FY13LAUGHLINPROPAK1.xls
XLS spreadsheet 166 KB Posted
- Attached to
- REQUEST FOR PROPOSAL HOSPITAL ASEPTIC MANAGEMENT SERVICES (HAMS) Federal contract opportunity
- Solicitation number
- FA8052-12-R-0004
About this file
Exhibit 2 replaced in its entirety as of 27 February 2012
View the file
Other files for this federal contract opportunity
Show all 50
REQUEST FOR PROPOSAL HOSPITAL ASEPTIC MANAGEMENT SERVICES (HAMS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAGE
| LAUGHLIN | |||
| BASIC WAGE | $/HOUR | ||
| house keeper = | $0.00 | ||
| shift dif. | $0.00 | ||
| SUB TOTAL = | $0.00 | ||
| fica/w.comp | 0.00% | SUB TOTAL = | $0.00 |
| SUB TOTAL = | $0.00 | ||
| G&A + O.H. % | 0.00% | ||
| FRINGES | |||
| h + w | $0.00 | SUB TOTAL = | $0.00 |
| pension | $0.00 | ||
| training | $0.00 | PROFIT % | 0.00% |
| SUB TOTAL = | $0.00 | LOADED WAGE | $0.00 |
| Supplies/Equipment % | 0.00% | ||
| LOADED WAGE W/ | $0.00 | ||
| SUPPLIES & EQUIP | |||
| SITE MANAGER | $/HOUR | ||
| Certified Executive Housekeeper | $0.00 | ||
| CONTRACTOR INSTRUCTIONS TO COMPLETE CELLS HIGHLIGTED IN YELLOW: | |||
| 1. Contractor must insert wage in cell C4. | |||
| 2. Contractor must insert shift differential in cell C5. | |||
| 3. Contractor must insert a compiled percentage of all governmental imposed taxes and fee's | |||
| in cell C7. | |||
| 4. Contractor must insert a health and welfare hourly cost in cell C11. | |||
| 5. Contractor must insert a pension hourly cost in cell C12. | |||
| 6. Contractor must insert a new training fund hourly cost in cell C13. | |||
| 7. Contractor must insert a compiled percentage of all general administrative and overhead | |||
| in cell G9. | |||
| 8. Contractor must insert a percentage proposing the profit to be earned on all direct labor | |||
| in cell G13. | |||
| 9. Contractor must insert a compiled percentage of all suplies, eguipment and consumable | |||
| supply cost into the formulae at cell G18. | |||
| 10. Contractor must insert hour rates for CEH in cell G24. | |||
| OUTPUT: | |||
| 1. Loaded wage with supplies and equipment and average supervisory wage will be carried | |||
| forward to the price proposal sheet. |
staff
| LAUGHLIN | |||||||
| BASIC HAMS | 0% | ||||||
| RS | PRODUCTIVITY | IMFE | HOURS PER | HOURS | UNWORKED | PROPOSED | |
| # | RATE | SQ. FT. | DAY | PER MO. | PAID HOURS | HOURS | |
| (SQ. FT./HOUR) | (C / D) | (7-DAY: D x 30.4) | PER MO. | PER MO. | |||
| (5-DAY: D x 21.7) | (E x G3) | (E + G) | |||||
| 7 | 64,636 | 0.00 | 0.00 | 0.0 | 0.0 | ||
| 10 | 64,636 | 0.00 | 0.00 | 0.0 | 0.0 | ||
| 12.0 | 64,636 | 0.00 | 0.00 | 0.0 | 0.0 | ||
| TOTAL | 0 | ||||||
| CYCLE TASKS | |||||||
| UNWORKED | PROPOSED | ||||||
| LINE ITEM | RATE | SQ.FT. | HOURS PER | OCCURANCE | ADJUSTED HOURS | PAID HOURS | HOURS |
| (SQ. FT./HOUR) | OCCURANCE | PER YEAR | PER MONTH | PER MO. | PER MO. | ||
| (C / B) | ((D X E)/12) | (F x G3) | (F + G) | ||||
| LGT. FXT. | 64,636 | 0 | 2 | 0 | 0.0 | 0.0 | |
| EXT.WIND. | 64,636 | 0 | 1 | 0 | 0.0 | 0.0 | |
| COVERS | 64,636 | 0 | 1 | 0 | 0.0 | 0.0 | |
| DAYTIME DEDICATED FTE | N/A | 0.00 | 12 | 0 | 0.0 | 0.0 | |
| TOTAL | 0.0 | ||||||
| SUPERVISOR | PROPOSED | ||||||
| HOURS | |||||||
| LINE ITEM | QTY | MONTHLY HOURS | PER MO. | ||||
| SITE MANAGER | 0.0 | ||||||
| TOTAL | 0.0 | ||||||
| TOTAL MONTHLY BASIC HOURS: | 0 | ||||||
| NOTES: | |||||||
| 1. IMFE SQ.FT. per RS category is from the IMFE page 1. | |||||||
| 2. Cyle Task line items are from the IMFE narrative section. | |||||||
| 3. The surchage requirement for dedicated personnel is taken from the IMFE narrative section. | |||||||
| CONTRACTOR INSTRUCTIONS TO COMPLETE CELLS HIGHLIGTED IN YELLOW: | |||||||
| 1. Contractor must insert his own productivity rates in column B. | |||||||
| 2. Contractor must insert his own percentage representing hours that will be paid but not | |||||||
| worked in cell G3. This includes all labor burden hours for sick leave, vacation leave, | |||||||
| jury duty, bereavement leave, ect., as required by the CBA as a minium. | |||||||
| 3. Contracgtor must insert hours per ocurance as required in cells D28>D32. | |||||||
| 4. Contractor must insert quantity and monthly hours for CEH . | |||||||
| OUTPUT: | |||||||
| 1. Total monthly hours in cells D38 and D42 are added together and carried forward to the | |||||||
| price proposalspreadsheet (schedule B). |
PRICE
| TOTAL MONTHLY BASIC HOURS | 12/31/99 |
| LOADED WAGE W/ SUPPLES & EQUIP | $0.0000 |
| TOTAL MONTHLY BASIC COST | $0.00 |
| TOTAL MONTHLY SUPERVISORY HOURS | 0 |
