AREA OF WORK
BLDG 821
PLAN NORTH
BASE CONTRACTING
BLDG 729
BASE CIVIL ENGINEERING
BLDG 744
MAIN GATE
CONSTRUCTION HAUL ROUTE
1. THE CONTRACTOR MUST COORDINATE WITH THE ASSIGNED GOVERMENT
ESCORT BEFORE ENTERING OR LEAVING THE CONTROLLED AREA THROUGH
ACCESS GATE BY BUILDING 802. ALL CONTRACTOR RESOURCES (VEHICLES,
EQUIPMENT, ETC.) MUST USE A DIRECT ROUTE BETWEEN THE ACCESS GATE AND
THE FREE ZONE ENTRANCE AND ARE NOT ALLOWED IN OTHER ADJACENT
CONTROLLED/RESTRICTED AREAS (UNLESS SPECIAL ARRANGEMENTS ARE PRE-
COORDINATED AND APPROVED IN ADVANCE.)
2. AT THE BEGINNING OF EACH WORK DAY, THE CONTRACTOR MUST NOTIFY THE
ASSIGNED GOVERNMENT ESCORT BEFORE OPENING THE ENTRANCE TO THE FREE
ZONE AREA. LIKEWISE, AT THE END OF THE WORK DAY, THE CONTRACTOR MUST
AGAIN NOTIFY THE GOVERNMENT ESCORT BEFORE CLOSING THE ENTRANCE TO
THE FREE ZONE AREA.
3. CONTRACTOR SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS FOR
PROVIDING THE FREE ZONE BARRICADES:
• BARRICADES SHALL BE "BICYCLE-RACK" TYPE
• BARRICADES SHALL BE SECURED WITH SAND BAGS TO ENSURE NO
MOVEMENT DURING HIGH WINDS
• PLASTIC ORANGE MESH FENCING SHALL BE ATTACHED TO THE BARRICADES
• REFLECTIVE SIGNS SHALL BE ATTACHED TO THE BARRICADES EVER 50 FEET
• ORANGE FLASHING LIGHTS SHALL ALSO BE ATTACHED TO THE BARRICADES;
EVERY 50 FEET POSITIONED BETWEEN THE REFLECTIVE SIGNS
• IF THE BARRICADES ARE MOVED, TURNED OVER, ETC. BY HIGH WINDS; THE
CONTRACTOR SHALL RESPOND IMMEDIATELY TO RESTORE THE FREE ZONE
BARRICADES IN THEIR ORIGINAL POSITION
4. THIS CROSS HATCHED AREA IS DESIGNED AS OBJECT FREE AREA. IN THIS
AREA, THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS:
• AT THE END OF EACH WORK DAY, ALL VEHICLES, EQUIPMENT, ETC. SHALL BE
RELOCATED OUTSIDE OF THE OBJECT FREE AREA.
• WHEN THE ADJACENT COMMERCIAL RUNWAY (04-22) IS BEING UTILIZED, NO
VEHICLES, EQUIPMENT OR PERSONEL WILL BE ALLOWED IN THE OBJECT FREE
AREA.
5. CONSTRUCT TEMPORARY TAXIWAY ACCESS DRIVE (12 FEET WIDE) PRIOR TO
FURNISHING AND INSTALLING THE FREE ZONE FENCE. DRIVE SHALL CONSIST OF
2" ASPHALT BINDER COURSE (LVNW3503) OVER 6" AGGREGATE BASE COURSE
(CLASS 5).
