REVITALIZE WATER DISTRIBUTION SYSTEM 94-0466
SECTION 02510A Page 1
SECTION 02510A
WATER DISTRIBUTION SYSTEM
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM B 88 Seamless Copper Water Tube
ASTM D 1784 Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds
ASTM D 1785 Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120
ASTM D 2464 Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D 2466 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule
ASTM D 2467 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule
ASTM D 2564 Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic
Piping Systems
ASTM D 2657 Heat Fusion Joining Polyolefin Pipe and Fittings
ASTM D 2774 Underground Installation of Thermoplastic Pressure Piping
ASTM D 3839 Underground Installation of "Fiberglass" (Glass-Fiber- Reinforced Thermosetting Resin) Pipe
ASTM D 4161 "Fiberglass"(Glass-Fiber-Reinforced Thermosetting Resin)
Pipe Joints Using Elastomeric Seals
ASTM F 477 Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASME INTERNATIONAL (ASME)
ASME B16.1 Cast Iron Pipe Flanges and Flanged Fittings
ASME B16.26 Cast Copper Alloy Fittings for Flared Copper Tubes
SECTION 02510A Page 2
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA B301 Liquid Chlorine
AWWA C104 Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110 Ductile-Iron and Gray-Iron Fittings, 3 In. Through 48 In. for
Water and Other Liquids
AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C153 Ductile-Iron Compact Fittings, 3 In. Through 24 In. and 54 In.
through 64 In. for Water Service
AWWA C200 Steel Water Pipe - 6 In. and Larger
AWWA C301 Prestressed Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids
AWWA C502 Dry-Barrel Fire Hydrants
AWWA C504 Rubber-Seated Butterfly Valves
AWWA C509 Resilient-Seated Gate Valves for Water Supply Service
AWWA C600 (1993) Installation of Ductile-Iron Water Mains and Their
Appurtenances
AWWA C606 (1997) Grooved and Shouldered Joints
AWWA C651 (1992) Disinfecting Water Mains
AWWA C800 (1989) Underground Service Line Valves and Fittings
AWWA C900 (1997; C900a) Polyvinyl Chloride (PVC) Pressure Pipe, 4 In.
Through 12 In., for Water Distribution
AWWA C901 (1996) Polyethylene (PE) Pressure Pipe and Tubing, 1/2 In.
Through 3 In., for Water Service
AWWA C905 (1997) Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14 In. Through 36 In.
AWWA M23 (1980) Manual: PVC Pipe - Design and Installation
DUCTILE IRON PIPE RESEARCH ASSOCIATION (DIPRA)
DIPRA TRD (1997) Thrust Restraint Design for Ductile Iron Pipe
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-80 (1997) Bronze Gate, Globe, Angle and Check Valves
SECTION 02510A Page 3
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 24 (1995) Installation of Private Fire Service Mains and Their
Appurtenances
NFPA 49 (1994) Hazardous Chemicals Data
NFPA 325-1 (1994) Fire Hazard Properties of Flammable Liquids, Gases, and Volatile Solids
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Paint 21 (1991) White or Colored Silicone Alkyd Paint
SSPC Paint 25 (1991) Red Iron Oxide, Zinc Oxide, Raw Linseed Oil and
Alkyd Primer (Without Lead and Chromate Pigments)
1.2 PIPING
This section covers water supply distribution service lines, and connections to building service at a point approximately 5 feet outside buildings and structures to which service is required. The Contractor shall have a copy of the manufacturer's recommendations for each material or procedure to be utilized available at the construction site at all times.
1.2.1 Service Lines
Piping for water service lines less than 3 inches in diameter shall be galvanized steel, polyvinyl chloride (PVC) plastic, Oriented PVC plastic polyethylene, or copper tubing, unless otherwise shown or specified. Piping for water service lines 3 inches and larger shall be ductile iron, polyvinyl chloride (PVC) plastic, filament-wound or centrifugally cast reinforced thermosetting resin, reinforced plastic mortar pressure pipe or steel, unless otherwise shown or specified.
1.2.2 Distribution Lines (3 Inches) or Larger
Piping for water distribution lines 3 inches or larger shall be ductile iron, polyvinyl chloride (PVC) through 36 inch nominal diameter plastic, or reinforced concrete, unless otherwise shown or specified.
1.2.3 Supply Lines (3 Inches) or Larger
Piping for water supply lines 3 inches or larger shall be ductile iron, polyvinyl chloride (PVC) plastic reinforced concrete, unless otherwise shown or specified.
1.2.4 Sprinkler Supply Lines
Piping for water lines supplying sprinkler systems for building fire protection shall conform to NFPA 24 from the point of connection with the water distribution system to the building 5 foot line.
1.2.5 Excavation, Trenching, and Backfilling
Excavation, trenching, and backfilling shall be in accordance with the applicable provisions of Section 02316 EXCAVATION, TRENCHING, AND BACKFILLING FOR UTILITIES, except as modified herein.
SECTION 02510A Page 4
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Installation; G
The manufacturer's recommendations for each material or procedure to be utilized.