| SUPERVISORY WAGE | $0.0000 |
| TOTAL MONTHLY SUPERVISORY COST | $0.00 |
| TOTAL MONTLY COST | $0.00 |
| TOTAL BASIC HAMS SQ. FT | 64,636 |
| TOTAL MONTHLY COST PER SQ. FT. | $0.00 |
| NOTES: | |
| 1. Total Basic HAMS SQ.FT. is from the IMFE section 2. | |
| OUTPUT: | |
| 1. Total Monthly Cost per SQ.FT. is carried forward to the Schedule B. | |
| 2. Total Basic HAMS SQ.FT. is carrried forward to the Schedule B. |
SCHED B
| SCHEDULE B - ESTIMATE - LAUGHLIN- PERIOD 01 OCT 12 - 30 Sept., 13. | BASE YEAR | ||||
| ITEM # | COST PER SQ. FT. | SQ. FT. | COST PER MONTH | MONTHS | ANNUAL COST |
| PER MONTH | |||||
| OOO1 | $0.00 | 64,636 | $0.00 | 12 | $0.00 |
| HAMS SERVICES | |||||
| SCHEDULE B - ESTIMATE -LAUGHLIN - PERIOD 01 OCT 13 - 30 Sept., 14. | OPTION YEAR 1 | ||||
| ITEM # | COST PER SQ. FT. | SQ. FT. | COST PER MONTH | MONTHS | ANNUAL COST |
| PER MONTH | |||||
| OOO1 | 0 | 64,636 | $0.00 | 12 | $0.00 |
| HAMS SERVICES | |||||
| SCHEDULE B - ESTIMATE - LAUGHLIN - PERIOD 01 OCT 14 - 30 Sept., 15. | OPTION YEAR 2 | ||||
| ITEM # | COST PER SQ. FT. | SQ. FT. | COST PER MONTH | MONTHS | ANNUAL COST |
| PER MONTH | |||||
| OOO1 | 0 | 64,636 | $0.00 | 12 | $0.00 |
| HAMS SERVICES | |||||
| SCHEDULE B - ESTIMATE - LAUGHLIN - PERIOD 01 OCT 15 - 30 Sept., 16. | OPTION YEAR 3 | ||||
| ITEM # | COST PER SQ. FT. | SQ. FT. | COST PER MONTH | MONTHS | ANNUAL COST |
| PER MONTH | |||||
| OOO1 | 0 | 64,636 | $0.00 | 12 | $0.00 |
| HAMS SERVICES | |||||
| SCHEDULE B - ESTIMATE - LAUGHLIN - PERIOD 01 OCT 16 - 30 Sept., 17. | OPTION YEAR 4 | ||||
| ITEM # | COST PER SQ. FT. | SQ. FT. | COST PER MONTH | MONTHS | ANNUAL COST |
| PER MONTH | |||||
| OOO1 | 0 | 64,636 | $0.00 | 12 | $0.00 |
| HAMS SERVICES | |||||
| 1. The initial year price per sq. ft./mo. (cell B6) will propogate from the completed cell @ PRICE D12. | |||||
| The spreadsheet will propogate for FY13. | |||||
| 2. For option year sq. ft. per month price (column B) add a decimal # representing a percentage increase into the formulae after | |||||
| the whole multiplier of one (1). Example: =B6 *1.05. This would show a 5% escalation in price over the base year price. |
LAUGHLIN
| LAUGHLIN | TECHNICAL EXHIBIT 2 | ||||||
| INDIVIDUAL MEDICAL FACILITY EXHIBIT | |||||||
| (IMFE) FOR | |||||||
| 47th MEDICAL GROUP CLINIC | |||||||
| herein known as the Medical Treatment Facility (MTF) located | |||||||
| in Del Rio,TX. | |||||||
| 1. This IMFE supplements and takes precedence over the Hospital | |||||||
| Aseptic Management System (HAMS) Performance Work Statement (PWS). | |||||||
| It expands on the PWS requirements or deletes PWS requirements not | |||||||
| applicable to this "full service hospital". It also establishes the | |||||||
| frequency of performance of cycle task line items required | |||||||
| at a frequency less often less often than daily or weekdays. | |||||||
| 2. This Clinic is listed in the USAF MEDICAL LOGISTICS DIRECTORY | |||||||
| as having 0 operating beds. | |||||||
| The following buildings are currently included in this contract. | |||||||
| BLDG # | RS # 1 | RS#2 | RS#3 | RS # 5 | RS#6 | RS#7 | |
| LAUGHLIN AFB: | |||||||
| 00375 | LAUGHLIN AFB CLINIC | 64,636 | |||||
| TOTALS | 0 | 0 | 0 | 0 | 0 | 64,636 | |
| TOTAL ESTIMATED SQUARE FOOTAGE BASIC HAMS'= | 64,636 | ||||||
| I, Dale A. Boutwell, in my capacity as Facility Manager at the 47TH | |||||||
| MEDICAL GROUP CLINIC, LAUGHLIN AFB TX, DO VERIFY AND VALIDATE THIS IMFE | |||||||
| AS HAVING ADEQUATELY AND ACCURATELY TAILORED THE P.W.S. REQUIREMENTS TO | |||||||
| SPECIFIC REQUIREMENTS OF THE 47TH MEDICAL GROUP, EFFECTIVE 1 Oct., 2012. | |||||||
| THIS VALIDATION INCLUDES, BUT IS NOT LIMITED TO, ASSURING THAT EACH ROOM | |||||||
| TO BE ON CONTRACT IS INCLUDED ON THE CORRECT RS CATEGORY AND | |||||||
| THAT ALL THE SQ. FT. TO BE CLEANED IS INCLUDED IN THE SQ. FT. SUMMATION, | |||||||
| BY RS CATEGORY, ON THIS PAGE. | |||||||
| ------------------------ | |||||||
| Dale A Boutwell | |||||||
| SEE BUILDING/ROOM LISTINGS FOR BUILDING AND ROOM NUMBERS, | |||||||
| RS CATEGORY, AND SQUARE FEET OF INDIVIDUAL ROOMS. | |||||||
| 47TH MEDICAL GROUP CLINIC, LAUGHLIN AFB, TX | |||||||
| 3. Contractor employees will be allowed to eat meals in the Housekeeping Office. | |||||||
| 4. The water and soil in the area are described below: | |||||||
| No specific microorganisms that will affect disinfectants. | |||||||
| Water PH factor is between 5 and 7 | |||||||
| Soil PH factor is between 5 & 7 | |||||||
| 5. GOVERNMENT-FURNISHED FACILITIES/ADMINISTRATIVE AND STORAGE SPACE: | |||||||
