 117
1/4" = 1'-0"
CONFERENCE - 104
1" = 1'-0"
EXISTING COLUMN DETAIL
1" = 1'-0"
EXISTING COLUMN DETAIL
1" = 1'-0"
EXISTING COLUMN - DOCK AREA
1" = 1'-0"
TYPICAL BLOCKING
1" = 1'-0"
TOP OF SECURITY WALL
1/2" = 1'-0"
FEC ELEVATION
3" = 1'-0"
RECESSED FIRE CABINET
3/4" = 1'-0"
HALL HEADER
3/8" = 1'-0"
SECTION
DN
C E G J L
2 2
6 6
BA D F H K M N
LOADING DOCK
OFFICE AREA
300K CLEANROOM
MOTOR
VIBRATION
CHANGE
100K CLEANROOM
JANITOR
MECHANICAL
DEMIL
BRAIDING
122FIRE
CONFERENCE
OFFICE
OFFICE
OFFICE
COMMUNICATIONS
HALLWAY
ENTRANCE/LOCKERS
CABLE SHOP
CABLE SHOP
STORAGE
CUBICLES
FORKLIFT TRAVEL
EXISTING STAIRS
W1 W1W1
W1
C1 F1
B1
W1 W1W1
W1
C1 F2
B1
W1 W1W1
W1
C1 F2
B1
W1 W1W1
W1
C1 F1
B1
W1 W1W1
W1
C1 F1
B1
W1 W1W1
W1
C1 F1
B1
W1 W1W1
W1
C1 F1
B1
W6 W6W6
W1
C1 F1
B1
W2 W2/W3W2
W2
C3 F3
B3, B1 @ GB WALLS
W3 W2W2
W2
C3 F3
B3
W1 W1W1
W1
C2 F4
B1
W1 W1W1
W1
C3 F4
B1
W1 W5W1
W5
C2 F4
B1
W1 W1W1
W5
C2 F4
B1
W1 W1W1
W1
C1 F3
B1
W1 W1W1
W1
C1 F3
B1
CG
CG
CGCG CG CG
CG
CGCG
CG
CG
W3 W3W3
W3
C4 F5
B2
W3 W3W3
W3
C4 F5
B2
W3 W3W3
W3
C4 F5
B2
W3 W3W3
W3
C4 F5
B2
W3 W3W3
W3
C4 F5
B2
W6 W5W6
W1
C3 F4
B1
ELECTRICAL
118a
CG CG
CGCG
NOTE:
PLYWOOD IN
108 TO BE FIRE
TREATED
WALLS
W1 PAINT, FULL HEIGHT
W2 PAINT, FLOOR TO 12'-0" HIGH
W3 MODULAR CLEANROOM WALL
W4 CERAMIC TILE - SEE ELEVATION FOR PATTERN
W5 EXISTING TO REMAIN
W6 3/4" PLYWOOD, FLOOR TO CEILING
(FIRE TREATED IN COMM 108)
FLOORING
F1 CARPET TILES
F2 12" VCT
F3 CONCRETE - EPOXY PAINT
F4 EXPOSED CONCRETE
F5 12" VCT, STATIC DISSIPATIVE
BASE
B1 RUBBER BASE - 4" COVED
B2 SHEET VINYL - 4" COVED
B3 NONE
CEILING
C1 2x4 LAY-IN
C2 GYPSUM BOARD
C3 OPEN TO STRUCTURE
C4 2x4 LAY-IN, GASKETED
WX
WXWX
WX
FX
BX
CX
CEILING TYPE
BASE TYPE
WALL FINISH TYPE
(FINISH TO INCLUDE CORNER
TO CORNER AND COLUMNS)
FLOORING TYPE
FINISH SCHEDULE SYMBOL
CORNER GUARDS
CG STAINLESS STEEL
ROOM SIGNAGE
BY OWNER
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-601
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
F
IN
I S H
F L O
O R
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
3/32" = 1'-0"
FINISH FLOOR PLAN
NORTH
A D
D
EN
1/
B C
WOOD METAL W/ GLASS
2"
2"
SCHEDULE
SEE
SCHEDULE
SEE 2"
'-0
'-0
HOLLOW METAL
PAINTED
HOLLOW METAL
PAINTED
A-602
A-602
A-602
A-602
A
METAL
3' -6
3'
-0
6"
6" 2'-0" 6"
1 3/8" TEMPERED GLAZING
BUTT JOINT, 2" ALUMINUM
PERIMETER FRAME, 6" BASE FRAME
C
GLAZING SCHEDULE
2 1/4" CLEAR GLAZING
3' -0
3'
-0
4'-0"
3' -0
3'
-0
6'-0"
2' -0
4'
-0
2'-0"
PASS-THRU
WINDOW
ALUMINUM
B
HOLLOW METAL
PAINT
A
HOLLOW METAL
PAINT
SCHEDULED DOOR
1/ 4"
M
AX
ALUM. THRESHOLD
SET IN SEALANT
CONC. SLAB
SWEEP
CONT. SEALANTCONT. SEALANT
