1651_-_RFI_No._4_-_Lighting__Electrical.pdf

PDF 168 KB Posted

Attached to
B1651 Renovate Building Federal contract opportunity
Solicitation number
FA6675-15-R-0004
Issued by
Department of the Air Force Reserve Command

About this file

RFI 4

View the file

Other files for this federal contract opportunity

Other files attached to B1651 Renovate Building, newest first.
File Type Posted
1651_-_RFI_No._4_-_Lighting_ _Electrical.pdf PDF
1651_-_Design_RFI.pdf PDF
FA6675-15-R-0004-0003.doc DOC document
RFI_-RFC_FORM_20150420_0004.pdf PDF
RFI's_1 2 3_FA6675-15-R-0004-signed.pdf PDF
FA6675-15-R-0004-0002.pdf PDF
FA6675-15-R-0004-00001.pdf PDF
Binder1_Specifications_Div_001_DDPM_14-0002.pdf PDF
2015-03-11_FINAL_DRAWINGS.pdf PDF
2015.03.13_Final_Specifications.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
DBA_WD_TX150322_20150306_TX322.pdf PDF
FA6675-15-R-0004_B1651_Renovate_Building.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO:

RFI NO: 0004 DATE (YYYYMMDD)

20150814

SUBJECT:

Solicitation FA6675-15-R-0004

DRAWING REFERENCE/ DETAIL:

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:

REQUEST:

Please verify that the existing light fixtures can be used as temporary lighting during construction.

Please verify that all light fixtures and lamps that are removed shall be returned to base for disposal.

Receptacles that are to be removed and replaced in existing locations. Are only the devices R & R or does the wire have to be replaced also?

PROPOSED SOLUTION (If applicable:

TO(Contracting Officer): 301 CONF/LGC

FROM (Contractor):

Tyson Building Co.

DATE (YYYYMMDD)

20150814

TYPE OR PRINT NAME AND TITLE

Dan Covington

SIGNATURE:

signed

FOR GOVERNMENT USE ONLY

FROM CONTRACTING

TO:(Base Civil Engineering): Charles Tehan (__) Robert Dudley(__)

REQUEST FOR INFORMATION / CLARIFICATION FORM

For Evaluation and Action

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

RFI RESPONSE / CLARIFICATION:-

Government to complete following sections:

TO:(AF Contractiing Office)

TO:(Contractor)

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate

A change order will be required? YES NO

There will be an increase in the cost of the project? YES NO

Reviewer:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.

1101986434C Typewritten Text

1. The existing light fixtures can

1101986434C Typewritten Text

1101986434C Typewritten Text be used as temporary lighting during construction.

1101986434C Typewritten Text

1101986434C Typewritten Text

1101986434C Typewritten Text

2. All T-8 lamps shall be turned over to the Contracting Officer Representative (COR) for proper Hazardous Waste disposal. It shall be the Contractor's responsibility to properly dispose of all demolished T-8 light fixtures.

3. All receptacles and wiring shall be removed and replaced throughout Building 1651.

1101986434C Typewritten Text 20150814

1101986434C Typewritten Text Charles D. Tehan, GS-11, Eng Technician

1376454971C Typewritten Text 20150814

1376454971C Typewritten Text Yvette Todtenhoefer, Contracting Officer

2015-08-14T13:16:30-0500
TEHAN.CHARLES.D.1101986434
2015-08-14T16:14:11-0500
TODTENHOEFER.YVETTE.1376454971

File details come from the government source that posted it. Updated .