| (Reference PWS 2.3.3) | |||||||
| The following space will be provided for Contractor's use. | |||||||
| ALL ROOMS LISTED AS MEPRS CODE EFAA | |||||||
| 6. GOVERNMENT-FURNISHED SUPPLIES, MATERIALS, AND EQUIPMENT: | |||||||
| (Reference PWS 2.3.8 - 2.3.8.3) | |||||||
| Government Furnished Items | |||||||
| The following office furniture etc. will be provided for Contractor's use. | |||||||
| FURNITURE/EQUIPMENT | Quantity | ||||||
| Desk | 1 | Coat Rack | 1 | ||||
| Chairs | 4 | Locker | 1 | ||||
| Filing Cabinet | (5 drawer) | 1 | Computer | 1 | |||
| Credenza | 1 | Monitor | 1 | ||||
| Lunch Table | 1 | Keyboard | 1 | ||||
| Filing cabinet (2 drawer) | 2 | Mouse | 1 | ||||
| Typewriter | 1 | Printer | 1 | ||||
| Telephone | 1 | 1 | |||||
| Telephone Lines | 1 | ||||||
| SHELF CABINET | 1 | ||||||
| 7. THE CONTRACTOR SHALL ASSIGN A CONTRACT MANAGER | |||||||
| TO BE LOCATED AT LAUGHLIN AFB, WHO SHALL BE THE LOCALLY ASSIGNED | |||||||
| PERSON RESPONSIBLE FOR ALL CONTRACT REQUIREMENTS AT ALL | |||||||
| LOCATIONS. (2.1.29.4) | |||||||
| 7.1.1.1. THE CONTRACT MANAGER SHALL SERVE AS AN ON-SITE MANAGER WITH | |||||||
| FULL AUTHORITY TO ACT FOR THE CONTRACTOR ON ALL CONTRACT MATTERS | |||||||
| RELATING TO DAILY OPERATION OF THIS CONTRACT. | |||||||
| 7.1.1.2. THE CONTRACT MANAGER SHALL BE ON SITE | |||||||
| BETWEEN 07:30 AND 16:30, MONDAY THROUGH FRIDAY. | |||||||
| 7.1.1.3 ALL MANAGERS (OR SHIFT LEADERS ALONE ON A SHIFT) | |||||||
| SHALL BE ACCESSIBLE TO THE QUALITY ASSURANCE EVALUATORS BY TELEPHONE | |||||||
| OR BEEPER. | |||||||
| 47TH MEDICAL GROUP CLINIC, LAUGHLIN AFB, TX | |||||||
| 8. HANDLING OF GOVERNMENT FURNITURE/EQUIPMENT: | |||||||
| (REF: PWS PARA 2.1.27) | |||||||
| It is the Contractor's responsibility to clean all rooms/areas, and | |||||||
| contents, including furniture and equipment, except for the devices | |||||||
| specified in 2.1.27.1 of the PWS or below. The following is a list of devices | |||||||
| that ARE NOT TO BE MOVED OR CLEANED or otherwise handled by contractor | |||||||
| personnel. This list has been determined by the professional staff. | |||||||
| FURNITURE/EQUIPMENT | IN ANY AREA, WHERE FOUND | ||||||
| CINE VIEWING MACHINE | LASER SYSTEM | " | |||||
| CLINICAL LAB EQUIP | MICROSCOPES | " | |||||
| CRASH CART | OCCUTOME | " | |||||
| CRYO UNIT | OTOSCOPE, BINOCULAR | " | |||||
| CULPOSCOPES | PANEL LIPS MACHINE | " | |||||
| DEFIBRILLATOR | PHACO-EMULSIFIER/CAVATRON | " | |||||
| EKG MACHINE | PROTOLOGIC SET, FIBER OPTIC | " | |||||
| EMERSON POST-OP PUMP | REFACTOMETER | " | |||||
| ENDOSCOPES | RESPIRATORS | " | |||||
| INCUBATORS | TYMPONOMETER | " | |||||
| INSTRUMENT SETS | ULTRA SOUND UNIT | " | |||||
| IVAC UNIT | VANGUARD XR-35 | " | |||||
| LASER | VIDEO EQUIPMENT | " | |||||
| X-RAY MACHINES | " | ||||||
| 9. The following consumable supplies are to be | |||||||
| provided by the Contractor. | ref PWS 2.3.10.1 | ||||||
| NOMENCLATURE | GENERAL DESCRIPTION OF ITEM | ||||||
| Paper, Toilet Roll, Single Ply 1000 Sheet/Roll | |||||||
| Paper, Towels Single Fold, 9 1/2" x 10 3/4" and | |||||||
| Triple Fold 9 1/4" x 10 1/4" | |||||||
| Plastic liners for administrative/dry waste receptacles: | SIZE 30" x 37" | ||||||
| SIZE 40" x 48" | |||||||
| SIZE 24" x 33" | |||||||
| KINDEST CARE HAND WASHING SOAP BY STERIS, ACUTE-KARE HANDWASHING | |||||||
| SOAP BY STERIS, AND PROVON FOAM HANDWASH BY GOJO (GOJ5385-02). THE CONTRACTOR IS | |||||||
| RESPONSIBLE FOR ACQUIRING NEW AND REPLACEMENT SOAP DISPENSERS REQUIRED DURING | |||||||
| THE CONTRACT PERIOD. | |||||||
| WEX-CIDE # 128 GERMICIDAL DETERGENT SHALL BE USED. | CARPET CARE: | ||||||
| SAND FOR URNS IS REQUIRED. | THE PH FOR WET SHAMPOO WILL | ||||||
| ANTISTATIC SOLUTION FOR CARPETS IS REQUIRED. | BE NO HIGHER THAN 9.5 AND | ||||||
| DRY EXTRACTION IS ACCEPTABLE. | |||||||
| 47TH MEDICAL GROUP CLINIC, LAUGHLIN AFB, TX | |||||||
| 10. REGULATED MEDICAL WASTE: (Ref PWS para 1.3.31) | |||||||
| THE 47TH MEDICAL GROUP CLINIC REGULATED MEDICAL WASTE IS BOXED, AND STORED | |||||||
| BY THE HAMS CONTRACTOR IN A ROOM ON THE LOADING DOCK OF BUILDING 375 AND THEN PROVIDED | |||||||
| TO THE WASTE HAULER ON THE HAULERS SCHEDULE. | |||||||
| RS # 11 INCENERATION IS NOT APPLICABLE. | |||||||
| 11. ADDITIONAL UNIT CHECK-OUT SERVICES (Ref PWS PARA 2.1.11.1.6) ARE N/A. | |||||||
| 12. LINEN SERVICES ARE REQUIRED 5 DAYS PER WEEK AS NECESSARY TO MEET | |||||||
| PWS PARA. 2.1.20 AS TAILORED TO THE SPECIFIC FACILITIES AS FOLLOWS: | |||||||
| PWS PARA 2.1.20.4 | LINENS ARE TO BE RECEIVED FROM THE LAUNDRY | ||||||