Waste Water Disposal Method; G.
The method proposed for disposal of waste water from hydrostatic tests and disinfection, prior to performing hydrostatic tests.
SD-06 Test Reports
Bacteriological Disinfection; G
Test results from commercial laboratory verifying disinfection.
Satisfactory Installation; G
A statement signed by the principal officer of the contracting firm stating that the installation is satisfactory and in accordance with the contract drawings and specifications, and the manufacturer’s prescribed procedures and techniques, upon completion of the project and before final acceptance.
1.4 HANDLING
Pipe and accessories shall be handled to ensure delivery to the trench in sound, undamaged condition, including no injury to the pipe coating or lining. If the coating or lining of any pipe or fitting is damaged, the repair shall be made by the Contractor in a satisfactory manner, at no additional cost to the Government. No other pipe or material shall be placed inside a pipe or fitting after the coating has been applied. Pipe shall be carried into position and not dragged. Use of pinch bars and tongs for aligning or turning pipe will be permitted only on the bare ends of the pipe. The interior of pipe and accessories shall be thoroughly cleaned of foreign matter before being lowered into the trench and shall be kept clean during laying operations by plugging or other approved method. Before installation, the pipe shall be inspected for defects. Material found to be defective before or after laying shall be replaced with sound material without additional expense to the Government. Rubber gaskets that are not to be installed immediately shall be stored in a cool and dark place.
1.4.1 Coated and Wrapped Steel Pipe
Coated and wrapped steel pipe shall be handled in conformance with AWWA C203.
1.4.2 Polyethylene (PE) Pipe Fittings and Accessories
PE pipe, fittings, and accessories shall be handled in conformance with AWWA C901.
SECTION 02510A Page 5
1.4.3 Plastic Pipe and Fittings
Polyvinyl Chloride (PVC), pipe and fittings shall be handled and stored in accordance with the manufacturer's recommendations. Storage facilities shall be classified and marked in accordance with NFPA 704, with classification as indicated in NFPA 49 and NFPA 325-1.
PART 2 PRODUCTS
2.1 PIPE
Pipe shall conform to the respective specifications and other requirements specified below.
2.1.1 Reinforced and Prestressed Concrete Pipe
Steel cylinder reinforced concrete pipe shall conform to AWWA C300, AWWA C301, or AWWA C303 and shall be designed to withstand a working pressure of not less than 150 psi unless otherwise shown or specified.
2.1.2 Plastic Pipe
2.1.2.1 PE Plastic Pipe
Pipe, tubing, and heat-fusion fittings shall conform to AWWA C901.
2.1.2.2 PVC Plastic Pipe
Pipe, couplings and fittings shall be manufactured of material conforming to ASTM D 1784, Class 12454B.
a. Pipe Less Than 4 inch Diameter:
(1) Elastomeric-Gasket Joint: Pipe shall conform to dimensional requirements of ASTM D
1785 Schedule 40, with joints meeting the requirements of 150 psi working pressure, 200 psi hydrostatic test pressure, unless otherwise shown or specified.
b. Pipe 4 through 12 inch Diameter: Pipe, couplings and fittings shall conform to AWWA C900, Class 150, CIOD pipe dimensions, elastomeric-gasket joint, unless otherwise shown or specified.
c. Pipe 14 through 36 inch Diameter: Pipe shall conform to AWWA C905 unless otherwise shown or specified.
2.1.2.3 Ductile-Iron Pipe
Ductile-iron pipe shall conform to AWWA C151, working pressure not less than 150 psi, unless otherwise shown or specified. Pipe shall be cement-mortar lined in accordance with AWWA C104.
Linings shall be standard. When installed underground, pipe shall be coated in accordance with Section 13110 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE). Flanged ductile iron pipe with threaded flanges shall be in accordance with AWWA C115.
2.1.2.4 Steel Pipe
2.1.2.5 Galvanized Steel Pipe
Galvanized steel pipe shall conform to ASTM A 53, standard weight.
SECTION 02510A Page 6
2.1.2.6 Protective Materials for Steel Pipe
Protective materials for steel pipe, except as otherwise specified, shall be mechanically applied in a factory or plant especially equipped for the purpose. The materials shall, unless otherwise indicated on the drawings, consist of the following for the indicated pipe material and size:
a. Pipe and fittings less than 3 inches in diameter shall be thoroughly cleaned of foreign material by wire brushing and solvent cleaning, and then given 1 coat of coal-tar primer and 2 coats of coal-tar enamel conforming to AWWA C203; threaded ends of pipe and fittings shall be adequately protected prior to coating.
2.1.2.7 Copper Tubing
Copper tubing shall conform to ASTM B 88, Type K, annealed.
