Draft Attch 09 - FINAL QASP YRRP Event Planning Services 18 Aug 2021.pdf
PDF 352 KB Posted
- Attached to
- HQ AFRC Yellow Ribbon Reintegration Program Event Planning Services Federal contract opportunity
- Solicitation number
- FA664321R0001
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP REVISION: 0 1
QUALITY ASSURANCE SURVEILLANCE PLAN
FOR
AIR FORCE RESERVE COMMAND
Yellow Ribbon Reintegration Program (YRRP) Event Planner Services (EPS)
18 Aug 2021
1138287579C Draft
QASP REVISION: 0 2
1.0 Purpose
1.1 This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
1.2 The contractor is responsible for implementing and delivering performance that meets contract standards using its own quality control plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to ensure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
1.3 The QASP is not part of the contract nor is it intended to duplicate the contractor’s Quality Control Plan.
This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance. Copies of the QASP and any revisions shall be provided to the Contracting Officer's Representative (COR) to facilitate implementation of surveillance activities. In addition, the QASP should recognize unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor. Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
1.4 This QASP is designed to provide the Multifunctional Team (MFT) a vehicle to ensure delivery of Event Planning Services within cost and on schedule. The QASP also provides the CORs an effective systematic surveillance method for each item listed in the Performance Work Statement (PWS), specifically on the Service Summary (SS). It is the Government’s responsibility to be objective, fair and consistent in their assessment of the Contractor’s performance. Communication and assessment actions stated in the QASP seek to ensure AFRC Yellow Ribbon Reintegration Program is provided with Event Planning Services that are acceptable and timely, and conducted in a manner that will achieve required objectives, cost savings and efficiencies.
1.5 The QASP is used for managing contractor performance assessment by ensuring that systematic quality assurance methods validate that contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards specified in the PWS. It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document contractor performance results to determine if the contractor has met the required performance standards for each objective in the PWS. Successful completion of the objectives for the performance of the contract constitutes success of the program.
1.6 Generally, Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. If commercial, quality assurance will be applied in accordance with commercial items clause.
QASP REVISION: 0 3
2.0 Assessment Management
2.1 Services Summary
Item Performance Objective PWS Reference Performance Threshold Method of Surveillance
1 Contractor shall provide Venue Recommendations
Table 1.4.1.2, Step 1
NLT 180 calendar days prior to start date of the event 90% of the time, remaining 10% occur within 150 calendar days prior to start date of the event.
Government COR 100% Inspection
2 Contractor meets all venue recommendation requirements
Paragraphs 1.4, 1.4.1.2
- General Hotel Rooms and Space and lodging rooms are located on one property (the same property)
- In-Person Event General Session Room(s) or Hybrid Event General Session Room(s), the In-Person Event breakout rooms or Hybrid Event breakout rooms, and the Information Fair shall be located in close proximity to each other to accommodate ten minute break(s) between training sessions
- General Session Room(s) shall accommodate all attendees without obstruction to visual aids
- Food and beverage requirements IAW paragraph 1.4
- Located within 60 miles of an airport with FAA classification as “National, Primary and Large Hub” (FAA Airport Classifications)
- Located within one mile of restaurants
- Venue shall have a minimum three diamond rating by American Automobile Association (AAA) Inspected & Approved
Occurs 90% of the time, 10% of the time exceptions may be approved by the Government.
Government COR 100% Inspection
3 Contractor shall secure and contract approved venue Table 1.4.1.2 Step
Within 10 calendar days of Government Task Order. Occurs 90% of the time, remaining 10% within 15 calendar days of approval.
Government COR 100% Inspection https://www.faa.gov/airports/planning_capacity/passenger_allcargo_stats/categories/ https://www.faa.gov/airports/planning_capacity/passenger_allcargo_stats/categories/
QASP REVISION: 0 4
4 Contracted venue information submitted to the Government in a timely manner Table 1.4.1.2 Step
Within 10 calendar days after Government approved venue is secured and contracted.
Occurs 90% of the time, remaining 10% within 15 calendar days of venue secured and contracted
Government COR 100% Inspection
5 The Contractor shall provide timely Monthly Status Reports. Paragraph 1.4.1.5
Due NLT the 10th day of the month.
Occurs 85% of the time, the remaining 15% are delivered NLT the 15th of the month.
Government COR 100% Inspection
6 The Contractor shall meet the audio/visual and or live streaming requirements and complete equipment “set up” IAW the Government Staging Document.