| CONTRACTOR MONDAY THROUGH FRIDAY, ONCE EACH PER DAY. | |||||||
| PWS PARA 2.1.20.4 | LINEN IS PROCESSED (AND RECORDED) TO THE LAUNDRY | ||||||
| CONTRACTOR BY: | |||||||
| WEIGHT. | |||||||
| PWS PARA 2.1.20.7 | DISTRIBUTION OF CLEAN LINENS AND REMOVAL OF DIRTY | ||||||
| LINENS SHALL BE COMPLETED BY 2:00 PM, 5 DAYS PER WEEK. | |||||||
| PWS PARA 2.1.20.16 | Uniform exchange area is to be staffed between | ||||||
| 07:00 - 08:00 AM. | |||||||
| PWS PARA 2.1.11.1.6 | REMOVAL AND REPLACEMENT OF PATIENT PRIVACY CURTAINS | ||||||
| Curtains will be changed when visibly soiled or as required by MTF personnel. | |||||||
| The Contractor is responsible for the following Government-owned linens: | |||||||
| Bag, soiled linen | |||||||
| Shirt, FML, scrub | |||||||
| Shirt, operating, green | |||||||
| Towel, hand, green | |||||||
| Towel, bath | |||||||
| Trousers, operating, green | |||||||
| Trousers, scrub, women | |||||||
| Undershirt, infant | |||||||
| Laundry bags | |||||||
| LINEN MARKING IS REQUIRED. | |||||||
| 47TH MEDICAL GROUP CLINIC, LAUGHLIN AFB, TX | |||||||
| . | CYCLE TASK LINE ITEMS - GOVERNMENT SPECIFIED FREQUENCIES | ||||||
| PWS PARA 2.1.12.2 | LIGHT FIXTURES: | ||||||
| Cleaning shall be started and completed during the month of December and May. | |||||||
| PWS PARA 2.1.12.3 | EXTERIOR WINDOW WASHING: | ||||||
| Shall be started and completed during the month of June. | |||||||
| WINDOW SCREENS: are to be removed, cleaned, and | |||||||
| replaced when washing exterior windows. | |||||||
| PWS PARA 2.1.12.4 | LIMITED INTERIOR DUCT CLEANING ("COVERS"): | ||||||
| Shall be started and completed during the month of December. | |||||||
| PWS PARA 2.1.12.5 | N/A | ||||||
| SUR CHARGE | TO PAY THE CONTRACTOR FOR MONTHLY MANHOURS OVER AND ABOVE | ||||||
| LINE ITEM | THAT EARNED (BY APPLICATION OF THE PRODUCTIVITY RATE PROVIDED IN | ||||||
| THE STAFFING PROPOSAL, FOR RS # 7) FOR 8 HOURS EACH WEEK DAY | |||||||
| FOR THE DAYTIME DEDICATED HOUSEKEEPER. | |||||||
| RS # 0 = ROOMS/SQ.FT. NOT ON CONTRACT. | |||||||
| BLDG. # | COUNT/SORT # | ROOM # | RS # | USE | SQ.FT. | MEPRS | |
| LAUGHLIN AFB BLDG 375 | * = DAYTIME CLEANING, 0730-1600 | ||||||
| 00375 | 1 | 101 | RS#7 | VESTIBULE | 228 | EDAA | |
| 00375 | 2 | 102 | RS#7 | LOBBY | 498 | DAAA | |
| 00375 | 3 | 103 | RS#7 | PHARMACY* | 1294 | DAAA | |
| 00375 | 4 | 104 | RS#0 | ELEC.CLOSET | 22 | DAAA | |
| 00375 | 5 | 105 | RS#0 | FLAMABLE STORAGE | 21 | DAAA | |
| 00375 | 6 | 106 | RS#7 | OFFICE | 97 | DAAA | |
| 00375 | 7 | 107 | RS#0 | STORAGE | 15 | DAAA | |
| 00375 | 8 | 108 | RS#0 | VAULT | 15 | DAAA | |
| 00375 | 9 | 109 | RS#7 | TOILET | 51 | DAAA | |
| 00375 | 10 | 110 | RS#7 | TOILET | 137 | DAAA | |
| 00375 | 11 | 111 | RS#7 | TOILET | 129 | DAAA | |
| 00375 | 12 | 112 | RS#7 | TOILET | 27 | EDAA | |
| 00375 | 13 | 113 | RS#0 | COMPUTER ROOM | 213 | EBJA | |
| 00375 | 14 | 114 | RS#0 | COMPUTER ROOM | 213 | EBJA | |
| 00375 | 15 | 115 | RS#7 | WAITING | 630 | ELAA | |
| 00375 | 16 | 116 | RS#7 | OFFICE | 121 | ELAA | |
| 00375 | 17 | 117 | RS#7 | ADMIN | 155 | ELAA | |
| 00375 | 18 | 118 | RS#7 | ADMIN | 272 | ELAA | |
| 00375 | 19 | 119 | RS#7 | OFFICE | 99 | EBBA | |
| 00375 | 20 | 120 | RS#7 | LOUNGE | 133 | ELAA | |
| 00375 | 21 | 121 | RS#7 | TOILET | 26 | ELAA | |
| 00375 | 22 | 122 | RS#7 | OFFICE | 81 | ELAA | |
| 00375 | 23 | 123 | RS#7 | OFFICE | 80 | ELAA | |
| 00375 | 24 | 124 | RS#7 | OFFICE | 205 | EDAA | |
| 00375 | 25 | 125 | RS#7 | DRESSING | 15 | DCAA | |
| 00375 | 26 | 126 | RS#7 | DRESSING | 15 | DCAA | |
| 00375 | 27 | 127 | RS#7 | TOILET | 30 | DCAA | |
| 00375 | 28 | 128 | RS#7 | TOILET | 28 | DCAA | |
| 00375 | 29 | 129 | RS#7 | X-RAY | 286 | DCAA | |
| 00375 | 30 | 130 | RS#7 | JANITORS CLOSET | 21 | EFAA | |
| 00375 | 31 | 131 | RS#7 | OFFICE | 74 | DCAA | |
| 00375 | 32 | 132 | RS#7 | WAITING | 724 | DCAA | |
| 00375 | 33 | 133 | RS#7 | X-RAY | 342 | DCAA | |
| 00375 | 34 | 135 | RS#7 | DRESSING | 15 | DCAA | |
| 00375 | 35 | 136 | RS#7 | DRESSING | 15 | DCAA | |
| 00375 | 36 | 137 | RS#7 | STORAGE | 28 | DCAA | |
| 00375 | 37 | 138 | RS#7 | TOILET | 28 | DCAA | |
| 00375 | 38 | 139 | RS#7 | X-RAY | 286 | DCAA | |
| 00375 | 39 | 140 | RS#7 | MEDICAL RECORDS | 351 | DCAA | |
| 00375 | 40 | 141 | RS#7 | OFFICE | 101 | DCAA | |
| 00375 | 41 | 142 | RS#7 | WAITING | 360 | DCAA | |
| 00375 | 42 | 143 | RS#7 | WAITING | 88 | DCAA | |
| 00375 | 43 | 144 | RS#7 | WAITING | 79 | DBAA | |
| 00375 | 44 | 145 | RS#7 | TOILET | 25 | DBAA | |
| 00375 | 45 | 146 | RS#7 | TOILET | 28 | DBAA | |
