1651_-_RFI_No._4_-_Lighting_ _Electrical.pdf
PDF 139 KB Posted
- Attached to
- B1651 Renovate Building Federal contract opportunity
- Solicitation number
- FA6675-15-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1651_-_RFI_No._4_-_Lighting__Electrical.pdf | ||
| 1651_-_Design_RFI.pdf | ||
| FA6675-15-R-0004-0003.doc | DOC document | |
| RFI_-RFC_FORM_20150420_0004.pdf | ||
| RFI's_1 2 3_FA6675-15-R-0004-signed.pdf | ||
| FA6675-15-R-0004-0002.pdf | ||
| FA6675-15-R-0004-00001.pdf | ||
| Binder1_Specifications_Div_001_DDPM_14-0002.pdf | ||
| 2015-03-11_FINAL_DRAWINGS.pdf | ||
| 2015.03.13_Final_Specifications.pdf | ||
| RFI_-RFC_FORM_20150420.doc | DOC document | |
| DBA_WD_TX150322_20150306_TX322.pdf | ||
| FA6675-15-R-0004_B1651_Renovate_Building.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO:
RFI NO: 0004 DATE (YYYYMMDD)
20150814
SUBJECT:
Solicitation FA6675-15-R-0004
DRAWING REFERENCE/ DETAIL:
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:
REQUEST:
Please verify that the existing light fixtures can be used as temporary lighting during construction.
Please verify that all light fixtures and lamps that are removed shall be returned to base for disposal.
Receptacles that are to be removed and replaced in existing locations. Are only the devices R & R or does the wire have to be replaced also?
PROPOSED SOLUTION (If applicable:
TO(Contracting Officer): 301 CONF/LGC
FROM (Contractor):
Tyson Building Co.
DATE (YYYYMMDD)
20150814
TYPE OR PRINT NAME AND TITLE
Dan Covington
SIGNATURE:
signed
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:(Base Civil Engineering): Charles Tehan (__) Robert Dudley(__)
REQUEST FOR INFORMATION / CLARIFICATION FORM
For Evaluation and Action
DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contractiing Office)
TO:(Contractor)
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate
A change order will be required? YES NO
There will be an increase in the cost of the project? YES NO
Reviewer:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
1101986434C Typewritten Text
1. The existing light fixtures can
1101986434C Typewritten Text
1101986434C Typewritten Text be used as temporary lighting during construction.
1101986434C Typewritten Text
1101986434C Typewritten Text
1101986434C Typewritten Text
2. All T-8 lamps shall be turned over to the Contracting Officer Representative (COR) for proper Hazardous Waste disposal. It shall be the Contractor's responsibility to properly dispose of all demolished T-8 light fixtures.
3. All receptacles and wiring shall be removed and replaced throughout Building 1651.
1101986434C Typewritten Text 20150814
1101986434C Typewritten Text Charles D. Tehan, GS-11, Eng Technician
| 2015-08-14T13:16:30-0500 | |
| TEHAN.CHARLES.D.1101986434 |