Paragraph 1.4.2
Occurs 80% of time one hour prior to event start time, the remaining 20% occurs within 30 minutes of event start time.
Government COR 100% Inspection
7 The Contractor shall provide virtual platform to live stream at Hybrid events.
Paragraphs 1.4.2.1, 1.4.8.4.3
-Live stream from the main General Session Room and one or more Hybrid Breakout Rooms concurrently.
- Provide accessibility to event and online participants for video, audio, chat, live captioning and slide viewing capabilities
Occurs 100% of the time
-Meet live streaming requirements and capabilities with no audio/video streaming delays.
Occurs 90% of time with no delays, 10% of the time with no more than a 30 second delay.
- Provide a registration link and password/meeting ID to the Government to provide access for each live streaming session NLT 10 days prior to start of event
Occurs 90% of the time NLT 10 days prior, 10% of the time within five days prior to start of event
- Provide a list of online event participants for each live streamed session to the Government within one business day of the event end date.
Occurs 90% of the time within one business day of end of event, 10% of the time within three business days of the event end date.
Government COR 100% Inspection
8 The Contractor shall record live streamed training sessions Paragraphs
1.4.2.1, 1.4.8.3
-Shall record live streamed training sessions according to the event Government Staging Document.
Occurs 100 % of the time
QASP REVISION: 0 5
-Provide accessibility to the recordings upon request from the Government within seven business days after the event end date of the event.
Occurs 90% of the time within seven business days after the event end date, 10% of the time within 10 business days of the event end date.
9 Contractor provides operational internet service connections
Paragraph 1.4.2, 1.4.8
A minimum of 25 high speed internet service connections shall be provided for General Hotel Rooms and Space, starting on Thursday 6:00AM event local time to Sunday 2:00PM event local time.
Occurs 100% of the time.
Government COR 100% Inspection
10 The Contractor shall ensure children and adult meals and refreshments are provided according to the approved menu, meeting all requirements
Paragraphs
1.4.4.1 - 1.4.4.4
Occurs 90% of the time, 10% of the time exceptions may be approved by the Government
Government COR 100% Inspection
11 The Contractor shall ensure children and adult meals and refreshments are served according to the hours prescribed in event Government Staging Document and Government Agenda provided for each specific event.
Paragraph 1.4.4
Occurs 90% of the time IAW the start time on the Government Agenda, 10% of the time served five minutes past the start time on the Government Agenda.
Government COR 100% Inspection
12 The Contractor shall provide childcare services
Paragraph 1.4.5
-Provide credentialed childcare providers, age appropriate materials, equipment and supplies.
-Shall provide planned age appropriate activities for 3-5 year olds
-Shall maintain minimum childcare provider-to-child ratios IAW AFI 34-144, Para. 13.6 and 13.7.
Occurs 100% of the time
Government COR 100% Inspection
13 Contractor maintains proper documentation for each child checked into event
Paragraph 1.4.5
This information shall be provided to the Government NLT one hour after event start time each day of event
Occurs 80% of the time, the remaining 20% of the time documentation provided
1.5 hours after the event start time each day.
QASP REVISION: 0 6
14 The Contractor shall provide timely childcare provider’s credentialing documents
Paragraph 1.4.5.1
Due seven calendar days prior to event start date.
Occurs 90% of the time, the remaining 10% shall NLT three days prior to event start date.
Government COR 100% Inspection
15 Childcare provider credentials meet AFRC qualifications
Paragraph 1.4.5.1
Childcare provider credentials meet AFRC qualifications IAW AFI34-144 , paragraph 10.3, 10.14-15, 11.2 with background checks conducted AFI 34- 144 Chapter 10.6 and include one (1) childcare provider certified in pediatric CPR IAW American Heart Association (AHA) Certification Occurs 100% of the time.
Government COR 100% Inspection
16 Contractor provides general hotel rooms and space IAW each Task Order
Paragraphs 1.4.8
Occurs 90% of the time. Government COR may approve deviations 10% of the time that at no additional cost to the Government.