| 00375 | 46 | 147 | RS#7 | LAB | 166 | DBAA | |
| 00375 | 47 | 148 | RS#7 | TOILET | 28 | DBAA | |
| 00375 | 48 | 149 | RS#7 | LAB | 920 | DBAA | |
| 00375 | 49 | 150 | RS#7 | STORAGE | 41 | DBAA | |
| 00375 | 50 | 151 | RS#7 | LOUNGE | 149 | DBAA | |
| 00375 | 51 | 152 | RS#7 | OFFICE | 102 | DBAA | |
| 00375 | 52 | 153 | RS#7 | LAB | 141 | DBAA | |
| 00375 | 53 | 154 | RS#7 | OFFICE | 59 | DBAA | |
| 00375 | 54 | 155 | RS#7 | OFFICE | 99 | DBAA | |
| 00375 | 55 | 156 | RS#7 | TOILET | 28 | EDAA | |
| 00375 | 56 | 157 | RS#7 | STORAGE | 66 | EFAA | |
| 00375 | 57 | 158 | RS#7 | STORAGE | 127 | BFDA | |
| 00375 | 58 | 159 | RS#7 | STORAGE | 126 | BFDA | |
| 00375 | 59 | 160 | RS#0 | MECHANICAL | 2100 | EDAA | |
| 00375 | 60 | 161 | RS#0 | MECHANICAL | 597 | EDAA | |
| 00375 | 61 | 162 | RS#7 | WAITING | 184 | BFDA | |
| 00375 | 62 | 163 | RS#7 | MEDICAL RECORDS | 124 | BFDA | |
| 00375 | 63 | 164 | RS#7 | OFFICE | 91 | BFDA | |
| 00375 | 64 | 165 | RS#7 | OFFICE | 135 | BFDA | |
| 00375 | 65 | 166 | RS#7 | OFFICE | 115 | BFDA | |
| 00375 | 66 | 167 | RS#7 | OFFICE | 99 | BFDA | |
| 00375 | 67 | 169 | RS#7 | OFFICE | 85 | BFDA | |
| 00375 | 68 | 170 | RS#7 | OFFICE | 125 | BFDA | |
| 00375 | 69 | 171 | RS#7 | OFFICE | 147 | BFDA | |
| 00375 | 70 | 172 | RS#7 | OFFICE | 105 | BFDA | |
| 00375 | 71 | 173 | RS#7 | LOUNGE | 66 | BFDA | |
| 00375 | 72 | 174 | RS#7 | OFFICE | 148 | BFDA | |
| 00375 | 73 | 175 | RS#7 | JANITORS CLOSET | 17 | EFAA | |
| 00375 | 74 | 176 | RS#7 | TOILET | 61 | BFDA | |
| 00375 | 75 | 177 | RS#7 | STORAGE | 170 | EEAA | |
| 00375 | 76 | 178 | RS#7 | CONFERENCE | 257 | BFDA | |
| 00375 | 77 | 179 | RS#7 | WAITING | 439 | BFDA | |
| 00375 | 78 | 181 | RS#7 | TOILET | 74 | BFDA | |
| 00375 | 79 | 182 | RS#7 | TOILET | 65 | BFDA | |
| 00375 | 80 | 184 | RS#7 | OFFICE | 208 | EBBA | |
| 00375 | 81 | 185 | RS#7 | OFFICE | 119 | EBAA | |
| 00375 | 82 | 186 | RS#7 | OFFICE | 144 | EBCA | |
| 00375 | 83 | 187 | RS#7 | WAITING | 211 | EBCA | |
| 00375 | 84 | 188 | RS#7 | TOILET | 71 | EBCA | |
| 00375 | 85 | 189 | RS#7 | JANITORS CLOSET | 15 | EFAA | |
| 00375 | 86 | 190 | RS#7 | TOILET | 66 | EBCA | |
| 00375 | 87 | 191 | RS#7 | OFFICE | 102 | EBCA | |
| 00375 | 88 | 192 | RS#7 | OFFICE | 102 | ELAA | |
| 00375 | 89 | 193 | RS#7 | OFFICE | 86 | EBCA | |
| 00375 | 90 | 194 | RS#7 | LOUNGE | 114 | EBCA | |
| 00375 | 91 | 195 | RS#7 | WAITING | 183 | EBCA | |
| 00375 | 92 | 196 | RS#7 | OFFICE | 97 | EBCA | |
| 00375 | 93 | 197 | RS#7 | OFFICE | 97 | EBCA | |
| 00375 | 94 | 198 | RS#7 | OFFICE | 96 | EBCA | |
| 00375 | 95 | 199 | RS#7 | ADMIN | 94 | EBCA | |
| 00375 | 96 | 200 | RS#7 | OFFICE | 96 | EBCA | |
| 00375 | 97 | 201 | RS#7 | CONFERENCE | 250 | EBCA | |
| 00375 | 98 | 202 | RS#7 | OFFICE | 95 | EBCA | |
| 00375 | 99 | 203 | RS#7 | STORAGE | 39 | EBCA | |
| 00375 | 100 | 204 | RS#7 | OFFICE | 134 | EBCA | |
| 00375 | 101 | 205 | RS#7 | OFFICE | 95 | EBCA | |
| 00375 | 102 | 206 | RS#7 | OFFICE | 95 | EBCA | |
| 00375 | 103 | 207 | RS#7 | OFFICE | 104 | EBCA | |
| 00375 | 104 | 208 | RS#7 | OFFICE | 114 | EBCA | |
| 00375 | 105 | 209 | RS#7 | OFFICE | 85 | BGAA | |
| 00375 | 106 | 210 | RS#7 | ADMIN | 85 | BGAA | |
| 00375 | 107 | 211 | RS#7 | OFFICE | 105 | BGAA | |
| 00375 | 108 | 212 | RS#7 | OFFICE | 128 | BJAA | |
| 00375 | 109 | 213 | RS#7 | TOILET | 64 | BGAA | |
| 00375 | 110 | 214 | RS#7 | JANITORS CLOSET | 14 | EFAA | |
| 00375 | 111 | 215 | RS#7 | TOILET | 61 | BGAA | |
| 00375 | 112 | 216 | RS#7 | OFFICE | 121 | BGAA | |
| 00375 | 113 | 217 | RS#7 | CONFERENCE | 410 | BGAA | |
| 00375 | 114 | 218 | RS#7 | STORAGE | 160 | BGAA | |
| 00375 | 115 | 219 | RS#7 | UTILITY, SOILED | 102 | BGAA | |
| 00375 | 116 | 220 | RS#7 | LOUNGE | 101 | BGAA | |
| 00375 | 117 | 221 | RS#7 | LOUNGE | 87 | BGAA | |
| 00375 | 118 | 222 | RS#7 | OFFICE | 115 | EBBA | |
| 00375 | 119 | 223 | RS#7 | TOILET | 54 | EBBA | |
| 00375 | 120 | 224 | RS#7 | TREATMENT ROOM | 170 | BDAA | |
| 00375 | 121 | 225 | RS#7 | TOILET | 54 | BDAA | |
| 00375 | 122 | 226 | RS#7 | OFFICE | 123 | BDAA | |
| 00375 | 123 | 227 | RS#7 | SCREENING | 85 | BDAA | |
| 00375 | 124 | 228 | RS#7 | OFFICE | 105 | BDAA | |
| 00375 | 125 | 229 | RS#7 | OFFICE | 101 | BDAA | |
| 00375 | 126 | 230 | RS#7 | OFFICE | 124 | BDAA | |
| 00375 | 127 | 231 | RS#7 | EXAM | 122 | BDAA | |
| 00375 | 128 | 232 | RS#7 | SCREENING | 102 | BDAA | |
| 00375 | 129 | 233 | RS#7 | STORAGE | 73 | FBIA | |
| 00375 | 130 | 234 | RS#7 | ADMIN | 127 | FBIA | |
| 00375 | 131 | 235 | RS#7 | OFFICE | 154 | BGAA | |
