Site Visit Questions & Responses 20 June 2018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_01_-_XQPZ160154_SOW_6-20-18_Rev1.pdf | ||
| FA700018R00170001.pdf | ||
| Attendance_11Jun18_Fairchild_Hall.pdf | ||
| Site_Visit_Slides_-_AHUs_Fairchild_Hall.pdf | ||
| Site_Visit_Minutes_-_11_Jun_18_-_AHUs_E_Fairchild_Hall.pdf | ||
| XQPZ160154_Drawings_-_Sealed.pdf | ||
| Attch_02_-_XQPZ160154_Drawings_-_sealed.pdf | ||
| Attch_03_-_XQPZ160154_Specifications.pdf | ||
| Attch_01_-_XQPZ160154_SOW_5-29-18.pdf | ||
| Attch_08_Financial_Reference.doc | DOC document | |
| XQPZ160154_Sole_Source_Siemens_Redacted.pdf | ||
| Attch_05_-_XQPZ160154_HAZMAT_Report.pdf | ||
| Attch_06_-_WD_CO180032_Building.pdf | ||
| Attch_04_-_USAFA_Environmental_Standards_2017_Final.pdf | ||
| FA700018R0017.pdf | ||
| Attch_07_-_Experience_Form.docx | DOCX document | |
| XQPZ160154_Sole_Source_Notifier_Redacted.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA7000-18-R-0017 Sustain/Repair AHUs E Fairchild Hall
Site Visit Questions & Responses:
1. Please indicate on the mechanical schedules what equipment requires new VFD’s.
Response: Refer to SOW item 4.M.1.
2. How many new chilled water pumps/VFD’s are required?
Response: Refer to SOW item 4.M.1.
3. Can you verify the flow meter shown on M-715, Mech Room 1B43 Heat Pump Water System cartoon is existing?
Response: Refer to SOW item 4.M.2.
4. Can you verify which EF’s shown on M-703 have existing vs. new VFDs. Shows E-27 to remain(is that the VFD), but are the others going to get relocated or new VFDs?
Response: Refer to SOW item 4.M.1.
5. Can you verify which EF’s shown on M-701 have existing vs. new VFDs.
Response: Refer to SOW item 4.M.1.
6. Is all existing wire to be removed and replaced with new wire on all equipment labeled (ETR)? Please clarify Demolition/New Work Abbreviations #1 depicted on drawing sheets ED101, ED102, ED103, E101, E102, E103, EL101, EL102, & EL103.
Response: Refer to SOW item 4.M.3.
7. Project specifications dated 8 March 2017, section 23 01 30.41; speaks generally about duct cleaning. At the site visit it was asked if all ducts touched by these AHU’s is to be cleaned and the response was no, only in the mechanical rooms. Please confirm this is correct.
Response: Refer to SOW item 4.M.4.
8. Project specifications dated 8 March 2017, section 23 31 13 2.2, lists two metal ductwork manufacturers approved for the project. Can alternate manufacturers be used if they comply with the project specifications?
Response: Refer to SOW item 4.M.5.
9. Project specifications dated 8 March 2017, section 23 34 13 2.1.B states new axial fans are to be factory tested. Please identify the requirements of this factory test.
Response: Refer to SOW item 4.M.6.
10. Project specifications dated 8 March 2017, section 23 34 16 2.1.B states new centrifugal fans are to be factory tested. Please identify the requirements of this factory test.
Response: Refer to SOW item 4.M.7.
11. Project specifications dated 8 March 2017, section 23 73 13 1.2.D calls for a factory functional performance test for new air handling units. Please identify the requirements of this factory test.
Response: Refer to SOW item 4.M.8.
12. Project specifications dated 8 March 2017, section 23 73 13 1.2.E describes factory disassembly of new air handling units at a module level prior to shipment. Typical new equipment shipping “splits” may not be available at individual module level. Please confirm this requirement.
Response: Refer to SOW item 4.M.9.
13. Project specifications dated 8 March 2017, section 23 73 13 1.3.C requires the contractor project manager to observe “factory” testing of the new air handling units and work with production staff to disassemble the new equipment prior to shipment. This may not be available. Please confirm this requirement.
Response: Refer to SOW item 4.M.10.
14. Project specifications dated 8 March 2017, section 23 73 13 1.6.D.9 calls for detailed product data and “all data necessary to evaluate the product for compliance with the specification and mechanical drawings.” The contractor cannot quantify this item and will provide standard information and product data. Please confirm standard data is acceptable.
Response: Refer to SOW item 4.M.11.
15. Drawings H-101, H-102 and H-103 have notes in several places stating ‘stairs and landing to be removed and replaced. Refer to architectural and structural plans’. There are no architectural or structural plans included in the plans. Please provide details.
Response: Refer to SOW item 4.M.12.
16. Project drawings M401, keynote 4 calls for new OSA plenums to have perforated protection on the liner. This note is not shown at AHU6.
Response: Refer to SOW item 4.M.13.
17. Is there a mechanical insulation schedule for spec section 23 07 00 3.2.A?
Response: Refer to SOW item 4.M.14.
18. Should a water softener be provided for humidifiers H30 & H31?
Response: Refer to SOW item 4.M.15.