09_65_00_RESILIENT_FLOORING.pdf
PDF 40 KB Posted
- Attached to
- Renovation Repair Water Damage Bldg 874
- Solicitation number
- FA6648-19-R-A002
About this file
09 65 00 RESILIENT FLOORING
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 09 65 00 Page 1
SECTION 09 65 00
RESILIENT FLOORING
08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN FOREST FOUNDATION (AFF)
ATFS STANDARDS (2015) American Tree Farm System Standards of Sustainability 2015-2020
ASTM INTERNATIONAL (ASTM)
ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish
ASTM D5603 (2001; R 2008) Rubber Compounding Materials - Recycled Vulcanizate Particulate Rubber
ASTM E648 (2017a) Standard Test Method for Critical
Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source
ASTM F1066 (2004; R 2014; E 2014) Standard
Specification for Vinyl Composition Floor Tile
ASTM F1303 (2004; R 2014) Sheet Vinyl Floor Covering with Backing
ASTM F1344 (2015) Rubber Floor Tile
ASTM F1482 (2015) Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring
ASTM F1700 (2018a) Standard Specification for Solid
Vinyl Floor Tile
ASTM F1859 (2014; E 2016) Standard Specification for Rubber Sheet Floor Covering Without Backing
ASTM F1860 (2014; E 2016) Standard Specification for
Rubber Sheet Floor Covering With Backing
ASTM F1861 (2016) Standard Specification for
Resilient Wall Base
SECTION 09 65 00 Page 2
ASTM F1869 (2016) Standard Test Method for Measuring
Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F1913 (2004; R 2014) Vinyl Sheet Floor Covering
Without Backing
ASTM F2034 (2008; R 2013) Sheet Linoleum Floor
Covering
ASTM F2169 (2015; E 2016) Standard Specification for
Resilient Stair Treads
ASTM F2170 (2018) Standard Test Method for
Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
ASTM F2195 (2013) Linoleum Floor Tile
ASTM F710 (2017) Standard Practice for Preparing
Concrete Floors to Receive Resilient Flooring
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
CSA GROUP (CSA)
CSA Z809-08 (R2013) Sustainable Forest Management
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 3813 (2004) Resilient Floor Coverings - Cork Floor Tiles
PROGRAMME FOR ENDORSEMENT OF FOREST CERTIFICATION (PEFC)
PEFC ST 2002:2013 (2015) PEFC International Standard Chain of Custody of Forest Based Products Requirements
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SECTION 09 65 00 Page 3
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
SUSTAINABLE FOREST INITIATIVE (SFI)
SFI 2015-2019 (2015) Standards, Rules for Label Use, Procedures and Guidance
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program
For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 Submittals
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
SD-02 Shop Drawings
Resilient Flooring and Accessories; G
SD-03 Product Data
Resilient Flooring and Accessories; G
Adhesives
Vinyl Composition Tile
Wall Base
Stair Treads, Risers and Stringers
SD-04 Samples
SD-06 Test Reports
Moisture, Alkalinity and Bond Tests; G
SD-07 Certificates
Indoor Air Quality for Vinyl Composition Tile; G
Indoor Air Quality for Wall Base; G
Indoor Air Quality for Adhesives; G
SD-08 Manufacturer's Instructions
Surface Preparation; G
Installation; G
SECTION 09 65 00 Page 4
SD-10 Operation and Maintenance Data
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
Submit required indoor air quality certifications and validations in one submittal package.
1.3.1.1 Floor Covering Materials
Provide Vinyl Composition Tile and wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.3.1.2 Adhesives, Caulking and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area free from strong contaminant sources and residues with ambient air temperature maintained above 20 degrees C 68 degrees F and below 30 degrees C 85 degrees F, stacked according to manufacturer's recommendations. Remove resilient flooring products from packaging to allow ventilation prior to installation. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances. Observe ventilation and safety procedures specified in the MSDS. Do not store rubber surface products with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions, including. Do not store exposed rubber surface materials in occupied spaces.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain areas to receive resilient flooring at a temperature above 20 degrees C 68 degrees F and below 30 degrees C 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C 55 degrees F thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
1.6 SCHEDULING
Schedule resilient flooring application after the completion of other work
SECTION 09 65 00 Page 5 which would damage the finished surface of the flooring.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.
PART 2 PRODUCTS
2.1 VINYL COMPOSITION TILE TYPE A
Conform to ASTM F1066 Class 1, matching existing, Composition 1, asbestos-free, 300 mm (12 inch) square and 3.2 mm (1/8 inch) thick. Provide certification of indoor air quality for Vinyl Composition Tile.
2.2 WALL BASE
Conform to ASTM F1861, 3 mm (1/8 inch) thick, 100 mm (4 inches) high, Thermoplastics, group 2-layered. Style B-coved. Provide corners in matching height, shape, and color. Provide certification of indoor air quality for Wall Base.
2.3 STAIR TREADS, RISERS AND STRINGERS
Conform to ASTM F2169, Type TP thermoplastic rubber. Conform to ASTM F2169 for surface of treads, Class 1 smooth and Group 1 abrasive non-slip strip.