| 00375 | 132 | 236 | RS#7 | WAITING | 143 | FBIA | |
| 00375 | 133 | 237 | RS#7 | WAITING | 1379 | BGAA | |
| 00375 | 134 | 238 | RS#7 | ADMIN | 223 | BGAA | |
| 00375 | 135 | 239 | RS#7 | STORAGE | 272 | BGAA | |
| 00375 | 136 | 240 | RS#7 | PROCEDURE | 120 | FBIA | |
| 00375 | 137 | 241 | RS#7 | TOILET | 87 | BGAA | |
| 00375 | 138 | 242 | RS#7 | JANITORS CLOSET | 23 | EFAA | |
| 00375 | 139 | 243 | RS#7 | PROCEDURE | 116 | BDAA | |
| 00375 | 140 | 244 | RS#7 | EXAM | 124 | BDAA | |
| 00375 | 141 | 245 | RS#7 | EXAM | 119 | BDAA | |
| 00375 | 142 | 246 | RS#7 | EXAM | 125 | BGAA | |
| 00375 | 143 | 247 | RS#7 | OFFICE | 150 | BGAA | |
| 00375 | 144 | 248 | RS#7 | EXAM | 122 | BGAA | |
| 00375 | 145 | 249 | RS#7 | OFFICE | 122 | BGAA | |
| 00375 | 146 | 250 | RS#7 | OFFICE | 110 | BGAA | |
| 00375 | 147 | 251 | RS#7 | OFFICE | 92 | BGAA | |
| 00375 | 148 | 252 | RS#7 | OFFICE | 100 | BGAA | |
| 00375 | 149 | 253 | RS#7 | TOILET | 69 | BGAA | |
| 00375 | 150 | 254 | RS#7 | OFFICE | 99 | BGAA | |
| 00375 | 151 | 255 | RS#7 | OFFICE | 99 | BGAA | |
| 00375 | 152 | 256 | RS#7 | OFFICE | 97 | BGAA | |
| 00375 | 153 | 257 | RS#7 | OFFICE | 95 | BGAA | |
| 00375 | 154 | 258 | RS#7 | OFFICE | 100 | BGAA | |
| 00375 | 155 | 259 | RS#7 | OFFICE | 116 | BGAA | |
| 00375 | 156 | 260 | RS#7 | PROCEDURE | 115 | BGAA | |
| 00375 | 157 | 261 | RS#7 | EXAM | 116 | BGAA | |
| 00375 | 158 | 262 | RS#7 | EXAM | 117 | BGAA | |
| 00375 | 159 | 263 | RS#7 | EXAM | 115 | BGAA | |
| 00375 | 160 | 264 | RS#7 | OFFICE | 116 | BGAA | |
| 00375 | 161 | 265 | RS#7 | TREATMENT | 156 | BGAA | |
| 00375 | 162 | 266 | RS#7 | TOILET | 49 | BGAA | |
| 00375 | 163 | 267 | RS#7 | TREATMENT | 75 | BGAA | |
| 00375 | 164 | 268 | RS#7 | STORAGE | 68 | BGAA | |
| 00375 | 165 | 269 | RS#7 | ADMIN | 928 | ELAA | |
| 00375 | 166 | 270 | RS#7 | WAITING | 604 | BGAA | |
| 00375 | 167 | 271 | RS#7 | WAITING | 1367 | BJAA | |
| 00375 | 168 | 272 | RS#0 | STORAGE | 45 | BJAA | |
| 00375 | 169 | 273 | RS#0 | ADMIN | 128 | BJAA | |
| 00375 | 170 | 274 | RS#7 | WAITING | 144 | BJAA | |
| 00375 | 171 | 275 | RS#7 | RECEPTION | 237 | BJAA | |
| 00375 | 172 | 276 | RS#0 | OFFICE | 100 | BJAA | |
| 00375 | 173 | 277 | RS#7 | CONFERENCE | 260 | BGAA | |
| 00375 | 174 | 278 | RS#7 | OFFICE | 144 | EBCA | |
| 00375 | 175 | 279 | RS#7 | EXAM | 150 | BGAA | |
| 00375 | 176 | 280 | RS#7 | EXAM | 115 | BGAA | |
| 00375 | 177 | 281 | RS#7 | OFFICE | 113 | BGAA | |
| 00375 | 178 | 282 | RS#7 | EXAM | 118 | BGAA | |
| 00375 | 179 | 283 | RS#7 | EXAM | 110 | BJAA | |
| 00375 | 180 | 284 | RS#7 | OFFICE | 118 | BGAA | |
| 00375 | 181 | 285 | RS#0 | OFFICE | 111 | BJAA | |
| 00375 | 182 | 286 | RS#7 | OFFICE | 101 | BJAA | |
| 00375 | 183 | 287 | RS#7 | OFFICE | 99 | BJAA | |
| 00375 | 184 | 288 | RS#7 | STORAGE | 119 | BJAA | |
| 00375 | 185 | 289 | RS#7 | OFFICE | 139 | BJAA | |
| 00375 | 186 | 290 | RS#7 | EXAM | 122 | BJAA | |
| 00375 | 187 | 291 | RS#7 | EXAM | 124 | BJAA | |
| 00375 | 188 | 292 | RS#7 | EXAM | 121 | BJAA | |
| 00375 | 189 | 293 | RS#7 | EXAM | 122 | BJAA | |
| 00375 | 190 | 294 | RS#7 | OFFICE | 162 | BJAA | |
| 00375 | 191 | 295 | RS#7 | EXAM | 124 | BJAA | |
| 00375 | 192 | 296 | RS#7 | EXAM | 123 | BJAA | |
| 00375 | 193 | 297 | RS#7 | OFFICE | 163 | BJAA | |
| 00375 | 194 | 298 | RS#7 | OFFICE | 266 | BJAA | |
| 00375 | 195 | 299 | RS#7 | TOILET | 51 | BJAA | |
| 00375 | 196 | 300 | RS#7 | ADMIN | 308 | BJAA | |
| 00375 | 197 | 301 | RS#7 | SCREENING | 292 | BJAA | |
| 00375 | 198 | 302 | RS#7 | OFFICE | 162 | BJAA | |
| 00375 | 199 | 303 | RS#7 | STORAGE | 97 | BJAA | |
| 00375 | 200 | 304 | RS#7 | OFFICE | 148 | BJAA | |
| 00375 | 201 | 305 | RS#7 | JANITORS CLOSET | 26 | EFAA | |
| 00375 | 202 | 306 | RS#7 | STORAGE | 112 | FBEA | |
| 00375 | 203 | 307 | RS#7 | OFFICE | 101 | FBEA | |
| 00375 | 204 | 308 | RS#7 | WAITING | 134 | FBEA | |
| 00375 | 205 | 309 | RS#7 | CONFERENCE | 141 | FBEA | |
| 00375 | 206 | 310 | RS#7 | WAITING | 282 | FBEA | |
| 00375 | 207 | 311 | RS#7 | OFFICE | 92 | FBEA | |
| 00375 | 208 | 312 | RS#7 | OFFICE | 111 | FBEA | |
| 00375 | 209 | 313 | RS#7 | OFFICE | 105 | FBEA | |
| 00375 | 210 | 314 | RS#7 | OFFICE | 106 | FBEA | |
| 00375 | 211 | 316 | RS#7 | TOILET | 54 | FBEA | |
| 00375 | 212 | 317 | RS#0 | MECHANICAL | 1072 | EDAA | |
| 00375 | 213 | 318 | RS#7 | COMPUTER | 237 | EBJA | |
| 00375 | 214 | 319 | RS#7 | OFFICE | 213 | EDAA | |
| 00375 | 215 | 320 | RS#7 | COMPUTER | 97 | EBJA | |
| 00375 | 216 | 321 | RS#7 | WAITING | 140 | BHCA | |
| 00375 | 217 | 322 | RS#7 | ADMIN | 133 | BHCA | |