2.2 FITTINGS AND SPECIALS
2.2.2 PVC Pipe System
a. For pipe less than 4 inch diameter, fittings for threaded pipe shall conform to requirements of ASTM D 2464, threaded to conform to the requirements of ASME B1.20.1 for use with Schedule 80 pipe and fittings; fittings for solvent cement jointing shall conform to ASTM D 2466 or ASTM D 2467; and fittings for elastomeric-gasket joint pipe shall be iron conforming to AWWA C110 or AWWA C111. Iron fittings and specials shall be cement-mortar lined (standard thickness) in accordance with AWWA C104.
b. For pipe 4 inch diameter and larger, fittings and specials shall be iron, bell end in accordance with AWWA C110, 150 psi pressure rating unless otherwise shown or specified, except that profile of bell may have special dimensions as required by the pipe manufacturer; or fittings and specials may be of the same material as the pipe with elastomeric gaskets, all in conformance with AWWA C900. Iron fittings and specials shall be cement-mortar lined (standard thickness) in accordance with AWWA C104. Fittings shall be bell and spigot or plain end pipe, or as applicable. Ductile iron compact fittings shall be in accordance with
AWWA C153.
2.2.3 Ductile-Iron Pipe System
Fittings and specials shall be suitable for 150 psi pressure rating, unless otherwise specified. Fittings and specials for mechanical joint pipe shall conform to AWWA C110. Fittings and specials for use with push-on joint pipe shall conform to AWWA C110 and AWWA C111. Fittings and specials for grooved and shouldered end pipe shall conform to AWWA C606. Fittings and specials shall be cement-mortar lined (standard thickness) in accordance with AWWA C104. Ductile iron compact fittings shall conform to AWWA C153.
2.2.4 Steel Pipe System
2.2.4.1 Galvanized Steel Piping
Steel fittings shall be galvanized. Screwed fittings shall conform to ASME B16.3. Flanged fittings shall conform to AWWA C207.
SECTION 02510A Page 7
2.2.4.2 Dielectric Fittings
Dielectric fittings shall be installed between threaded ferrous and nonferrous metallic pipe, fittings and valves, except where corporation stops join mains. Dielectric fittings shall prevent metal-to-metal contact of dissimilar metallic piping elements and shall be suitable for the required working pressure.
2.2.4.3 Copper Tubing System
Fittings and specials shall be flared and conform to ASME B16.26.
2.3 JOINTS
2.3.1 Gaskets for Reinforced Concrete Pipe
Rubber-gasket joints shall be of the type using a bell-and-spigot joint design of steel. The gaskets shall conform to AWWA C300, AWWA C301, or AWWA C303, as applicable.
2.3.2 Plastic Pipe Jointing
2.3.2.2 PVC Pipe
Joints, fittings, and couplings shall be as specified for PVC pipe. Joints connecting pipe of differing materials shall be made in accordance with the manufacturer's recommendations, and as approved by the Base Civil Engineeer.
2.3.3 Ductile-Iron Pipe Jointing
a. Mechanical joints shall be of the stuffing box type and shall conform to AWWA C111.
b. Rubber gaskets and lubricants shall conform to the applicable requirements of AWWA C111.
2.3.3.1 Mechanical Couplings
Mechanical couplings for steel pipe shall be the sleeve type, or when approved, the split-sleeve type and shall provide a tight flexible joint under all reasonable conditions, such as pipe movements caused by expansion, contraction, slight setting or shifting in the ground, minor variations in trench gradients, and traffic vibrations. Couplings shall be of strength not less than the adjoining pipeline.
2.3.3.2 Copper Tubing Jointing
Joints shall be compression-pattern flared and shall be made with the specified fittings.
2.4 VALVES
2.4.1 Bolts
All bolts supplied with valves for use on this Project shall be stainless steel.
2.4.2 Gate Valves
Gate valves shall be designed for a working pressure of not less than 150 psi. Valve connections shall be as required for the piping in which they are installed. Valves shall have a clear waterway equal to the full nominal diameter of the valve, and shall be opened by turning counterclockwise. The operating nut or wheel shall have an arrow, cast in the metal, indicating the direction of opening.
SECTION 02510A Page 8
a. Valves smaller than 3 inches shall be all bronze and shall conform to MSS SP-80, Type 1, Class 150.
b. Resilient-Seated Gate Valves: For valves 3 to 12 inches in size, resilient-seated gate valves shall conform to AWWA C509.
2.4.3 Rubber-Seated Butterfly Valves
Rubber-seated butterfly valves shall conform to the performance requirements of AWWA C504. Wafer type valves conforming to the performance requirements of AWWA C504 in all respects, but not meeting laying length requirements will be acceptable if supplied and installed with a spacer providing the specified laying length. All tests required by AWWA C504 shall be met. Flanged-end valves shall be installed in an approved pit and provided with a union or sleeve-type coupling in the pit to permit removal. Mechanical-end valves 3 through 10 inches in diameter may be direct burial if provided with a suitable valve box, means for manual operation, and an adjacent pipe joint to facilitate valve removal.
Valve operators shall restrict closing to a rate requiring approximately 60 seconds, from fully open to fully closed.