FREE ZONE GENERAL NOTES:
801 802
FREE ZONE 2
FREE ZONE 1
E N
T E
R
WORK AREA 2
WORK AREA 1
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
934TH AIRLIFT WING
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
C O
V E
R S
H E
E T
F A
-1
-D
-0
G-001
J A
N U
A R
Y
Q J K
L
-0
REPAIR DOOR HEATING TRACK - BUILDING 821
JANUARY 7, 2015
CONTRACT NUMBER: FA6643-10-D-0002
TASK ORDER NUMBER: 6N10
PROJECT NUMBER: QJKL 11-0014
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
MINNEAPOLIS-SAINT PAUL AIR RESERVE STATION
760 MILITARY HIGHWAY
MINNEAPOLIS, MN 55450-2100
# OF
TOTAL
SHEET
NUMBER SHEET TITLE
GENERAL
1 G-001 COVER SHEET
ARCHITECTURAL
2 A-001 GENERAL NOTES & LEGENDS
3 AD101 DEMOLITION FLOOR PLAN
4 AD401 DEMOLITION ENLARGED FLOOR PLANS
5 AD501 DEMOLITION DETAILS
6 A-101 FIRST FLOOR PLAN
7 A-401 ENLARGED FLOOR PLANS
8 A-501 DETAILS
9 A-601 PHASING PLAN
MECHANICAL
10 M-001 MECHANICAL LEGEND, GENERAL NOTES, DETAILS &
SCHEDULES
11 MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
12 M-101 FIRST FLOOR MECHANICAL NEW WORK PLAN
13 M-401 BASEMENT MECHANICAL ENLARGED PLAN
14 M-501 MECHANICAL SECTION AND DETAILS
15 M-502 MECHANICAL DETAILS
ELECTRICAL
16 E-001 ELECTRICAL GENERAL NOTES AND LEGENDS
17 ED101 FIRST FLOOR DEMOLITION PLAN
18 E-100 BASEMENT POWER PLANS
19 E-101 FIRST FLOOR NEW WORK POWER PLAN
Grand total: 19
INDEX OF DRAWINGS
SCALE: NOT TO SCALE
BASE LOCATION MAP
SCALE: NOT TO SCALE
AREA LOCATION MAP
SCALE: 1" = 60'-0"
FREE ZONE AREA BASE MAP
CONTRACTING OFFICER: CYNTHIA MURRY
PHONE: 612-713-1427
EMAIL: cynthia.murry@us.af.mil
ADDRESS: 934 CONF/LGC
760 MILITARY HIGHWAY, BLDG 729
MINNEAPOLIS-ST PAUL ARS, MIN 55450-2100
OWNER
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK. THE DRAWINGS ARE
NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL
PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS, ON THE BASIS OF THE GENERAL PERFORMANCE CRITERIA AND
GENERAL EXTENT OF WORK INDICATED, DESCRIBED OR REQUIRED.
2. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE
CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER ITEMS
NECESSARY OR IMPLIED THEREFROM.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE
WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE
CONDITION.
4. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S
PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL
AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY
CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT
TO THE CONTRACTING OFFICER'S ATTENTION PRIOR TO PROCEEDING WITH THE
WORK.
5. THE CONTRACTOR SHALL PROTECT EXISTING, IN-PLACE, AND NEW WORK.
6. ALL WORK NOTED "N.I.C." OR "G.F.G.I." IS NOT MEANT TO BE PART OF THE
CONSTRUCTION SCOPE OF WORK AGREEMENT.
7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE COLLECTION, SEPARATION,
RECYCLE, REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW AND
EXISTING CONDITIONS, SHOWN ON THESE DRAWINGS, AT THE SITE. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING OF ANY
DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK. COMMENCEMENT OF
WORK SHALL CONSTITUTE ACCEPTANCE OF ALL NEW OR EXISTING CONDITIONS.
9. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN
OVER SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IN WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF
WORK.
10.DIMENSIONS NOTED AS 'HOLD' SHALL NOT VARY BY MORE THAN 1/8" FROM SIDE TO
SIDE OR FROM FRONT TO BACK, FINISHED SURFACE TO FINISHED SURFACE.
11.NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION
OPERATIONS SHALL BE APPLIED.
12.PROVIDE EXPANSION AND CONTROL JOINTS IN ALL WORK AS PER PRODUCT
MANUFACTURER'S STANDARDS.
13.THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL
APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES AND SHALL OBTAIN
NECESSARY BUILDING AND FIRE PERMITS FROM ALL AUTHORITIES HAVING
JURISDICTION.
14.ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC
CORROSION.
15.NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS.
SHEETS ARE TO BE REVIEWED AND NOTES ON ANY ONE SHEET ARE TO BE APPLIED
TO RELATED DRAWINGS AND DETAILS.
16.DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE
SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED,
CONSULT THE CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.
17.THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL FLOOR
AND WALL SLEEVES, CONDUIT AND ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, STRUCTURAL AND ARCHITECTURAL ITEMS.
18.PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED
FOR MECHANICAL EQUIPMENT AND PLUMBING WORK. ALL ACCESS PANEL LOCATIONS
SHALL BE REVIEWED WITH THE CONTRACTING OFFICER PRIOR TO PROCEEDING.