SCHEDULED FRAME
SCHEDULED DOOR
WALL, AS SCHEDULED
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-602
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
S C
H E
D U
L E
S
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
DOOR SCHEDULE
MARK
LEAF SIZE
THICKNESS TYPE FINISH GLASS RATING FRAME TYPE
DETAILS
COMMENTSW H HEAD JAMB SILL
101A 3'-0" 7'-0" 1 3/4" B STAIN Y HM 2/A-602 2/A-602 1/A-602
101B 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
102A 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
102B 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
103 3'-0" 7'-0" 1 3/4" C PAINT 2/A-602 2/A-602
104 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
105 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
106 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
107 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
108 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
110 12'-0" 14'-6" 2" - 2/A-602 2/A-602 EXISTING COILING DOOR. CONTRACTOR SHALL RETURN DOOR TO
PROPER OPERATING CONDITION
111 3'-0" 7'-0" 1 3/4" A STAIN 2/A-602 2/A-602 EXISTING DOOR, NEW HARDWARE - PAINT
112 8'-0" 8'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
113 8'-0" 8'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
114 8'-0" 8'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
115A 3'-0" 7'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
115B 4'-0" 8'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
115C 3'-0" 7'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
116 8'-0" 8'-0" 2" - Y 2/A-602 2/A-602 CLEANROOM, GLASS DOOR
117 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
118 6'-0" 6'-10" 1 3/4" (2) A PAINT HM 2/A-602 2/A-602
118A 6'-0" 6'-10" 1 3/4" (2) A PAINT 2/A-602 2/A-602
118B 6'-0" 6'-10" 1 3/4" (2) A PAINT 2/A-602 2/A-602
119A 12'-0" 14'-6" 2" - 2/A-602 2/A-602 EXISTING COILING DOOR. CONTRACTOR SHALL RETURN DOOR TO
PROPER OPERATING CONDITION
119B 3'-0" 7'-0" 1 3/4" A PAINT 2/A-602 2/A-602 EXISTING DOOR, NEW HARDWARE - PAINT
120 3'-0" 7'-0" 1 3/4" A PAINT HM 2/A-602 2/A-602
121 4'-0" 7'-0" (2)B STAIN HM 2/A-602 2/A-602
122 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
123 3'-0" 7'-0" 1 3/4" A STAIN HM 2/A-602 2/A-602
124 3'-0" 7'-0" 1 3/4" B STAIN HM 2/A-602 2/A-602
WINDOW SCHEDULE
MARK QUANTITY HEIGHT WIDTH COMMENTS
A 4 3'-0" 6'-0"
B 3 3'-0" 4'-0"
C 2 2'-0" 2'-0" PASS-THRU WINDOW
D 5 4'-0" 4'-0"
1/4" = 1'-0"
DOORS AND FRAMES
1/4" = 1'-0"
WINDOWS
3" = 1'-0"
THRESHOLD DETAIL
3" = 1'-0"
HEAD / JAMB DETAIL
A D
D
EN
1/
DN
C E
E G
G J
J L
L
2 2
6 6
BA
A
D F H K M
N
N
LOADING DOCK
OFFICE AREA
