01356A.pdf

PDF 27 KB Posted

Attached to
Revitalize Water Distribution System
Solicitation number
FA6670-08-R-0003
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Site Visit Sign in sheet.pdf PDF
Addendum 3.pdf PDF
02081-02_C08.pdf PDF
02081-02_C02.pdf PDF
02081-02_C29.pdf PDF
02081-02_C30.pdf PDF
02081-02_C28.pdf PDF
02081-02_C15.pdf PDF
02081-02_C16.pdf PDF
02081-02_C25.pdf PDF
02081-02_C10.pdf PDF
02081-02_C32.pdf PDF
02081-02_C18.pdf PDF
02081-02_P01.pdf PDF
02081-02_C06.pdf PDF
02081-02_C21.pdf PDF
02081-02_C14.pdf PDF
02081-02_C23.pdf PDF
02081-02_C20.pdf PDF
02081-02_C12.pdf PDF
02081-02_C27.pdf PDF
02081-02_C07.pdf PDF
02081-02_C26.pdf PDF
Water Dist Sys Site Visit Notes.pdf PDF
SUBMITTAL LISTRev1.pdf PDF
01670Rev1.pdf PDF
TABLE OF CONTENTS Rev1.pdf PDF
0466-add 2.pdf PDF
02921ARev1pg7.pdf PDF
02510ARev1Pg3.pdf PDF
ADDENDUM No.1.pdf PDF
PROJECT TABLE OF CONTENTS.pdf PDF
02921A.pdf PDF
Ver2000_02081-02_C25.pdf PDF
Ver2000_02081-02_C24.pdf PDF
Ver2000_02081-02_C27.pdf PDF
FIGURE 1.pdf PDF
SWP3-ES-Jun03 2.pdf PDF
FIGURE 2.pdf PDF
01330.pdf PDF
02510A.pdf PDF
AFF 3000.pdf PDF
02742N.pdf PDF
Ver2000_02081-02_C26.pdf PDF
01572.pdf PDF
Performance Rating Questionnaire.pdf PDF
Source Selection Reference List.pdf PDF
Cost Estimate Breakdown.xls XLS spreadsheet
FA6670-08-R-0003.pdf PDF
Davis Bacon Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVITALIZE WATER DISTRIBUTION SYSTEM 94-0466

SECTION – 01356A - 1

SECTION 01356A

STORM WATER POLLUTION PREVENTION MEASURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM D 4439 Standard Terminology for Geosynthetics

ASTM D 4491 Water Permeability of Geotextiles by Permittivity

ASTM D 4533 Trapezoid Tearing Strength of Geotextiles

ASTM D 4632 Grab Breaking Load and Elongation of Geotextiles

ASTM D 4751 Determining Apparent Opening Size of a Geotextile

ASTM D 4873 Identification, Storage, and Handling of Geosynthetic Rolls

1.2 GENERAL

The Contractor shall implement the storm water pollution prevention measures specified in this section in a manner which will meet the requirements of Section 01355A ENVIRONMENTAL PROTECTION, and the requirements of the National Pollution Discharge Elimination System (NPDES) permit attached to that Section.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:

SD-07 Certificates

Mill Certificate or Affidavit; G, Certificate attesting that the Contractor has met all specified requirements.

1.4 EROSION AND SEDIMENT CONTROLS

The controls and measures required by the Contractor are described below, and further described in the Stormwater Pollution Prevention Plan.

SECTION – 01356A - 2

1.4.1 Disturbance

Soil disturbance should be kept to a minimum at all times during construction. Equipment bucket widths should not be larger than is required to dig a sufficient trench accordance with the contract documents.

Any material which will not be used as backfill shall be removed from the Base as it is excavated. As soon as possible after trench excavation and backfill, rough grading of the disturbed soil shall be performed and the Contractor shall seed and mulch the area of disturbance to stabilize the soils.

1.4.1.2 Temporary Restoration

The Contractor shall rough grade and seed areas after completing a maximum of 1000 linear feet of installation. Under no conditions with the Contractor be allowed to have excess of 1000 linear feet of excavated area which is not rough graded and seeded.

1.4.2 Stabilization Practices

The stabilization practices to be implemented shall include temporary seeding, mulching, sod stabilization, erosion control matts, protection of trees, etc. On his daily Report, the Contractor shall record the dates when the major grading activities occur, (e.g., clearing excavation, and grading); when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated. Except as provided in paragraphs UNSUITABLE CONDITIONS and NO ACTIVITY FOR LESS THAN 21 DAYS, stabilization practices shall be initiated as soon as practicable, but no more than 14 days, in any portion of the site where construction activities have temporarily or permanently ceased.

1.4.2.1 Unsuitable Conditions

Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases is precluded by unsuitable conditions caused by the weather, stabilization practices shall be initiated as soon as practicable after conditions become suitable.