19.ALL PIPE DUCTS AND BUS DUCTS THAT PENETRATE FLOOR SLABS OR WALL
PARTITIONS SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE
RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
20.CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR
PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A
MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
21.CONTRACTOR SHALL COORDINATE THE PHASING OF THE WORK TO BE PERFORMED
IN OR ABOUT EXISTING FACILITIES WITH CONTRACTING OFFICER, PRIOR TO START OF
SUCH WORK.
GENERAL NEW WORK NOTES:
EARTH
STRUCTURAL FILL
GRAVEL/STONE
CONCRETE/GROUT
CONCRETE
MASONRY UNITS
(CMU)
CMU IN SECTION
FACE BRICK
IN SECTION
CMU RUNNING
BOND ELEVATION
MODULAR BRICK
ELEVATION
EXPOSED FINISHED
WOOD TRIM IN SECTION
RIGID INSULATION
IN SECTION
BATT INSULATION
- THERMAL
SAND/E.I.F.S./
PLASTER/STUCCO
MATERIAL INDICATIONS:
STEEL IN SECTION
PLYWOOD IN SECTION
ELEVATIONS OF GLAZING
1. ALL EXISTING CONDITIONS AND DIMENSIONS SPECIFIED PER ORIGINAL DESIGN DRAWINGS
AND NON-DESTRUCTIVE SITE INVESTIGATIONS. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO START OF DEMOLITION/CONSTRUCTION (TYP.) AND NOTIFY
GOVERNMENT PROMPTLY IF ANY DISCREPANCIES EXIST.
2. REMOVE ALL EXISTING WORK/MATERIAL, AS DESIGNATED, IN THEIR ENTIRETY DOWN TO
ORIGINAL SUBSTRATES IN INDICATED AREAS TO PERMIT COMPLETION OF ALL REPAIRS
AND REPLACEMENTS.
GENERAL DEMOLITION NOTES:
A1 View Name
SCALE: 1/8" = 1'-0"
DRAWING VIEW TITLE
DRAWING VIEW SCALE
DRAWING VIEW NUMBER
DRAWING TITLE INDICATOR
REVISION NUMBER
LIMIT OF REVISION AREA
REVISION CLOUD AND
NUMBER INDICATOR
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
LIMIT OF ENLARGED AREA
ENLARGED DETAIL/AREA INDICATOR
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
BUILDING SECTION INDICATOR
LINE OF CUTTING PLANE
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
LINE OF CUTTING PLANE
WALL SECTION INDICATOR
SHEET DETAIL IS LOCATED ON
LIMIT OF CUTTING PLANE
DETAIL NUMBER
DIRECTION OF ELEVATION
EXTERIOR ELEVATION INDICATOR
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
DIRECTION OF ELEVATION
INTERIOR ELEVATION INDICATOR
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
DETAIL CALLOUT INDICATOR
(MULTIPLE CALLOUTS)
A1
A-101
A2
A-102
A3
A-103
DRAWING SCALE INDICATOR164 8268
SCALE: 1/8"=1'-0"
GRAPHIC SCALE
NORTH ARROW
A101
A1 Ref
A101
A1
Ref
SYMBOLS:
A101
A1
Ref
A101
A1
Ref
A1
A-101
LIMIT OF CUTTING PLANE
PLAN NORTH
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
G E
N E
R A
L N
O T
E S
L
E G
E N
D S
F A
-1
-D
-0
A-001
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
ARCHITECTURAL ABBREVIATIONS
PRE-FAB PREFABRICATED
Q
Q.T. QUARRY TILE
R
RECEP. RECEPTIONIST
REF. REFERENCE
REINF. REINFORCEMENT
REQ'D REQUIRED
REV. REVISIONS / REVISED
RH RIGHT HAND
RHR RIGHT HAND REVERSE
R.D. ROOF DRAIN
RM. ROOM
R.O. ROUGH OPENING
RB RUBBER BASE
S
SCHED. SCHEDULE
SECT. SECTION
SHT. MET. SHEET METAL
SIM. SIMILAR
SCWD SOLID CORE WOOD
STC SOUND TRANSMISSION CLASS
SPEC. SPECIFICATION
SFRM SPRAYED FIRE-RESISTIVE
MATERIAL
SQ. SQUARE
ST. STAIN
S.S. STAINLESS STEEL
STD. STANDARD
STL. STEEL
STOR. STORAGE
STRUCT. STRUCTURAL
SUSP. SUSPENDED
T
TEL. TELEPHONE
TG TEMPERED GLASS
THK. THICK
T'HOLD THRESHOLD
TOIL. TOILET
TOC TOP OF CONRETE
TC TOP OF CURB
TOS TOP OF STEEL
TW TOP OF WALL
TU TOUCH UP
TYP. TYPICAL
U
UL UNDERWRITERS
LABORATORIES
UNFIN. UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
V
V.T.R. VENT THRU ROOF
VERT. VERTICAL
VCT VINYL COMPOSITION TILE
VCB VINYL COVE BASE
W
W.C. WATER CLOSET
W.R.G.B. WATER-RESISTANT GYP.