2.4.4 Pressure Reducing Valves
Pressure reducing valves shall maintain a constant downstream pressure regardless of fluctuations in demand. Valves shall be suitable for 250 psi operating pressure on the inlet side, with outlet pressure set for 60 psi. The valves shall be of the hydraulically-operated, pilot controlled, globe or angle type, and may be actuated either by diaphragm or piston. The pilot control shall be the diaphragm-operated, adjustable, spring-loaded type, designed to permit flow when controlling pressure exceeds the spring setting. Ends shall be threaded. Valve bodies shall be bronze, cast iron or cast steel with bronze trim.
Valve stem shall be stainless steel. Valve discs and diaphragms shall be synthetic rubber. Valve seats shall be bronze. Pilot controls shall be bronze with stainless steel working parts.
2.4.5 Vacuum and Air Relief Valves
Vacuum and air relief valves shall be of the size shown and shall be of a type that will release air and prevent the formation of a vacuum. The valves shall automatically release air when the lines are being filled with water and shall admit air into the line when water is being withdrawn in excess of the inflow.
Valves shall be iron body with bronze trim and stainless steel float.
2.4.6 Indicator Post for Valves
Each valve shown on the drawings with the designation "P.I.V." shall be equipped with indicator post conforming to the requirements of NFPA 24. Operation shall be by a wrench which shall be attached to each post.
2.5 VALVE BOXES
Valve boxes shall be cast iron or concrete, except that concrete boxes may be installed only in locations not subjected to vehicular traffic. Cast-iron boxes shall be extension type with slide-type adjustment and with flared base. The minimum thickness of metal shall be 3/16 inch. Concrete boxes shall be the standard product of a manufacturer of precast concrete equipment. The word "WATER" shall be cast in the cover. The box length shall adapt, without full extension, to the depth of cover required over the pipe at the valve location.
SECTION 02510A Page 9
2.5 FIRE HYDRANTS
2.5.1 Construction
Hydrants shall be dry-barrel type conforming to AWWA C502 with valve opening at least 5 inches in diameter and designed so that the flange at the main valve seat can be removed with the main valve seat apparatus remaining intact, closed and reasonably tight against leakage and with a breakable valve rod coupling and breakable flange connections located no more than 8 inches above the ground grade. Hydrants shall have a 6 inch bell connection, two 2-1/2 inch hose connections and one 4-1/2 inch pumper connection. Outlets shall have American National Standard fire-hose coupling threads.
Working parts shall be bronze. Design, material, and workmanship shall be equal to the latest stock pattern ordinarily produced by the manufacturer. Hydrants shall be painted with 1 coat of red iron oxide, zinc oxide primer conforming to SSPC Paint 25 and 2 finish coats of silicone alkyd paint conforming to SSPC Paint 21,of the installation's standard colors or as directed by the Base Civil Engineer. Suitable bronze adapter for each outlet, with caps, shall be furnished.
2.5.2 Operation
Hydrant shall be equipped with a five (5) sided, 1 ½” operating stem nut. Hydrant shall open counterclockwise and include an arrow cast on the bonnet indicating opening direction.
2.6 MANUFACTURERS
Hydrants shall be manufactured by:
a. Mueller Inc.
b. Kennedy Valve
c. Clow Mfg.
2.7 MISCELLANEOUS ITEMS
2.8.1 Service Clamps
Service clamps shall have a pressure rating not less than that of the pipe to be connected and shall be either the single or double flattened strap type. Clamps shall have a galvanized malleable-iron body with cadmium plated straps and nuts. Clamps shall have a rubber gasket cemented to the body.
2.8.2 Corporation Stops
Corporation stops shall have standard corporation stop thread conforming to AWWA C800 on the inlet end, with flanged joints, compression pattern flared tube couplings, or wiped joints for connections to goosenecks.
2.8.3 Goosenecks
Copper tubing for gooseneck connections shall conform to the applicable requirements of ASTM B 88, Type K, annealed. Length of cable requirement connections shall be in accordance with standard practice.
2.8.4 Service Stops
Service stops shall be water-works inverted-ground-key type, oval or round flow way, tee handle, without drain. Pipe connections shall be suitable for the type of service pipe used. All parts shall be of
SECTION 02510A Page 10 bronze with female iron-pipe-size connections or compression-pattern flared tube couplings, and shall be designed for a hydrostatic test pressure not less than 200 psi.
2.8.5 Tapping Sleeves
Tapping sleeves of the sizes indicated for connection to existing main shall be the cast gray, ductile, or malleable iron, split-sleeve type with flanged or grooved outlet, and with bolts, follower rings and gaskets on each end of the sleeve. Construction shall be suitable for a maximum working pressure of 150 psi. Bolts shall have square heads and hexagonal nuts. Longitudinal gaskets and mechanical joints with gaskets shall be as recommended by the manufacturer of the sleeve. When using grooved mechanical tee, it shall consist of an upper housing with full locating collar for rigid positioning which engages a machine-cut hole in pipe, encasing an elastomeric gasket which conforms to the pipe outside diameter around the hole and a lower housing with positioning lugs, secured together during assembly by nuts and bolts as specified, pretorqued to 50 foot-pound.