300K CLEANROOM
MOTOR
VIBRATION
CHANGE
100K CLEANROOM
JANITOR
MECHANICAL
DEMIL
BRAIDING
122FIRE
CONFERENCE
OFFICE
OFFICE
OFFICE
COMMUNICATIONS
HALLWAY
ENTRANCE/LOCKERS
CABLE SHOP
CABLE SHOP
STORAGE
elec panelelec panel existing isolated pad
DOOR CONTROLS
(NEW LOCATION)
panel panel transformer panel fire riser and panelsfire riser
10 lockers shelving bench
CUBICLES
FORKLIFT TRAVEL
EXISTING STAIRS
FIRE
11 12
25.1
24.1
47 46
94 56
CAR WASH
103 77 89 71
51a
52a 4a
22a16a
15a
23a
EQUIPMENT
CAGE
18a
58a
58a
62a
HIGH FOD
46a
53a 55a26a
45a
44a
43a
42a 41a
41a
41a
40a
39a
50a
50a
35a
29a
38a
37a
36a
30a
10a
10a
10a
6a
47a
67a
47a
47a
47a
47a
47a
47a
47a
47a
47a
9a
9a
9a
5a
66a
47a
47a
47a
47a
47a
47a
47a
47a
47a
47a
7a
8a
8a
8a
2a 1a 11a 13a
14a
28a
61a
56a
3a
69a 68a 78a 77a 76a
74a70a71a72a73a
20a
21a
17a
65A sawcut floor for power as required
EW
EW
EW
ELECTRICAL
118a
EW
EW
liquid nitrogen nitrogen tanks
27a
EW
25a
31a
34a 34a
32a 33a
EW
EW
EW
50a 50a50a
EQUIPMENT FOR
CAR WASH 103
EW
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-650
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
E Q
U
IP
M E
N T
P L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2 a c t
FINAL SUBMITTAL
3/32" = 1'-0"
EQUIPMENT FLOOR PLAN - BAY G
EQUIPMENT SCHEDULE
TAG EQUIPMENT
54 CMTS 200-4586
55 CMTS 200-4585
55a TO CABINETS
56 DYNO TEST STAND
56a LECTRIEVER
57 MOTOR CONTROL TEST SYS 1
58 MOTOR CONTROL TEST SYS 2
58a SHELVING
59 TOOL BOX
60 TOOL BOX
61 VIB TABLE
61a SHOP PRINTER
62 VIB TABLE MOTOR
62a C5 OPERATIONAL STOCK
63 VIB TABLE AMP
63a MATERIAL REELS (NOT LOCATED)
64 AHU
65A RCTS
66a WL DESK
67 OIL TABLE
67a WL DESK
68 DESK
68a BRAIDING MACHINE
69 OIL TABLE
69a BRAIDING MACHINE
70 DESK
70a BRAIDING MACHINE
71 DESK
71a BRAIDING MACHINE
72a BRAIDING MACHINE
73a BRAIDING MACHINE
74a BRAIDING MACHINE
75 COMPUTER DESK
76 COMPUTER DESK
76a BRAIDING MACHINE
77 COMPUTER DESK
77a BRAIDING MACHINE
78 FLAMMABLE CABINET
78a BRAIDING MACHINE
79 GMCTS
80 FILL & BLEED
81 GMCTS
83 GMCTS
86 ICTS
87 VIB TABLE CONTROL
88 STORAGE SHELVES
89 STORAGE SHELVES
92 AVTRON DYNAMIC #2
93 AVTRON APS #2
94 CLEANER
96 LEKTREVER 2
97 LEKTREVER 3
100 1K JIB CRANE (PORTABLE)
101 CARTS
EQUIPMENT SCHEDULE
TAG EQUIPMENT
1 AVTRON STATIC #1
1a DTMCO
2 AVTRON DYNAMIC #1
2a CABINETS
3 AVTRON STATIC #2
3a LECTRIEVER
4 AVTRON APS #1
4a LECTRIEVER
5a TABLE
6a TABLE
7a TABLE
8a TABLE
9a TABLE
10 WORK BENCH
10a TABLE
11 WORK BENCH
11a CIRRIS
12 WORK BENCH
13 WORK BENCH
13a CABINETS
14a LAYOUT TABLE
15 PARTS CLEANER
15a LECTRIEVER
16 DRAIN TABLE
16a LECTRIEVER
17a DLA COMPUTER
19 ARBOR PRESS
20 TOOL BOX (NOT LOCATED)