| 00375 | 218 | 323 | RS#7 | STORAGE | 10 | BHCA | |
| 00375 | 219 | 324 | RS#7 | PROCEDURE | 115 | BHCA | |
| 00375 | 220 | 325 | RS#7 | OFFICE | 101 | BHCA | |
| 00375 | 221 | 326 | RS#7 | EXAM | 183 | BHCA | |
| 00375 | 222 | 327 | RS#7 | OFFICE | 119 | BHCA | |
| 00375 | 223 | 328 | RS#7 | EXAM | 174 | BHCA | |
| 00375 | 224 | 329 | RS#7 | EXAM | 119 | BHCA | |
| 00375 | 225 | 330 | RS#7 | EXAM | 206 | BHCA | |
| 00375 | 226 | 331 | RS#7 | STORAGE | 97 | BHCA | |
| 00375 | 227 | 332 | RS#7 | VENDING | 97 | EDAA | |
| 00375 | 228 | 333 | RS#7 | COMPUTER | 382 | EBJA | |
| 00375 | 229 | 334 | RS#7 | STORAGE | 53 | EBJA | |
| 00375 | 230 | 335 | RS#7 | OFFICE | 107 | EBJA | |
| 00375 | 231 | 336 | RS#7 | COMPUTER | 165 | EBJA | |
| 00375 | 232 | 337 | RS#7 | COMPUTER | 220 | EBJA | |
| 00375 | 233 | 338 | RS#7 | OFFICE | 117 | EBJA | |
| 00375 | 234 | 339 | RS#7 | STORAGE | 73 | EBJA | |
| 00375 | 235 | 340 | RS#7 | OFFICE | 123 | EBJA | |
| 00375 | 236 | 341 | RS#7 | OFFICE | 101 | EBJA | |
| 00375 | 237 | 342 | RS#7 | OFFICE | 98 | EBJA | |
| 00375 | 238 | 343 | RS#7 | TOILET | 55 | EBJA | |
| 00375 | 239 | 344 | RS#7 | OFFICE | 158 | EBJA | |
| 00375 | 240 | 345 | RS#7 | STORAGE | 239 | EBJA | |
| 00375 | 241 | 346 | RS#7 | STORAGE | 23 | EBJA | |
| 00375 | 242 | 347 | RS#7 | STORAGE | 24 | GBAA | |
| 00375 | 243 | 348 | RS#7 | STORAGE | 63 | GBAA | |
| 00375 | 244 | 349 | RS#7 | ADMIN | 110 | GBAA | |
| 00375 | 245 | 350 | RS#7 | TOILET | 102 | GBAA | |
| 00375 | 246 | 351 | RS#7 | OFFICE | 301 | GBAA | |
| 00375 | 247 | 352 | RS#7 | OFFICE | 120 | GBAA | |
| 00375 | 248 | 353 | RS#7 | OFFICE | 122 | GBAA | |
| 00375 | 249 | 354 | RS#7 | OFFICE | 121 | GBAA | |
| 00375 | 250 | 355 | RS#7 | CONFERENCE | 715 | EDAA | |
| 00375 | 251 | 356 | RS#7 | OFFICE | 394 | EBAA | |
| 00375 | 252 | 357 | RS#7 | OFFICE | 231 | EBAA | |
| 00375 | 253 | 358 | RS#7 | TOILET | 42 | EBAA | |
| 00375 | 254 | 359 | RS#7 | STORAGE | 10 | EBAA | |
| 00375 | 255 | 360 | RS#7 | CONFERENCE | 286 | EBAA | |
| 00375 | 256 | 361 | RS#7 | STORAGE | 15 | EFAA | |
| 00375 | 257 | 362 | RS#7 | OFFICE | 156 | EBAA | |
| 00375 | 258 | 363 | RS#7 | TOILET | 51 | EBAA | |
| 00375 | 259 | 364 | RS#7 | OFFICE | 135 | EBAA | |
| 00375 | 260 | 365 | RS#7 | ADMIN | 432 | EBAA | |
| 00375 | 261 | 366 | RS#7 | OFFICE | 150 | EBAA | |
| 00375 | 262 | 367 | RS#7 | OFFICE | 456 | EBAA | |
| 00375 | 263 | 368 | RS#7 | OFFICE/ADS | 147 | EBAA | |
| 00375 | 264 | 369 | RS#7 | OFFICE | 141 | EBAA | |
| 00375 | 265 | 370 | RS#7 | OFFICE | 160 | EBAA | |
| 00375 | 266 | 371 | RS#7 | LOUNGE | 79 | EBAA | |
| 00375 | 267 | 372 | RS#7 | TOILET | 61 | EDAA | |
| 00375 | 268 | 373 | RS#7 | TOILET | 64 | EDAA | |
| 00375 | 269 | 374 | RS#7 | CONFERENCE | 758 | EDAA | |
| 00375 | 270 | 375 | RS#7 | STORAGE | 193 | EEAA | |
| 00375 | 271 | 376 | RS#0 | MECHANICAL | 391 | EDAA | |
| 00375 | 272 | 377 | RS#7 | TOILET | 120 | EDAA | |
| 00375 | 273 | 378 | RS#7 | TOILET | 124 | EDAA | |
| 00375 | 274 | 379 | RS#7 | OFFICE | 138 | FBBA | |
| 00375 | 275 | 380 | RS#7 | WAITING | 196 | FBBA | |
| 00375 | 276 | 381 | RS#7 | TOILET | 76 | FBBA | |
| 00375 | 277 | 382 | RS#7 | JANITORS CLOSET | 17 | EFAA | |
| 00375 | 278 | 384 | RS#7 | TOILET | 111 | FBBA | |
| 00375 | 279 | 385 | RS#7 | WORKBENCH/SHOP | 1489 | FBBA | |
| 00375 | 280 | 386 | RS#7 | OFFICE | 79 | EFAA | |
| 00375 | 281 | 387 | RS#7 | OFFICE | 121 | FBBA | |
| 00375 | 282 | 388 | RS#7 | STORAGE | 202 | FBBA | |
| 00375 | 283 | 389 | RS#7 | OFFICE | 62 | FBBA | |
| 00375 | 284 | 390 | RS#7 | STORAGE | 139 | FBBA | |
| 00375 | 285 | 391 | RS#0 | LOADING DOCK | 821 | EEAA | |
| 00375 | 286 | 392 | RS#0 | LINEN, SOILED | 42 | EFAA | |
| 00375 | 287 | 393 | RS#0 | STORAGE | 107 | EEAA | |
| 00375 | 288 | 394 | RS#0 | STORAGE | 126 | EEAA | |
| 00375 | 289 | 395 | RS#7 | OFFICE | 106 | EEAA | |
| 00375 | 290 | 396 | RS#7 | STORAGE | 347 | EBJA | |
| 00375 | 291 | 397 | RS#0 | STORAGE | 85 | EEAA | |
| 00375 | 292 | 398 | RS#7 | WORKBENCH/SHOP | 548 | EGAA | |
| 00375 | 293 | 399 | RS#7 | OFFICE | 131 | EGAA | |
| 00375 | 294 | 400 | RS#7 | OFFICE | 191 | EFAA | |
| 00375 | 295 | 401 | RS#7 | OFFICE | 281 | EDAA | |
| 00375 | 296 | 402 | RS#0 | STORAGE* | 1667 | EEAA | |
| 00375 | 297 | 403 | RS#0 | VAULT/SAFE | 57 | EEAA | |
| 00375 | 298 | 404 | RS#7 | TOILET* | 27 | EEAA | |
| 00375 | 299 | 405 | RS#7 | OFFICE | 479 | EEAA | |
| 00375 | 300 | 406 | RS#7 | OFFICE | 115 | EEAA | |
| 00375 | 301 | 407 | RS#7 | COMPUTER ROOM | 57 | EBJA | |