Government COR 100% Inspection
17 Contractor shall provide or arrange luggage storage area/room
Paragraph 1.4.10
Occurs 100% of the time Government COR 100% Inspection
18 Contractor shall provide two flatbed carts each event
Paragraph 1.4.9
Occurs 100% of the time Government COR 100% Inspection
19 Contractor shall provide five daily on-site parking Paragraph
1.4.11
Occurs 100% of the time Government COR
20 Contractor shall reserve lodging room blocks on-site at event venue upon receipt of Government approved venue recommendation
Paragraph 1.4.12
- The Contractor shall reserve two blocks of lodging rooms (one block for event participants and one block for event staff)
-Each room block shall be adequate in number to support the anticipated number of event participants and event staff as specified on the approved venue recommendation
Occurs 100% of the time unless otherwise approved by the Government
Government COR 100% Inspection
21 Contractor shall provide timely Lodging Status Reports
Paragraph 1.4.13
Occurs 100% of the time Government COR
QASP REVISION: 0 7
22 Contractor shall provide a Virtual Platform online
Paragraphs 1.5, 1.5.2, -Virtual platform available IAW Task Order
- Up to nine concurrent live or pre-recorded training sessions per breakout period.
-Virtual platform provides accessibility to online participants for video, audio, chat, live captioning and online viewing capabilities live or pre-recorded for up to 1,000 participants in each period and up to 110 participants per training session according to the event Government Staging Document and Government Agenda
Occurs 100% of the time
-Meet live streaming requirements and capabilities for each event period with no audio/video streaming delays.
Occurs 90% of time with no delays, 10% of the time with no more than a 30 second delay.
Government COR 100% Inspection
23 Contractor provides Virtual Platform Accessibility
Paragraph 1.5.2.1
-Provide registration link and password/meeting ID to the Government for each training session NLT 10 days prior to the event start date.
Occurs 90% of the time 10 days prior to the event start date, 10% of the time within five days prior to event start date.
-Provide a list of online event participants for each session to the Government within one business day of the event end date.
Occurs 90% of the time within one business day, 10% of the time within three business days of the event end date.
24 Contractor provides Virtual Session Presenter Support
Paragraph 1.5.3
-Provide pre-conference rehearsal and technical checks for session presenters and Government event staff NLT 72 hours prior to event start date.
Occurs 90% of the time NLT 72 hours prior to the event start date, 10% of the time NLT 24 hours prior to the event start date.
-Perform video and audio checks with session presenters and Government event staff within one hour of event start time as needed.
QASP REVISION: 0 8
Occurs 90% of the time within one hour of the event start time, 10% of the time within 30 minutes of the event start time.
2.2 COR Online File Documentation
The COR will establish and maintain an online file containing training and surveillance documentation utilizing Joint Appointment Module (JAM) and Surveillance and Performance Monitoring (SPM). At a minimum, the following documentation will be uploaded in the CORT Tool by the COR or PCO as applicable.
a. COR INFORMATION (COR Profile):
Training and Appointment:
DAU CLC 222 Contracting Officers Representative (COR) Online Training U.S. Air Force Annual Ethics Training DoD 0020 Combatting Trafficking in Persons for Acquisition & Contracting Professionals CLC 046 DoD Sustainable Procurement Program CLC 107 OPSEC Training PIEE Web-Based Training for SPM, JAM and WAWF QAPC-Led Training Contract-Specific Training Refresher training (upload as one document – refer to COR Training Instructions) Documentation of filing the Annual OGE 450 QASP (uploaded by PCO or COR prior to designation) Designation of Contracting Officer’s Representative (Smart Form in JAM) Termination of Contracting Officer's Representative (Smart Form in JAM) Annual COR File Inspection Checklist(s) (uploaded by PCO)
Surveillance and Performance Monitoring Module (SPM):
COR Status Reports/Surveillance Checklist (upload by 10th of every month) CAR(s) COR Trip Reports (if applicable):
COR Correspondence Reports:
Meeting Minutes Contractor correspondence
Miscellaneous Documents:
Contract, including modifications (if not in EDA) PWS, including revisions Amended QASP DD Form 254 (if not in EDA) CDRL(s) (if not in EDA) CDRL/Deliverables (if not in WAWF)
QASP REVISION: 0 9
Contractor Safety Plan Applicable status report(s) Master/Delivery Schedules Customer Complaint Records WAWF report(s) and/or other documentation of Contractor payment (if not in WAWF)
2.3 Plan for Corrective Action
2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative COR Status Report. The COR will set a suspense date and forward the COR Status Report to the PCO for submission to the Contractor.
The PCO will submit the COR Status Report to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative COR Status Report to the PCO by the suspense date. The COR will upload the COR Status Report in the SPM under COR Documents.