1.4.2.2 No Activity for Less Than 21 Days

Where construction activity will resume on a portion of the site within 21 days from when activities ceased (e.g., the total time period that construction activity is temporarily ceased is less than 21 days), then stabilization practices do not have to be initiated on that portion of the site by the fourteenth day after construction activity temporarily ceased.

1.4.2.3 Structural Practices

Structural practices shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Structural practices shall be implemented in a timely manner during the construction process to minimize erosion and sediment runoff. Structural practices shall include the following devices. Location and details of installation and construction are shown on the drawings.

1.4.2.4 Silt Fences

The Contractor shall provide silt fences as a temporary structural practice to minimize erosion and sediment runoff. Silt fences shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g.

clearing and grubbing, excavation, embankment, and grading). Silt fences shall be installed in the

SECTION – 01356A - 3

locations indicated on the drawings. Final removal of silt fence barriers shall be upon approval by the Contracting Officer.

1.4.2.5 Straw Bales

The Contractor shall provide bales of straw as a temporary structural practice to minimize erosion and sediment runoff. Bales shall be properly placed to effectively retain sediment immediately after completing each phase of work (e.g., clearing and grubbing, excavation, embankment, and grading) in each independent runoff area (e.g., after clearing and grubbing in a area between a ridge and drain, bales shall be placed as work progresses, bales shall be removed/replaced/relocated as needed for work to progress in the drainage area). Areas where straw bales are to be used are shown on the drawings. Final removal of straw bale barriers shall be upon approval by the Contracting Officer.

Rows of bales of straw shall be provided as follows:

a. Along the downhill perimeter edge of all areas disturbed.

b. Along the top of the slope or top bank of drainage ditches, channels, swales, etc. that traverse disturbed areas.

c. Along the toe of all cut slopes and fill slopes of the construction areas.

d. Perpendicular to the flow in the bottom of existing drainage ditches, channels, swales, etc. that traverse disturbed areas or carry runoff from disturbed areas. Rows shall be spaced a maximum of 200 feet apart.

e. Perpendicular to the flow in the bottom of new drainage ditches, channels, and swales. Rows shall be spaced a maximum of 200 feet apart.

f. At the entrance to culverts that receive runoff from disturbed areas.

1.43.3 STORM DRAIN INLET PROTECTION

Whenever the trench excavation lies within ten (10) feet of the storm sewer drain inlet, Storm drain Inlet protection should be used. The protection shall include a filter fabric material and be constructed and approved in advance of the trench excavation.

PART 2 PRODUCTS

2.1 COMPONENTS FOR SILT FENCES

2.1.1 Filter Fabric

The geotextile shall comply with the requirements of ASTM D 4439, and shall consist of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. The filament shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of ester, propylene, or amide, and shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistance to deterioration due to ultraviolet and heat exposure. Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected usable construction life at a temperature range of -18 to 49 degrees C. The filter fabric shall meet the following requirements:

FILTER FABRIC FOR SILT SCREEN FENCE

PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT

Grab Tensile ASTM D 4632 100 lbs. min.

SECTION – 01356A - 4

Elongation (%) 30 % max.

Trapezoid Tear ASTM D 4533 55 lbs. min.

Permittivity ASTM D 4491 0.2 sec-1

AOS (U.S. Std Sieve) ASTM D 4751 20-100

2.1.2 Silt Fence Stakes and Posts

The Contractor may use either wooden stakes or steel posts for fence construction. Wooden stakes utilized for silt fence construction, shall have a minimum cross section of 2 inches by 2 inches when oak is used and 4 inches by 14 inches when pine is used, and shall have a minimum length of 5 feet.

Steel posts (standard "U" or "T" section) utilized for silt fence construction, shall have a minimum mass of 1 33 pounds per lineal foot and a minimum length of 5 feet

2.1.3 Mill Certificate or Affidavit

A mill certificate or affidavit shall be provided attesting that the fabric and factory seams meet chemical, physical, and manufacturing requirements specified above. The mill certificate or affidavit shall specify the actual Minimum Average Roll Values and shall identify the fabric supplied by roll identification numbers. The Contractor shall submit a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the filter fabric.

2.1.4 Identification Storage and Handling

Filter fabric shall be identified, stored and handled in accordance with ASTM D 4873.

2.2 COMPONENTS FOR STRAW BALES

The straw in the bales shall be stalks from oats, wheat, rye, barley, rice, or from grasses such as byhalia, bermuda, etc., furnished in air dry condition. The bales shall have a standard cross section of 14 inches by 18 inches. All bales shall be either wire-bound or string-tied. The Contractor may use either wooden stakes or steel posts to secure the straw bales to the ground. Wooden stakes utilized for this purpose, shall have a minimum dimensions of 2 inches by 2 inches in cross section and shall have a minimum length of 3 feet. Steel posts (standard "U" or "T" section) utilized for securing straw bales, shall have a minimum mass of 1.33 pounds per lineal foot and a minimum length of 5 feet.