2.8.6 Service Boxes
Service boxes shall be cast iron or concrete and shall be extension service boxes of the length required for the depth of the line, with either screw or slide-type adjustment. The boxes shall have housings of sufficient size to completely cover the service stop or valve and shall be complete with identifying covers.
2.8.7 Disinfection
Chlorinating materials shall conform to the following:
Chlorine, Liquid: AWWA B301.
Hypochlorite, Calcium and Sodium: AWWA B300.
3.1 INSTALLATION
3.1.1 Cutting of Pipe
Cutting of pipe shall be done in a neat and workmanlike manner without damage to the pipe. Unless otherwise recommended by the manufacturer and authorized by the Contracting Officer, cutting shall be done with an approved type mechanical cutter. Wheel cutter shall be used when practicable.
Copper tubing shall be cut square and all burrs shall be removed. Squeeze type mechanical cutters shall not be used for ductile iron.
3.1.2 Adjacent Facilities
3.1.2.1 Sewer Lines
Where the location of the water pipe is not clearly defined in dimensions on the drawings, the water pipe shall not be laid closer horizontally than 10 feet from a sewer except where the bottom of the water pipe will be at least 18 inches above the top of the sewer pipe, in which case the water pipe shall not be laid closer horizontally than 6 feet from the sewer. Where water lines cross under gravity-flow sewer lines, the sewer pipe, for a distance of at least 10 feet each side of the crossing, shall be fully encased in concrete or shall be made of pressure pipe with no joint located within 3 feet horizontally of the crossing. Water lines shall in all cases cross above sewage force mains or inverted siphons and shall be not less than 2 feet above the sewer main. Joints in the sewer main, closer horizontally than 3 feet to the crossing, shall be encased in concrete.
SECTION 02510A Page 11
3.1.2.2 Water Lines
Water lines shall not be laid in the same trench with sewer lines, gas lines, fuel lines, or electric wiring.
3.1.2.3 Copper Tubing Lines
Copper tubing shall not be installed in the same trench with ferrous piping materials.
3.1.2.4 Nonferrous Metallic Pipe
Where nonferrous metallic pipe, e.g. copper tubing, crosses any ferrous piping material, a minimum vertical separation of 12 inches shall be maintained between pipes.
3.1.2.5 Casing Pipe (Where shown on drawings)
Water pipe shall be encased in a sleeve of rigid conduit for the lengths shown. Where sleeves are required, the pipe sleeve shall be steel, manufactured in accordance with AWWA C200. A minimum clearance of at least 2 inches between the inner wall of the sleeve and the maximum outside diameter of the sleeved pipe and joints shall be provided. Sand bedding or suitable pipe support shall be provided for the water pipe through the sleeve. Sleeves of ferrous material shall be provided with using a (SACRIFICIAL ANODE).
3.1.2.6 Structures
Where water pipe is required to be installed within 3 feet of existing structures, the water pipe shall be sleeved as required in Paragraph "Casing Pipe". The Contractor shall install the water pipe and sleeve ensuring that there will be no damage to the structures and no settlement or movement of foundations or footings.
3.1.3 Joint Deflection
3.1.3.1 Offset for Flexible Plastic Pipe
Maximum offset in alignment between adjacent pipe joints shall be as recommended by the manufacturer and approved by the Contracting Officer, but shall not exceed 5 degrees.
3.1.3.2 Allowable for Ductile-Iron Pipe
The maximum allowable deflection shall be as given in AWWA C600. If the alignment requires deflection in excess of the above limitations, special bends or a sufficient number of shorter lengths of pipe shall be furnished to provide angular deflections within the limit set forth.
3.1.4 Placing and Laying
Pipe and accessories shall be carefully lowered into the trench by means of derrick, ropes, belt slings, or other authorized equipment. Water-line materials shall not be dropped or dumped into the trench.
Abrasion of the pipe coating shall be avoided. Except where necessary in making connections with other lines or as authorized by the Contracting Officer, pipe shall be laid with the bells facing in the direction of laying. The full length of each section of pipe shall rest solidly upon the pipe bed, with recesses excavated to accommodate bells, couplings, and joints. Pipe that has the grade or joint disturbed after laying shall be taken up and relaid. Pipe shall not be laid in water or when trench conditions are unsuitable for the work. Water shall be kept out of the trench until joints are complete.
When work is not in progress, open ends of pipe, fittings, and valves shall be securely closed so that no trench water, earth, or other substance will enter the pipes or fittings. Where any part of the coating or lining is damaged, the repair shall be made by and at the Contractor's expense in a satisfactory
SECTION 02510A Page 12 manner. Pipe ends left for future connections shall be valved, plugged, or capped, and anchored, as shown.
3.1.4.1 Plastic Pipe Installation
PE Pipe shall be installed in accordance with ASTM D 2774. PVC pipe shall be installed in accordance with AWWA M23.