BOARD
W.S. WEATHERSTRIPPING
W. WIDTH
WDW. WINDOW
W.R.O. WINDOW ROUGH OPENING
W.M.P. WIRE MESH PARTITION
W/ WITH
W/O WITHOUT
WD. WOOD
Y
YD. YARD
ARCHITECTURAL ABBREVIATIONS
FTG. FOOTING
FDN. FOUNDATION
G
GA. GAGE OR GAUGE
GALV. GALVANIZED
GL. GLASS
GOVT. GOVERNMENT
G.F.G.I. GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GYP. GYPSUM
GYP. BD.
(GWB)
GYPSUM BOARD
G.B.F. GYPSUM BOARD FURRING
H
HR. HANDRAIL
HDW. HARDWARE
H.V.A.C. HEATING VENTILATION & AIR
CONDITIONING
HGT. HEIGHT OR HIGH
H.P. HIGH POINT
H.M. HOLLOW METAL
HKS HOOKS
HORIZ. HORIZONTAL
HB HOSE BIBB
I
IN. INCH
INSUL. INSULATION
INT. INTERIOR
J
JAN. JANITOR
J.C. JANITOR'S CLOSET
JT JOINT
JST. JOIST
L
LAM. LAMINATE
LDG LANDING
LAV. LAVATORY
L.H. LEFT HAND
LHR LEFT HAND REVERSE
LT. LIGHT
LTG LIGHTING
LONG. LONGITUDINAL
LVR. LOUVER
LP. LOW POINT
M
MGR. MANAGER
MANUF. MANUFACTURER
MAS. MASONRY
M.O. MASONRY OPENING
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MET. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
N
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
N.I.C. NOT IN CONTRACT
NTS NOT TO SCALE
NO. (#) NUMBER
O
OSHA OCCUPATIONAL SAFETY AND
HEALTH ACT
O.C. ON CENTER
O.W. OPEN WEB
OPNG. OPENING
OPP. OPPOSITE
O.H. OPPOSITE HAND
P
PT PAINT
PR. PAIR
PNL PANEL
PART. PARTITION
PLAS. PLASTER
PLAN. PLASTIC LAMINATE
PL PLATE
PLYWD PLYWOOD
LBS. POUNDS
PSF POUNDS/SQUARE FOOT
PSI POUNDS/SQUARE INCH
PDU POWER DISTRIBUTION UNIT
P.M.J.F. PRE-MOLDED JOINT FILLER
ARCHITECTURAL ABBREVIATIONS
A
A.F.F. ABOVE FINISHED FLOOR
ACC. DR. ACCESS DOOR/PANEL
ACCESS. ACCESSORIES
ACOUST. ACOUSTICAL
ACT. ACTIVE
ADJ. ADJUST/ADJUSTABLE
A.C. AIR CONDITIONING
ALUM. ALUMINUM
ADAAG AMERICAN WITH DISABILTITES
ACCESSIBILITY GUIDELINES
A.B. ANCHOR BOLT
& AND
ANG. ANGLE
APP. APPROVED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
A.W.I. ARCHITECTURAL WOODWORK
INSTITUTE
@ AT
AVG. AVERAGE
B
BM. BEAM
BLKG. BLOCKING
BD. BOARD
BTM. BOTTOM
B.H.M.I. BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION, INC.