2.3.2 If repetitive negative COR Status Reports or a single negative COR Status Report identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will initiate the CAR process.
However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the MFT by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The COR will upload the CAR in the SPM tool under COR Documents. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.
2.3.3 CORs shall establish a tracking system for corrective actions that includes date COR submitted CAR to PM/FSM, date reviewed by PM/FSM, date reviewed by CO, date issued by CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date.
2.4 Acceptance of Services
2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area WorkFlow. Services will be accepted by the Yellow Ribbon Program Manager.
2.4.2 CDRL deliverables may be submitted using WAWF or be submitted directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
3.0 Roles and Responsibilities of Multi-Functional Team (MFT)
3.1 General Responsibilities
3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s) Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.
3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure Government requirements including quality of services, cost and schedule are met. The MFT will provide the results of their
QASP REVISION: 0 10
surveillance to the Contracting Officer’s Representative (COR) for input into the COR Status Report and to the MFT member updating the Contractor Performance Assessment Reporting System (CPARS).
3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors Quality Management System (QMS) that tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality directly relates to the CPARS category of “Quality”.
3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.
3.2 Contracting Officer’s Representative (COR)
3.2.1 Registers in Procurement Integrated Enterprise Environment (PIEE) as a COR in the Surveillance and Performance Monitoring (SPM) tool. Self-nominates in Joint Appointment Module (JAM) as the designated COR for the contract. If required, files an Office of Government Ethics (OGE) Form 450, Confidential Financial Disclosure Report. Establishes and maintains an online file containing training and surveillance documentation in SPM.
3.2.2 Registers for an account within System for Award Management (SAM) after designation as a COR. No later than 60 calendar days after contract/order award, verifies the Contractor has established a record for the contract/order in SAM. Reviews for reasonableness and consistency. Verifies the Contractor has reported all data for each fiscal year, including an annual count of contractor/subcontractor personnel performing services and the total of contractor/subcontractor labor hours, no later than October 31 of the following fiscal year.
Additional information and user manuals for government personnel and Contractors are available at the SAM website (https://www.sam.gov).
3.2.3 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the Procuring Contracting Officer (PCO).
Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met. Develops an inspection schedule that shall comprise of at least ten percent of non-services summary items, but no more than twenty percent. Monitors control and disposition of Government property. Monitors Contractor payment and verifies it is commensurate with Contractor performance. Documents Contractor performance via COR Status Reports and Surveillance Checklist Corrective Action Report(s) (CAR), etc. Issues COR Status Report and Surveillance Checklist, at a minimum monthly, and negative COR Status Report(s) or CAR(s) as required.
3.2.4 Ensure contractor’s accepted Quality Management System (QMS) complies with contract requirements. In post award, CORs need to place special emphasis in ensuring the contractor’s QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.
3.3 Contracting Officer’s Representative (COR) Supervisor
3.3.1 Selects a qualified COR nominee with the agency experience, relevant technical experience and general competencies as outlined in DoDI 5000.72, Enclosure 6, Tables 1-4. Waivers for agency experience must be addressed in nomination package. Confirms the COR nominee has no personal conflicts of interest with https://www.sam.gov/
QASP REVISION: 0 11
performing the responsibilities to be delegated by the PCO. Verifies the COR nominee has the appropriate clearance for the contract/order. Ensures the COR nominee files an OGE Form 450. Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 8 hours of refresher training for Type A contracts and 16 hours of refresher training for Type B and C contracts every three years after completion of the QAPC-Led Training.
3.3.2 Registers for the role of Manger in PIEE in the SPM application
3.3.3 Ensures the COR registers in PIEE as a SPM user. Ensures the COR self-nominates as the designated COR for the contract in JAM. Upon notification of the COR self-nomination, approves the nomination in JAM via email link. Reviews the COR’s Surveillance File, at a minimum, annually. Considers performance of COR duties in their appraisal.
3.4 Procuring Contracting Officer (PCO)
3.4.1 Only individual authorized to enter into contracts for supplies and/or services by obligating the Government. Determines if a COR is required to conduct/document surveillance of Contractor performance. If the requiring activity has not initiated a COR nomination in the JAM, submits a Request for Contracting Officer’s Representative Support memorandum to the requiring activity. Determines whether a COR is required to file an OGE Form 450. Provides Contract-Specific Training to the COR.
