Site Visit Questions & Responses – SET #1
FA6633-15-R-0002/QJKL 11-0014
Repair Door Heating Track, Bldg 821, Minneapolis ARS, MN
SET #1 – 20 April 2015
1. QUESTION: Can the section of concrete and track shown in phase 1 be poured in more than one section or does this have to be one 179’ pour?
RESPONSE: One continuous pour is required.
2. QUESTION: . Is Note 5 on Drawing G-001 about constructing a temporary access road correct?
RESPONSE: No – a temporary access road is not needed on this project. Note will be deleted – solicitation will be amended with corrected drawing attached.
3. QUESTION: . It appears on Drawing A-601 the Phasing Notes description is opposite of what the diagram shows – which is correct.
RESPONSE: The diagram is correct. The solicitation will be amended with a corrected drawing attached.
20 April 2015 Page 1