PART 3 EXECUTION

3.1 INSTALLATION OF SILT FENCES

Silt fences shall extend a minimum of 16 inches above the ground surface and shall not exceed 34 inches above the ground surface. Filter fabric shall be from a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are unavoidable, filter fabric shall be spliced together at a support post, with a minimum 6 inch overlap, and securely sealed. A trench shall be excavated approximately 4 inches wide and 14 inches deep on the upslope side of the location of the silt fence.

The 4 inch by 4 inch trench shall be backfilled and the soil compacted over the filter fabric. Silt fences shall be removed upon approval by the Contracting Officer.

3.2 INSTALLATION OF STRAW BALES

Straw bales shall be placed in a single row, lengthwise on the contour, with ends of adjacent bales tightly abutting one another. Straw bales shall be installed so that bindings are oriented around the sides rather than along the tops and bottoms of the bales in order to prevent deterioration of the bindings. The barrier shall be entrenched and backfilled. A trench shall be excavated the width of a

SECTION – 01356A - 5

bale and the length of the proposed barrier to a minimum depth of 4 inch. After the bales are staked and chinked (gaps filled by wedging with straw), the excavated soil shall be backfilled against the barrier. Backfill soil shall conform to the ground level on the downhill side and shall be built up to 4 inch against the uphill side of the barrier. Loose straw shall be scattered over the area immediately uphill from a straw bale barrier to increase barrier efficiency. Each bale shall be securely anchored by at least two stakes driven through the bale. The first stake or steel post in each bale shall be driven toward the previously laid bale to force the bales together. Stakes or steel pickets shall be driven a minimum 18 inches deep into the ground to securely anchor the bales.

3.3 MAINTENANCE

The Contractor shall maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. The following procedures shall be followed to maintain the protective measures.

3.3.1 Silt Fence Maintenance

Silt fences shall be inspected in accordance with paragraph INSPECTIONS. Any required repairs shall be made promptly. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective, and the barrier is still necessary, the fabric shall be replaced promptly. Sediment deposits shall be removed when deposits reach one-third of the height of the barrier. When a silt fence is no longer required, it shall be removed. The immediate area occupied by the fence and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall be seeded in accordance with Section 02921A – Seeding.

3.3.2 Straw Bale Maintenance

Straw bale barriers shall be inspected in accordance with paragraph INSPECTIONS. Close attention shall be paid to the repair of damaged bales, end runs and undercutting beneath bales. Necessary repairs to barriers or replacement of bales shall be accomplished promptly. Sediment deposits shall be removed when deposits reach one-half of the height of the barrier. Bale rows used to retain sediment shall be turned uphill at each end of each row. When a straw bale barrier is no longer required, it shall be removed. The immediate area occupied by the bales and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall be seeded in accordance with Section 02922A Sodding.

3.3.3 Diversion Dike Maintenance

Diversion dikes shall be inspected in accordance with paragraph INSPECTIONS. Close attention shall be paid to the repair of damaged diversion dikes and necessary repairs shall be accomplished promptly. When diversion dikes are no longer required, they shall be shaped to an acceptable grade.

The areas disturbed by this shaping shall be seeded in accordance with Section 02921A –Seeding.

3.4 INSPECTIONS

3.4.1 General

The Contractor shall inspect disturbed areas of the construction site, areas used for storage of materials that are exposed to precipitation that have not been finally stabilized, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every seven (7) calendar days and within 24 hours of the end of any storm that produces 0.5 inchs or more rainfall at the site. Where sites have been finally stabilized, such inspection shall be conducted at least once every month.

SECTION – 01356A - 6

3.4.2 Inspections Details

Disturbed areas and areas used for material storage that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures identified in the Storm Water Pollution Prevention Plan shall be observed to ensure that they are operating correctly. Discharge locations or points shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters.

Locations where vehicles exit the site shall be inspected for evidence of offsite sediment tracking.

3.4.3 Inspection Reports

For each inspection conducted, the Contractor shall prepare a report summarizing the scope of the inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the Storm Water Pollution Prevention Plan, maintenance performed, and actions taken. The report shall be furnished to the Contracting Officer within 24 hours of the inspection as a part of the Contractor's daily REPORT. A copy of the inspection report shall be maintained on the job site.

3.4.4 Inspection Report and Certification Form for Erosion and Sediment Controls

In accordance with NYSDEC and NPDES quidelines, the Contractor shall provide weekly written report of all Erosion and sediment control activities to the Base Engineer. A certification form for Erosion and Sediment Control measures shall be developed and kept current. This certificate shall be completed at a minimum of seven (7) days or within 24 hours of a rainfall event of 0.5 inches or more.

--End – of - Section --