3.1.4.2 Piping Connections
Where connections are made between new work and existing mains, the connections shall be made by using specials and fittings to suit the actual conditions. When made under pressure, these connections shall be installed using standard methods as approved by the Contracting Officer. Connections to existing asbestos-cement pipe shall be made in accordance with ACPPA 1344.
3.1.4.3 Penetrations
Pipe passing through walls of valve pits and structures shall be provided with a link seal, ductile-iron or Schedule 40 steel wall sleeves as shown on drawings. Annular space between walls and sleeves shall be filled with rich cement mortar. Annular space between pipe and sleeves shall be filled with mastic.
3.1.4.4 Flanged Pipe
Flanged pipe shall only be installed above ground or with the flanges in valve pits.
3.1.5 Jointing
3.1.5.1 Reinforced Concrete Pipe Requirements
The inside and outside annular spaces between abutting sections of concrete pipe shall be filled with rich cement mortar in accordance with the pipe manufacturer's recommendations. Excess mortar shall be removed from interior annular spaces, leaving a smooth and continuous surface between pipe sections. Exposed portions of steel joint rings shall be protected from corrosion by a metallic coating or by an approved nonmetallic coating. Rubber gaskets shall be handled, lubricated where necessary, and installed in accordance with the pipe manufacturer's recommendations.
3.1.5.2 PE Pipe Requirements
Jointing shall comply with ASTM D 2657, Technique I-Socket Fusion or Technique II-Butt Fusion.
3.1.5.3 PVC Plastic Pipe Requirements
a. Pipe less than 4 inch diameter. Preformed rubber-ring gaskets for elastomeric-gasket joints shall be made in accordance with ASTM F 477 and as specified. Pipe ends for push-on joints shall be beveled to facilitate assembly and marked to indicate when the pipe is fully seated. The gasket shall be prelubricated to prevent displacement. The gasket and ring groove in the bell or coupling shall match. The manufacturer of the pipe or fitting shall supply the elastomeric gasket. Couplings shall be provided with stops or centering rings to assure that the coupling is centered on the joint. Solvent cement joints shall use sockets conforming to ASTM D 2467. The solvent cement used shall meet the requirements of ASTM D 2564; the joint assembly shall be made in accordance with ASTM D 2855 and the manufacturer's specific recommendations.
b. Pipe 4 through 12 inch diameter: Joints shall be elastomeric gasket as specified in AWWA
C900. Jointing procedure shall be as specified for pipe less than 4 inch diameter with configuration using elastomeric ring gasket.
SECTION 02510A Page 13
c. Pipe 14 through 36 inch diameter: Joints shall be elastomeric gasket push-on joints made in accordance with AWWA M23.
3.1.5.5 Ductile-Iron Pipe Requirements
Mechanical and push-on type joints shall be installed in accordance with AWWA C600 for buried lines or AWWA C606 for grooved and shouldered pipe above ground or in pits.
3.1.5.6 Copper Tubing Requirements
Joints shall be made with flared fittings. The flared end tube shall be pulled tightly against the tapered part of the fitting by a nut which is part of the fitting, so there is metal-to-metal contact.
3.1.5.7 Bonded Joints Requirements
Bonded joints shall be installed in accordance with details specified for joints in paragraph JOINTS.
3.1.5.8 Transition Fittings
Connections between different types of pipe and accessories shall be made with transition fittings approved by the Contracting Officer.
3.1.6 Installation of Service Lines
Service lines shall include the pipeline connecting building piping to water distribution lines to the connections with the building service at a point approximately 5 feet outside the building where such building service exists. Where building services are not installed, the Contractor shall terminate the service lines approximately 5 feet from the site of the proposed building at a point designated by the Contracting Officer. Such service lines shall be closed with plugs or caps. All service stops and valves shall be provided with service boxes. Service lines shall be constructed in accordance with the following requirements:
3.1.6.1 Service Lines (2 Inches) and Smaller
Service lines 2 inches and smaller shall be connected to the main by a directly-tapped corporation stop or by a service clamp. A corporation stop and a copper gooseneck shall be provided with either type of connection. Maximum sizes for directly-tapped corporation stops and for outlets with service clamps shall be as in TABLE I. Where 2 or more gooseneck connections to the main are required for an individual service, such connections shall be made with standard branch connections. The total clear area of the branches shall be at least equal to the clear area of the service which they are to supply.
TABLE I. SIZE OF CORPORATION STOPS AND OUTLET
Pipe Size Corporation Stops, Outlets w/Service Inches Inches Clamps, Inches For Ductile-Iron Pipe Single & Double Strap
3 -- 1
4 1 1
6 1-1/4 1-1/2
8 1-1/2 2
SECTION 02510A Page 14
10 1-1/2 2
12 & larger 2 2
NOTE:
a. Service lines 1-1/2 inches and smaller shall have a service stop.
b. Service lines 2 inches in size shall have a gate valve.
3.1.6.2 Service Lines Larger than (2 Inches)
Service lines larger than 2 inches shall be connected to the main by a tapped saddle, tapping sleeve and valve, service clamp or reducing tee, depending on the main diameter and the service line diameter, and shall have a gate valve.
