J85 Safety Appendix C.pdf

PDF 69 KB Posted

Attached to
J85 MISTR REPAIR Federal contract opportunity
Solicitation number
FA8122-10-R-0012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Appendix C - Safety

View the file

Other files for this federal contract opportunity

Other files attached to J85 MISTR REPAIR, newest first.
File Type Posted
FA8122-10-R-0012 0007.pdf PDF
J85 PWS 12 Sep 2011.pdf PDF
J85 SECTION M.pdf PDF
FA812210R0012_______0006.pdf PDF
J85 PWS.pdf PDF
FA812210R0012_______0003.pdf PDF
J85 App B —
Amendment 0001.pdf PDF
Source Selection Notice.docx DOCX document
J85 CDRLS.pdf PDF
J85 Performance Plan.pdf PDF
J85 Packaging.pdf PDF
J85 CAR for PP.pdf PDF
Appendix B.pdf PDF
J85 Section L.pdf PDF
J85 PWS.pdf PDF
J85 IPE.pdf PDF
J85 RFP4.pdf PDF
J85 RFP 1.pdf PDF
J85 RFP 2.pdf PDF
J85 RFP 5.pdf PDF
Destination.docx DOCX document
Update to SAR approval.pdf PDF
RQR letter dated 10 Feb 11.pdf PDF
J85 MISTR Items Identified for breakout for SB set aside.docx DOCX document
RQR for NSNs on J85 contract.pdf PDF
J85 Pre-solicitation Attendees.pdf PDF
Form for Foreign Participants.pdf PDF
Attachement TWO - Pricing Matrix.pdf PDF
Corrective Action Report —
Appendix C - Safety.pdf PDF
Appendix B.pdf PDF
J85 SECTION L.docx DOCX document
FA8122-10-R-0012 - 3.pdf PDF
PWS.pdf PDF
FA8122-10-R-0012 - 1.pdf PDF
ATTACHMENT L.docx DOCX document
Exhibit A - CDRL -2.pdf PDF
Attachment ONE - IPE.pdf PDF
Form 158 - SPI -1.pdf PDF
Exhibit A - CDRL -1.pdf PDF
Sources Sought Synopsis.doc DOC document
Industry Day Attendees.pdf PDF
Industry Day - Q A.pdf PDF
J85 RQR-1 Rev 1.pdf PDF
J85 RQR revision.pdf PDF
J85 Industry Day Dec 15 2009 FINAL as of Dec 11.pptx PPTX presentation
J85 RQR-1.pdf PDF
J85 RQR-2.pdf PDF
Map to the Boeing Bldg.pdf PDF
Show all 50

J85 MISTR REPAIR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD2030-10-26763 1

24 MAR 2010

APPENDIX C

SAFETY SPECIFICATION

REPAIR, OVERHAUL, AND MODIFICATION

OF

J85-GE-5/-21 MISTR COMPONENTS

PR NO: FD2030-10-26763

PREFILE NO: SEG-10-177

PREPARED BY: 72 ABW/SEG

FD2030-10-26763 2

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap notification/reporting as defined in paragraph I.B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program

Elements, Section II and to be used during performance of the work described in the contract.

B. Mishap Notification.

1. The contractor shall notify the procuring Safety Office or a designated Government

Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the

Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.

2. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

FD2030-10-26763 3

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements

Element/Requirement Referenced Benchmark

Mishap Notification/Reporting AFI 91-204

Housekeeping AFOSH Std 91-501

Material Handling Equipment (MHE) AFOSH Std 91-46 and

AFOSH Std 91-501

Handling, Storage and Use of AFOSH Std 91-501

Flammable/Combustible Liquid

Vehicle Operations AFI 91-207

Tool Control AFI 21-101, AFMC Sup

Foreign Object Damage (FOD) AFI 21-101, AFMC Sup

Tobacco Use in the Air Force AFI 40-102

Hazardous Energy Control AFOSH Std 91-501

Confined Spaces AFOSH Std 91-25

FD2030-10-26763 4

SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES

These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.

AFI 91-204 Feb 06 Safety Investigations and Reports

AFI 91-207 May 07 USAF Traffic Safety Program

AFOSH Std 91-66 Oct 97 General Industrial Operations

AFOSH Std 91-501 Jul 04 Air Force Consolidated Occupational Safety Standard

AFOSH Std 91-100 May 98 Aircraft Flight Line – Ground Operations and Activities

AFI 21-101 Jun 06 Aircraft and Equipment Maintenance Management

AFI 21-101,

AFMC Sup Dec 07 Aircraft and Equipment Maintenance Management

AFI 40-102 Jun 02 Tobacco Use in the Air Force

AFOSH Std 91-25 Feb 98 Confined Spaces

File details come from the government source that posted it. Updated .