1651_-_Design_RFI.pdf
PDF 16 KB Posted
- Attached to
- B1651 Renovate Building Federal contract opportunity
- Solicitation number
- FA6675-15-R-0004
About this file
Clarification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1651_-_RFI_No._4_-_Lighting__Electrical.pdf | ||
| 1651_-_RFI_No._4_-_Lighting_ _Electrical.pdf | ||
| RFI_-RFC_FORM_20150420_0004.pdf | ||
| FA6675-15-R-0004-0003.doc | DOC document | |
| RFI's_1 2 3_FA6675-15-R-0004-signed.pdf | ||
| FA6675-15-R-0004-0002.pdf | ||
| FA6675-15-R-0004-00001.pdf | ||
| Binder1_Specifications_Div_001_DDPM_14-0002.pdf | ||
| 2015.03.13_Final_Specifications.pdf | ||
| 2015-03-11_FINAL_DRAWINGS.pdf | ||
| RFI_-RFC_FORM_20150420.doc | DOC document | |
| FA6675-15-R-0004_B1651_Renovate_Building.pdf | ||
| DBA_WD_TX150322_20150306_TX322.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
RFI NO.:
PROJECT NAME: Renovation of B1651 CONTRACTOR NAME: Gulf Coast Architecture PROJECT NO: DDPM 140002 E-MAIL ADDRESS: charles.tehan@us.af.mil SUBJECT: Mechanical Piping DRAWING REFERENCE/ DETAIL: M-300 & M-402
RFI REQUEST: From 2nd Contractor Site Visit
Will the refrigerant lines be piped underground or over the sidewalk from the main heat pumps located inside of the brick mechanical equipment enclosure?
ISSUED BY: Charles D. Tehan (Base CE) DATE ISSUED: 12 Aug 2015 RESPONSE NEEDED BY: 21 Aug 2015
(__)ATTACHMENT SENT UNDER SEPARATE COVER
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
The refrigerant lines running from the main heat pumps located within the brick mechanical equipment enclosure to B1651 shall be run underground to Room 106 through a 6” diameter schedule 40 PVC pipe. Reference drawings M-300 & M-402 for addition information
ISSUED BY:
Charles D. Tehan, GS-11, Engineering Technician
DATE ISSUED:
12 Aug 2015
(__)ATTACHMENT SENT UNDER SEPARATE COVER
The above response clarifies and interprets the Contract Documents and may include minor changes in the work.