Provide either a one piece nosing/tread/riser or a two piece nosing/tread design with a matching coved riser.
2.4 MOULDING
Provide tapered mouldings of vinyl-colored anodized aluminum and types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 6 mm (1/4 inch). Provide bevel change in level between 6 and 13 mm (1/4 and 1/2 inch) with a slope no greater than 1:2. Fasteners for aluminum Mouldings: Stainless steel of type required for substrate condition.
2.5 ADHESIVES
Provide water resistant type adhesives for flooring, base and accessories as recommended by the manufacturer and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics. Provide Material Safety Data Sheets (MSDS) for all primers and adhesives to the Contracting Officer. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24).
SECTION 09 65 00 Page 6
2.6 SURFACE PREPARATION MATERIALS
Provide surface preparation materials, as needed, such as panel type underlayment, lining felt, and floor crack fillers as recommended by the flooring manufacturers for the subfloor conditions. Comply with ASTM F 1482 for panel type products. Use the following substrate: concrete.
2.7 POLISH/FINISH
Provide polish finish as recommended by the manufacturer and conform to ASTM D4078 for polish.
2.8 CAULKING AND SEALANTS
Provide caulking and sealants in accordance with Section 07 92 00 JOINT
SEALANTS.
2.9 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
Provide color, pattern and texture for resilient flooring and accessories as indicated on the drawings. Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern.
2.10 FIRE RESISTANCE TESTING REQUIREMENTS
Provide a minimum average critical radiant flux of 0.45 watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648.
PART 3 EXECUTION
3.1 EXAMINATION
Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation.
Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.
3.2 SURFACE PREPARATION
Provide a smooth, true, level plane for surface preparation of the flooring, except where indicated as sloped. Floor to be flat to within
4.75 in 3048 mm 3/16 inch in 10 feet. Prepare subfloor in accordance with flooring manufacturer's recommended instructions. Prepare the surfaces of lightweight concrete slabs (as defined by the flooring manufacturer) as recommended by the flooring manufacturer. Comply with ASTM F710 for concrete subfloor preparation. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used Floor fills or toppings may be required as recommended by the flooring manufacturer. Install
SECTION 09 65 00 Page 7 underlayments, when required by the flooring manufacturer, in accordance with manufacturers recommended printed installation instructions. Comply with ASTM F1482 for panel type underlayments. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, and uneven surfaces. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer. Remove concrete curing and sealer compounds from the slabs, other than the type that does not adversely affect adhesion. Remove paint, varnish, oils, release agents, sealers, waxes, existing floor covering and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions. Comply with local, state and federal regulations and the RFCI Recommended Work Practices for Removal of resilient Floor Coverings, as applicable to the floor covering being removed.
3.3 MOISTURE, ALKALINITY AND BOND TESTS
Determine the suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer. Conduct alkalinity testing as recommended by the flooring manufacturer. Determine the compatibility of the resilient flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's recommendations. Submit copy of test reports for moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.
3.4 GENERAL INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
3.5 PLACING VINYL COMPOSITION, LINOLEUM AND SOLID VINYL TILES
Install tile flooring and accessories in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's directions. Keep tile lines and joints square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Vary edge width as necessary to maintain full-size tiles in the field, no edge tile to be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Cut flooring to fit around all permanent fixtures, built-in furniture and cabinets, pipes, and outlets. Cut, fit, and scribe edge tile to walls and partitions after field flooring has been applied.
3.6 PLACING FEATURE STRIPS
Install feature strips in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions.
3.7 PLACING MOULDING
Provide moulding where flooring termination is higher than the adjacent finished flooring and at transitions between different flooring materials.
When required, locate moulding under door centerline. Moulding is not required at doorways where thresholds are provided. [Secure moulding with adhesive as recommended by the manufacturer. Prepare and apply adhesives in accordance with manufacturer's printed directions.] [Anchor aluminum
SECTION 09 65 00 Page 8 moulding to floor surfaces as recommended by the manufacturer.]
3.8 PLACING WALL BASE
Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.
3.9 PLACING STAIR TREADS, RISERS, AND STRINGERS
Secure and install stair treads, risers, and stringers in accordance with manufacturer's printed installation instructions. Cover the surface of treads and risers the full width of the stairs. Provide equal length pieces butted together to cover the treads and risers for stairs wider than manufacturer's standard lengths.
3.10 PLACING INTEGRAL COVED BASE
Install integral cove base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Shape integral coved base by extending the flooring material 100 mm (4 inch) onto the wall surface. Support cove by a filler. Provide a cap strip at the top of the base. Fill voids along the top edge of base at masonry walls with caulk.
3.11 CLEANING
Immediately upon completion of installation of flooring in a room or an area, dry and clean the flooring and adjacent surfaces to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's written instructions.
3.12 PROTECTION
From the time of installation until acceptance, protect flooring from damage as recommended by the flooring manufacturer. Remove and replace flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered.
-- End of Section --
08/10
File details come from the government source that posted it.