BLDG. BUILDING
C
CPT. CARPET
CLG. CEILING
CLG. HT. CEILING HEIGHT
CTR. CENTER
C. TO C. CENTER TO CENTER
CL. CENTERLINE
C.T. CERAMIC TILE
CH. CHANNEL
C.O. CLEANOUT
CLR. CLEAR
CLOS. CLOSET
COL. COLUMN
CO. COMPANY
CONC. CONCRETE
CMU CONCRETE MASONRY UNIT
CONF. CONFERENCE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
C.J. CONTROL JOINT
CORR. CORRIDOR
C.Y. CUBIC YARD
D
DESC. DESCRIPTION
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DISP. DISPENSER
DR. DOOR
DN. DOWN
D.S. DOWNSPOUT
DWG. DRAWING
E
EA. EACH
ELEC. ELECTRICAL OR ELECTRIC
EL. ELEVATION
ENGR. ENGINEER
E.P. EPOXY PAINT
EQ. EQUAL
EQUIP. EQUIPMENT
EXIST. EXISTING
E.J. (EXP. JT.) EXPANSION JOINT
EXP. EXPANSION/EXPOSED
EXP. TO
STRUCT.
EXPOSED TO STRUCTURE
EXT. EXTERIOR
F
FT. FEET
FV. FIELD VERIFY
FIN. FINISH
F.F. FINISHED FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FLR. FLOOR
F.D. FLOOR DRAIN
FLOUR. FLUORESCENT
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
UP
A
B
C
D
E
F
G
H
J
K
L
AD401.
C1
AD401.
B1
249' - 0"
248' - 0"
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
/1
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
D E
M O
L
IT
IO
N
F L O
O R
P L A
N
F A
-1
-D
-0
AD101
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 1/16" = 1'-0"A1
DEMOLITION FLOOR PLAN
PLAN NORTH
8 1
3241216
SCALE: 1/16"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
A3
AD501.
201' - 2"
CONCRETE SLAB TO BE DEMOLISHED
249' - 0" +/-
/4
/4
EXISTING CONRETE HANGAR
SLAB TO REMAIN
EXISTING EXTERIOR CONCRETE
SLAB TO REMAIN
57' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
8"+/- CONCRETE FILL, INCLUDING RAILS,
HEATING ELEMENTS,I-BEAM TIES,
DRAINS, AND GUTTERS TO BE
DEMOLISHED TO FOUNDATION SLAB.
20'-0" WIDE X 28'-0" TALL HANGAR
DOORS TO REMAIN IN PLACE DURING
DEMOLITION, TYP. SEE PHASING PLAN.
37' - 0" RAIL LENGTH37' - 0" RAIL LENGTH
57' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
19' - 0"
239' - 2" RAIL LENGTH
BUMPERS/STOPS
TO BE DEMOLISHED
BUMPERS/STOPS
TO BE DEMOLISHED
EXISTING GUTTER AND DRAIN TO BE
DEMOLISHED, TYP OF 5 LOCATIONS.
FIELD VERIFY LOCATIONS.
31' - 0" 71' - 4"
PORTION OF CONCRETE SLAB TO BE
DEMOLISHED TO ALLOW FOR NEW
HYDRONIC SNOW MELT SYSTEM.
EXISTING EXTERIOR ASPHALT TO REMAIN
PORTION OF ASPHALT & CONCRETE SLAB
TO BE DEMOLISHED
COLUMN TO REMAIN COLUMN TO REMAIN
A1
AD501.
CONCRETE SLAB TO BE DEMOLISHED
248' - 0" +/-
/4
/4
EXISTING CONRETE HANGAR
SLAB TO REMAIN
+/- 201'-0" CLEAR OPENING
EXISTING EXTERIOR
CONCRETE SLAB TO REMAIN
8"+/- CONCRETE FILL, INCLUDING RAILS, HEATING
ELEMENTS, I-BEAM TIES, DRAINS, AND GUTTERS
TO BE DEMOLISHED TO FOUNDATION SLAB.
20'-0" WIDE X 28'-0" TALL HANGAR
DOORS TO REMAIN IN PLACE DURING
DEMOLITION, TYP. SEE PHASING PLAN.
37' - 0" RAIL LENGTH
57' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
239' - 2" RAIL LENGTH
97' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
57' - 0" RAIL LENGTH
37' - 0" RAIL LENGTH
BUMPERS/STOPS
TO BE DEMOLISHED
BUMPERS/STOPS
TO BE DEMOLISHED
EXISTING GUTTER AND DRAIN TO BE
DEMOLISHED, TYP OF 5 LOCATIONS.
FIELD VERIFY LOCATIONS.
16' - 0" 86' - 10"
" PORTION OF CONCRETE SLAB TO BE
DEMOLISHED TO ALLOW FOR NEW
HYDRONIC SNOW MELT SYSTEM.