3.4.2 Upon notification of COR Supervisor approval of the COR self-nomination, approves the nomination in the JAM. Before contract/order award, submits a Designation of Contracting Officer’s Representative memorandum to the COR and COR Supervisor for signature and provides copy to the Contractor, thereby ensuring the Contractor is notified of the COR assigned to the contract/order and their areas of responsibility and limitation of authority. Ensures Designation Letter is uploaded in SPM. Upon transfer/termination of the COR, issues a Revocation (Termination) of Designation of Contracting Officer’s Representative letter in JAM (Smart Form).
3.4.3 After the COR is designated, uploads a blank copy of the CO’s Annual COR File Inspection Checklist to the SPM module under "Surveillance Documents" to guide the COR in constructing the COR Online File.
Reviews the Surveillance Checklist and COR Status Reports in SPM. Approves/Rejects COR Status Reports and any CAR(s). Reviews the COR’s Surveillance File, at a minimum, annually. Documents the results of their review on the Annual COR File Inspection Checklist. Uploads the checklist in the SPM tool under "Surveillance Documents" with CO, COR and COR Supervisor signatures.
3.5 Quality Assurance Program Coordinator (QAPC)
3.5.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management [e.g., FC/FD. COR supervisor, etc.]
3.5.2 Provides functional, not technical, support for SPM and JAM users including assistance with registration, role activation and training. Monitors records of COR and COR management training in the SPM tool.
3.6 Contractor
3.6.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or Sole Source Justification (SSJ) if the acquisition is sole source and upon contract/order award if it is competitive.
QASP REVISION: 0 12
3.6.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.
3.7 Functional Commander/Functional Director (FC/FD)
The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis. Reference PWS and QASP signature page.
4.0 Management Strategy
4.1 The MFT will meet and record minutes annually to review contractor’s performance. The COR will complete COR Status Report (SPM Smart Form) and Surveillance Checklist, documenting both satisfactory and unsatisfactory Contractor performance and uploading to SPM no later than the 10th of the month following surveillance. The COR Status Report will be completed as a Smart Form and will automatically upload to SPM upon the COR’s submission for PCO to accept or reject. The Surveillance Checklist must be completed monthly in conjunction with the COR Status Report and uploaded to SPM under COR Documents for PCO review.
Unsatisfactory Contractor performance will result in the COR issuing a negative COR Status Report. PCO approved COR Status Report and Surveillance Checklist will be sent to the contractor. PCO signed negative COR Status Reports will be forwarded to Contractor for acknowledgement and corrective action.
4.2 If repetitive negative COR Status Reports or a single negative COR Status Report identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will issue a CAR. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory Contractor performance, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.
4.3 Incentives
4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance, favorable CPARs and exercising options.
4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order.
5.0 Annual COR Online File Inspection: The COR, the COR Supervisor and the PCO will review the COR’s Surveillance File, at a minimum, annually. The PCO will document the results of their review on the Annual COR File Inspection Checklist. After the COR and COR supervisor sign the checklist, the PCO will upload the checklist in the SPM tool.
6.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.
QASP REVISION: 0 13
6.1 The MFT will evaluate Contractor performance. The Yellow Ribbon Program Manager will, at a minimum, review the COR Status Reports and other information contained in the COR’s Surveillance File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.
6.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the COR will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via CPARS.
6.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.
Performance Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
7.0 Safety Requirements
7.1 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property;
occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel;
injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non- DoD personnel caused by Government operations. The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone within one business hour. The Contractor shall cooperate with Government safety investigations.
QASP REVISION: 0 14
7.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR.
The COR will monitor Contractor reporting and review any mishap notifications. The COR will address safety and/or health issues in the COR Status Report or in a CAR as applicable.
8.0 Trafficking in Persons: The MFT must inform the PCO if the contractor/subcontractor fails to comply with the requirements of FAR 52.222.50, Combating Trafficking in Persons. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of the Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).
QASP REVISION: 0 15
9.0 Signatures
By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.
____________________________________________ 18 Aug 2021 QAPC, HQ AFRC/PKO Date
COR Date
COR Supervisor Date
PCO Date
IAW AFI 63-138, section 2.10, you are approving this Performance Based Quality Assurance Surveillance Plan (QASP) and identifying that these services are not mission-essential.
PM/FSM Date
| 2021-08-18T12:51:08-0400 | |
| CHAMBERS.CAROL.R.1367940707 |
| 2021-08-18T14:22:07-0400 | |
| MAY.RACHEL.ANN.1138287579 |
File details come from the government source that posted it. Updated .