3.1.6.3 Service Lines for Sprinkler Supplies
Water service lines used to supply building sprinkler systems for fire protection shall be connected to the water distribution main in accordance with NFPA 24.
3.1.7 Setting of Fire Hydrants, Meters, Valves and Valve Boxes
3.1.7.1 Location of Fire Hydrants
Fire hydrants shall be located and installed as shown. Each hydrant shall be connected to the main with a 6 inch branch line having at least as much cover as the distribution main. Hydrants shall be set plumb with pumper nozzle facing the roadway, with the center of the lowest outlet not less than 18 inches above the finished surrounding grade, and the operating nut not more than 48 inches above the finished surrounding grade. Fire hydrants designated on the drawings as low profile (restricted height) shall have the lowest outlet not less than 18 inches above the finished surrounding grade, the top of the hydrant not more than 24 inches above the finished surrounding grade. Except where approved otherwise, the backfill around hydrants shall be thoroughly compacted to the finished grade immediately after installation to obtain beneficial use of the hydrant as soon as practicable. The hydrant shall be set upon a slab of concrete not less than 4 inches thick and 15 inches square. Not less than 7 cubic feet of free-draining broken stone or gravel shall be placed around and beneath the waste opening of dry barrel hydrants to ensure drainage.
3.1.7.2 Location of Valves
After delivery, valves, including those in hydrants, shall be drained to prevent freezing and shall have the interiors cleaned of all foreign matter before installation. Stuffing boxes shall be tightened and hydrants and valves shall be fully opened and fully closed to ensure that all parts are in working condition. Check, pressure reducing, vacuum, and air relief valves shall be installed in valve pits.
Valves and valve boxes shall be installed where shown or specified, and shall be set plumb. Valve boxes shall be centered on the valves. Boxes shall be installed over each outside gate valve unless otherwise shown. Where feasible, valves shall be located outside the area of roads and streets. Earth fill shall be tamped around each valve box or pit to a distance of 4 feet on all sides of the box, or the undisturbed trench face if less than 4 feet.
3.1.7.3 Location of Service Boxes
Where water lines are located below paved streets having curbs, the boxes shall be installed directly back of the curbs. Where no curbing exists, service boxes shall be installed in accessible locations, beyond the limits of street surfacing, walks and driveways.
SECTION 02510A Page 15
3.1.9 Tapped Tees and Crosses
Tapped tees and crosses for future connections shall be installed where shown.
3.1.10 Thrust Restraint
Plugs, caps, tees and bends deflecting 11.25 degrees or more, either vertically or horizontally, on waterlines 4 inches in diameter or larger, and fire hydrants shall be provided with thrust restraints.
Valves shall be securely anchored or shall be provided with thrust restraints to prevent movement.
Thrust restraints shall be either restrained joints unless otherwise noted on drawings..
3.1.10.1 Thrust Blocks (Where directed only)
Thrust blocking shall be concrete of a mix not leaner than: 1 cement, 2-1/2 sand, 5 gravel; and having a compressive strength of not less than 2,000 psi after 28 days. Blocking shall be placed between solid ground and the hydrant or fitting to be anchored. Unless otherwise indicated or directed, the base and thrust bearing sides of thrust blocks shall be poured directly against undisturbed earth. The sides of thrust blocks not subject to thrust may be poured against forms. The area of bearing shall be as shown or as directed. Blocking shall be placed so that the fitting joints will be accessible for repair.
Steel rods and clamps, protected by galvanizing or by coating with bituminous paint, shall be used to anchor vertical down bends into gravity thrust blocks.
3.1.10.2 Restrained Joints
For ductile-iron pipe, restrained joints shall be mechanical joint wedge action restraint manufactured of ASTM 536, 60-42-12 ductile iron in accordance with AWWA C-600. PVC pipe restraints shall conform with AWWA C700 PVE pipe bell constructed of ASTM 536, 60-42-12 ductile iron with a pressure rating meeting or exceeding the pipe being restrained.
3.2 HYDROSTATIC TESTS
Where any section of a water line is provided with concrete thrust blocking for fittings or hydrants, the hydrostatic tests shall not be made until at least 5 days after installation of the concrete thrust blocking, unless otherwise approved.
3.2.1 Pressure Test
After the pipe is laid, the joints completed, fire hydrants permanently installed, and the trench partially backfilled leaving the joints exposed for examination, the newly laid piping or any valved section of piping shall, unless otherwise specified, be subjected for 1 hour to a hydrostatic pressure test of 200 psi. Water supply lines designated on the drawings shall be subjected for 1 hour to a hydrostatic pressure test of 200 psi. Each valve shall be opened and closed several times during the test.