20a SMRF BIN
21 HYD CONSOLE TEST STAND
21a FORKLIFT CHARGER
22 HYD CONSOLE COMPUTER
22a LECTRIEVER
23 HYD CONSOLE TEST STAND
23a MYLAR CABINETS
24 HYD CONSOLE COMPUTER
24.1 LTS
25 ACC TEST CART
25.1 PARTS CLEANER
25a TOOL TABLE
26a FREEZER
27a LECTRIEVER
28a LECTRIEVER
29a LASER ETCH IUID
30a TABLE
31a NON-FLAMMABLE CABINET
32 WORK BENCH
32a CTK
33 WORK BENCH
33a CTK
34 WORK BENCH
34a FLAMMABLE LOCKER
35 WORK BENCH
35a VIDMAR CABINET
36 ACC TEST CART
36a LABEL WORKSTATION
37 MAGNETIC CHARGER
37a LABEL WORKSTATION
38a LABEL WORKSTATION
39a TOOLBOX CTK
40a TOOLBOX
41a CART
42a HAZ WASTE CABINET
43a CABINET
44a TABLE
45a LOAD BANK
46 WORK BENCH
47 WORK BENCH
47a WORKSTATION
48 AIR CLEAN 6000
49 MOBILE STORAGE SHELVES
50 CART
50a WORKSTATION
51 OVEN
51a LECTRIEVER
52 MOBILE PRINTER CART
52a LECTRIEVER
53 DYNO TEST STAND
53a POINT OF USE
OPEN TO EXISTING STRUCTURE
C E
E G
G J
J L
L
2 2
6 6
BA
A
D F H K M
N
N
OPEN TO EXISTING STRUCTURE
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
8'-6" 8'-6" 8'-6"
9'-6"9'-6"
9'-6"9'-6"
8'-0"
OPEN TO EXISTING STRUCTURE
CEILING MOUNTED
PROJECTOR - SEE ELEVATION
CEILING MOUNTED
SCREEN - SEE ELEVATION
8'-0"
2007 SF
MECHANICAL
STORAGE
FIRE
DEMIL
BRAIDING
FIRE
CABLE SHOP
FORKLIFT TRAVEL
CABLE SHOP
300K CLEANROOM
MOTOR
VIBRATION
CHANGE
100K CLEANROOM
JANITOR
COMMUNICATIONS
OFFICE
OFFICE
OFFICE
CONFERENCE
HALLWAY
CUBICLES
ENTRANCE/LOCKERS
LOADING DOCK
ELECTRICAL
118a
A-402
9'-0"
PARTICLE MEASURING SYSTEM
OPEN
DOWNLIGHT
2x2 TROFFER LIGHT
2x4 TROFFER LIGHT
2'x4' LAY-IN CEILING TILE & GRID
CEILING SPEAKER
SUSPENDED GYPSUM BOARD CEILING
ROOMS 120 & 123 SHALL HAVE EXPANDED
METAL MESH INSTALLED BETWEEN
GYPSUM BOARD & FRAMING.
CEILING LEGEND
COORDINATE LIGHTING, MECHANCIAL AND EQUIPMENT LAYOUT w/ RCP, MECHANICAL AND ELECTRICAL DRAWINGS.
REPORT ANY CONFLICTS TO ARCHITECT FOR CLARIFICATION.
CEILING HUNG STRIP LIGHTING
MECHANICAL RETURN
MECHANICAL SUPPLY
MECHANICAL RETURN
HIGH BAY LIGHTING
BATT. INSULATION
P R O J E C T
M A N A G E R
D E S
IG
N E D
B Y
D R A W N
B Y
K R S M
N U M B E R
S
IT
E
C O D E
D A T E
C H E C K E D
B Y
D E P A R T M E N T
O F
T H E
A
IR
F O R C E
T H
C
IV
IL
E N G
IN
E E R
G R O U P
T H
A
IR
B A S E
W
IN
G
IF SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT.
REDUCE SCALE ACCORDINGLY
SHEET OF
A-701
R E
N O
V A
T E
S O
U T
H E
R N
B A
Y G
F O
R N
E W
W O
R K
L O
A D
B
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
S O a c t
R
IG
O B
E R
T O
L E
O N
/2
/2
R S
FINAL SUBMITTAL
3/32" = 1'-0"
REFLECTED CEILING PLAN
File details come from the government source that posted it. Updated .