| 00375 | 302 | 408 | RS#0 | MECHANICAL | 376 | EDAA | |
| 00375 | 303 | 409 | RS#7 | TOILET | 57 | EDAA | |
| 00375 | 304 | 410 | RS#7 | TOILET | 58 | EDAA | |
| 00375 | 305 | 411 | RS#7 | WAITING | 397 | CAAA | |
| 00375 | 306 | 412 | RS#7 | ADMIN | 52 | CAAA | |
| 00375 | 307 | 413 | RS#7 | TOILET | 61 | CAAA | |
| 00375 | 308 | 415 | RS#7 | OFFICE | 134 | CAAA | |
| 00375 | 309 | 416 | RS#7 | TOILET | 30 | CAAA | |
| 00375 | 310 | 417 | RS#7 | TREATMENT | 117 | CAAA | |
| 00375 | 311 | 418 | RS#7 | OFFICE | 116 | CAAA | |
| 00375 | 312 | 419 | RS#7 | X-RAY | 148 | CAAA | |
| 00375 | 313 | 420 | RS#7 | TREATMENT | 116 | CAAA | |
| 00375 | 314 | 421 | RS#7 | TREATMENT | 117 | CAAA | |
| 00375 | 315 | 422 | RS#7 | TREATMENT | 115 | CAAA | |
| 00375 | 316 | 423 | RS#7 | JANITORS CLOSET | 27 | EFAA | |
| 00375 | 317 | 424 | RS#7 | TREATMENT | 115 | CAAA | |
| 00375 | 318 | 425 | RS#7 | TREATMENT | 115 | CAAA | |
| 00375 | 319 | 427 | RS#7 | X-RAY | 56 | CAAA | |
| 00375 | 320 | 428 | RS#7 | TREATMENT | 115 | CAAA | |
| 00375 | 321 | 429 | RS#7 | OFFICE | 117 | CAAA | |
| 00375 | 322 | 430 | RS#7 | TOILET | 49 | CAAA | |
| 00375 | 323 | 431 | RS#7 | DECONTAMINATION | 76 | CAAA | |
| 00375 | 324 | 432 | RS#7 | TREATMENT | 116 | CAAA | |
| 00375 | 325 | 433 | RS#7 | UTILITY, CLEAN | 116 | CAAA | |
| 00375 | 326 | 434 | RS#7 | LAB | 184 | CBAA | |
| 00375 | 327 | 435 | RS#7 | OFFICE | 95 | CBAA | |
| 00375 | 328 | 436 | RS#7 | LOUNGE | 238 | CAAA | |
| 00375 | 329 | 437 | RS#7 | STORAGE | 60 | CAAA | |
| 00375 | 330 | 438 | RS#7 | OFFICE | 240 | CAAA | |
| 00375 | 331 | 439 | RS#7 | LOCKERS | 51 | CAAA | |
| 00375 | 332 | 440 | RS#7 | TOILET | 53 | CAAA | |
| 00375 | 333 | 441 | RS#0 | STORAGE | 47 | CAAA | |
| 00375 | 334 | 442 | RS#7 | TOILET | 110 | CAAA | |
| 00375 | 335 | 443 | RS#7 | VESTIBULE | 189 | EDAA | |
| 00375 | 336 | 124-A | RS#7 | OFFICE | 120 | EDAA | |
| 00375 | 337 | 124-B | RS#7 | OFFICE | 85 | EDAA | |
| 00375 | 338 | 147-A | RS#0 | STORAGE | 16 | DBAA | |
| 00375 | 339 | C1A | RS#7 | CORRIDOR | 715 | EDAA | |
| 00375 | 340 | C1B | RS#7 | CORRIDOR | 767 | EDAA | |
| 00375 | 341 | C1C | RS#7 | CORRIDOR | 352 | EDAA | |
| 00375 | 342 | C1D | RS#7 | CORRIDOR | 1108 | EDAA | |
| 00375 | 343 | C1E | RS#7 | CORRIDOR | 438 | EDAA | |
| 00375 | 344 | C1F | RS#7 | CORRIDOR | 704 | EDAA | |
| 00375 | 345 | C1G | RS#7 | CORRIDOR | 740 | EDAA | |
| 00375 | 346 | C2A | RS#7 | CORRIDOR | 127 | ELAA | |
| 00375 | 347 | C2B | RS#7 | CORRIDOR | 151 | ELAA | |
| 00375 | 348 | C2C | RS#7 | CORRIDOR | 75 | DBAA | |
| 00375 | 349 | C3A | RS#7 | CORRIDOR | 790 | BJAA | |
| 00375 | 350 | C3B | RS#7 | CORRIDOR | 343 | BJAA | |
| 00375 | 351 | C3C | RS#7 | CORRIDOR | 269 | BJAA | |
| 00375 | 352 | C3D | RS#7 | CORRIDOR | 350 | BJAA | |
| 00375 | 353 | C3E | RS#7 | CORRIDOR | 283 | BGAA | |
| 00375 | 354 | C3F | RS#7 | CORRIDOR | 354 | BGAA | |
| 00375 | 355 | C3G | RS#7 | CORRIDOR | 262 | BGAA | |
| 00375 | 356 | C3J | RS#7 | CORRIDOR | 347 | BGAA | |
| 00375 | 357 | C3K | RS#7 | CORRIDOR | 297 | BDAA | |
| 00375 | 358 | C3L | RS#7 | CORRIDOR | 131 | BDAA | |
| 00375 | 359 | C4A | RS#7 | CORRIDOR | 91 | BJAA | |
| 00375 | 360 | C4B | RS#7 | CORRIDOR | 129 | FBEA | |
| 00375 | 361 | C4C | RS#7 | CORRIDOR | 132 | FBEA | |
| 00375 | 362 | C4D | RS#7 | CORRIDOR | 90 | FBEA | |
| 00375 | 363 | C4E | RS#7 | CORRIDOR | 189 | BGAA | |
| 00375 | 364 | C4F | RS#7 | CORRIDOR | 176 | BGAA | |
| 00375 | 365 | C4G | RS#7 | CORRIDOR | 519 | BGAA | |
| 00375 | 366 | C5A | RS#7 | CORRIDOR | 269 | BHCA | |
| 00375 | 367 | C5B | RS#7 | CORRIDOR | 794 | EBAA | |
| 00375 | 368 | C5C | RS#7 | CORRIDOR | 199 | EBJA | |
| 00375 | 369 | C5D | RS#7 | CORRIDOR | 216 | GBAA | |
| 00375 | 370 | C5E | RS#7 | CORRIDOR | 178 | EBJA | |
| 00375 | 371 | C5G | RS#7 | CORRIDOR | 381 | EDAA | |
| 00375 | 372 | C5J | RS#7 | CORRIDOR | 106 | EBCA | |
| 00375 | 373 | C5K | RS#7 | CORRIDOR | 175 | EBCA | |
| 00375 | 374 | C5L | RS#7 | CORRIDOR | 157 | EBCA | |
| 00375 | 375 | C5M | RS#7 | CORRIDOR | 146 | EBCA | |
| 00375 | 376 | C5N | RS#7 | CORRIDOR | 181 | EBCA | |
| 00375 | 377 | C5P | RS#7 | CORRIDOR | 292 | BFDA | |
| 00375 | 378 | C5Q | RS#7 | CORRIDOR | 94 | BFDA | |
| 00375 | 379 | C5R | RS#7 | CORRIDOR | 369 | EBAA | |
| 00375 | 380 | C6A | RS#7 | CORRIDOR | 84 | FBBA | |
| 00375 | 381 | C6B | RS#7 | CORRIDOR | 91 | FBBA | |
| 00375 | 382 | C6C | RS#7 | CORRIDOR | 286 | EDAA | |
| 00375 | 383 | C6D | RS#7 | CORRIDOR | 315 | CAAA | |
| 00375 | 384 | C6F | RS#7 | CORRIDOR | 321 | CAAA | |
| 00375 | 385 | C6G | RS#7 | CORRIDOR | 294 | CAAA |