Exposed pipe, joints, fittings, hydrants, and valves shall be carefully examined during the partially open trench test. Joints showing visible leakage shall be replaced or remade as necessary. Cracked or defective pipe, joints, fittings, hydrants and valves discovered in consequence of this pressure test shall be removed and replaced with sound material, and the test shall be repeated until the test results are satisfactory. The requirement for the joints to remain exposed for the hydrostatic tests may be waived by the Contracting Officer when one or more of the following conditions is encountered:
a. Wet or unstable soil conditions in the trench.
b. Compliance would require maintaining barricades and walkways around and across an open trench in a heavily used area that would require continuous surveillance to assure safe conditions.
SECTION 02510A Page 16
c. Maintaining the trench in an open condition would delay completion of the project.
The Contractor may request a waiver, setting forth in writing the reasons for the request and stating the alternative procedure proposed to comply with the required hydrostatic tests. Backfill placed prior to the tests shall be placed in accordance with the requirements of Section 02302N EXCAVATION, BACKFILLING AND COMPACTING FOR UTILITIES
3.2.2 Leakage Test
Leakage test shall be conducted after the pressure tests have been satisfactorily completed. The duration of each leakage test shall be at least 2 hours, and during the test the water line shall be subjected to not less than 200 psi pressure. Water supply lines designated on the drawings shall be subjected to a pressure equal to 200 psi. Leakage is defined as the quantity of water to be supplied into the newly laid pipe, or any valved or approved section, necessary to maintain pressure within 5 psi of the specified leakage test pressure after the pipe has been filled with water and the air expelled.
Piping installation will not be accepted if leakage exceeds the allowable leakage which is determined by the following formula:
L = 0.0001351ND(P raised to 0.5 power)
L = Allowable leakage in gallons per hour N = Number of joints in the length of pipeline tested D = Nominal diameter of the pipe in inches P = Average test pressure during the leakage test, in psi gauge
Should any test of pipe disclose leakage greater than that calculated by the above formula, the defective joints shall be located and repaired until the leakage is within the specified allowance, without additional cost to the Government.
3.2.3 Time for Making Test
Except for joint material setting or where concrete thrust blocks necessitate a 5-day delay, pipelines jointed with rubber gaskets, mechanical or push-on joints, or couplings may be subjected to hydrostatic pressure, inspected, and tested for leakage at any time after partial completion of backfill. Cement-mortar lined pipe may be filled with water as recommended by the manufacturer before being subjected to the pressure test and subsequent leakage test.
3.2.4 Concurrent Hydrostatic Tests
The Contractor may elect to conduct the hydrostatic tests using either or both of the following procedures. Regardless of the sequence of tests employed, the results of pressure tests, leakage tests, and disinfection shall be as specified. Replacement, repair or retesting required shall be accomplished by the Contractor at no additional cost to the Government.
a. Pressure test and leakage test may be conducted concurrently.
b. Hydrostatic tests and disinfection may be conducted concurrently, using the water treated for disinfection to accomplish the hydrostatic tests. If water is lost when treated for disinfection and air is admitted to the unit being tested, or if any repair procedure results in contamination of the unit, disinfection shall be reaccomplished.
3.2.5 Certified Flow Tests
a. The Contractor shall provide a certified flow test of each of the fire hydrants and provide data On the “As Built” drawings indicating the results of the flow tests at each of the fire hydrants.
SECTION 02510A Page 17
3.3 BACTERIAL DISINFECTION
3.3.1 Bacteriological Disinfection
Before acceptance of potable water operation, each unit of completed waterline shall be disinfected as prescribed by AWWA C651. After pressure tests have been made, the unit to be disinfected shall be thoroughly flushed with water until all entrained dirt and mud have been removed before introducing the chlorinating material. The chlorinating material shall be either liquid chlorine, calcium hypochlorite, or sodium hypochlorite, conforming to paragraph MISCELLANEOUS ITEMS. The chlorinating material shall provide a dosage of not less than 50 ppm and shall be introduced into the water lines in an approved manner. Polyvinyl Chloride (PVC) pipe lines shall be chlorinated using only the above specified chlorinating material in solution. The agent shall not be introduced into the line in a dry solid state. The treated water shall be retained in the pipe long enough to destroy all non-spore forming bacteria. Except where a shorter period is approved, the retention time shall be at least 24 hours and shall produce not less than 25 ppm of free chlorine residual throughout the line at the end of the retention period. Valves on the lines being disinfected shall be opened and closed several times during the contact period. The line shall then be flushed with clean water until the residual chlorine is reduced to less than 1.0 ppm. During the flushing period, each fire hydrant on the line shall be opened and closed several times. From several points in the unit, personnel from the Contractor's commercial laboratory shall take water samples a maximum of 1000 lineal foot intervals along the installed pipe., approved by the Contracting Officer, in proper sterilized containers and perform a bacterial examination in accordance with state approved methods. The commercial laboratory shall be certified by the state's approving authority for examination of potable water. The disinfection shall be repeated until tests indicate the absence of pollution for at least 2 full days. The unit will not be accepted until satisfactory bacteriological results have been obtained.
3.4 CLEANUP
Upon completion of the installation of water lines, and appurtenances, all debris and surplus materials resulting from the work shall be removed.
-- End of Section --