COLUMN TO REMAINCOLUMN TO REMAIN
1. EXISTING FLOOR DRAIN LOCATIONS ARE TO REMAIN OR BE
REPLACED AS NECESSARY IN NEW WORK.
2. SEE SHEET A-601 FOR WORK PHASING PLAN.
3. ALL EDGES OF DEMOLISHED CONCRETE SHOULD BE SAW
CUT TO LEAVE A CLEAN EDGE.
GENERAL NOTES:
EXISTING TO BE REMOVED.
EXISTING TO REMAIN
EXISTING / DEMOLITION LEGEND
EXISTING RAIL TO BE REMOVED
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
D E
M O
L
IT
IO
N
E N
L A
R G
E D
F L O
O R
P L A
N S
F A
-1
-D
-0
AD401
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 1/8" = 1'-0"
AD101.
C1
DEMOLITION PLAN - NORTH HANGAR DOOR
SCALE: 1/8" = 1'-0"
AD101.
B1
DEMOLITION PLAN - SOUTH HANGAR DOOR
PLAN NORTH
164 8268
SCALE: 1/8"=1'-0"
GRAPHIC SCALE
AREA OF WORK
AREA OF WORK
HANGAR
AREA
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
EXISTING 4" I-BEAM TIES @
3'-0" O.C. TO BE REMOVED
EXISTING 40# ASCE RAILS AND
ASSOCIATED METAL CLIPS TO
BE REMOVED
EXISTING HANGAR DOORS TO
REMAIN IN PLACE DURING
DEMOLITION, SEE PROPOSED
PHASING PLAN ON SHEET A-601.
1/2"4' - 11 3/4" +/-3/4"2' - 6"
10"
EXISTING DOOR HEATING
ELEMENT TO BE REMOVED, TYP
AT EACH RAIL.
EXISTING 8"+/- CONCRETE FILL
TO BE DEMOLISHED DOWN TO
FOUNDATION SLAB
EXISTING CONCRETE HANGAR
SLAB TO REMAIN
EXISTING CONRETE SLAB AND
FOUNDATION TO REMAIN UNDAMAGED.
EXISTING DRAIN LOCATIONS TO
REMAIN. DRAINS AND GUTTERS ABOVE
FOUNDATION TO BE DEMOLISHED.
EXISTING 2 1/4"+/- ASPHALT
OVER 5 1/2"+/- DEEP
CONCRETE SLAB TO REMAIN
UNDERGROUND
CONCRETE TUNNEL
TO REMAIN
DEMOLISH PORTION OF CONCRETE
SLAB TO ALLOW FOR NEW
HYDRONIC SNOW MELT PIPING.
EXPANSION JOINT MATERIAL
TO BE REMOVED.
SAWCUT A CLEAN EDGE TO
REMOVE PORTION OF CONCRETE
SAWCUT EXISTING 2 1/4"+/-
ASPHALT OVER 5 1/2"+/- DEEP
CONCRETE SLAB TO BE
DEMOLISHED TO ALLOW
FORMWORK TO BE PLACED
FOR NEW TRACK CONCRETE
1'-0"
EXISTING 4" I-BEAM TIES @
3'-0" O.C. TO BE REMOVED
EXISTING 40# ASCE RAILS AND
ASSOCIATED METAL CLIPS TO
BE REMOVED
EXISTING HANGAR DOORS TO
REMAIN IN PLACE DURING
DEMOLITION, SEE PROPOSED
PHASING PLAN ON SHEET A-601.
EXISTING DOOR HEATING
ELEMENT TO BE REMOVED, TYP
AT EACH RAIL.
EXISTING 8"+/- CONCRETE
FILL TO BE DEMOLISHED
DOWN TO FOUNDATION SLAB
EXISTING CONCRETE HANGAR
SLAB TO REMAIN
EXPANSION JOINT
MATERIAL TO BE REMOVED,
TYP BOTH SIDES
EXISTING CONRETE SLAB
AND FOUNDATION TO
REMAIN UNDAMAGED.
EXISTING DRAIN LOCATIONS TO
REMAIN. DRAINS AND GUTTERS
ABOVE FOUNDATION TO BE
DEMOLISHED.
EXISTING EXTERIOR 10 1/4"+/-
DEEP CONCRETE SLAB TO
REMAIN
DEMOLISH PORTION OF CONCRETE
SLAB TO ALLOW FOR NEW
HYDRONIC SNOW MELT PIPING.
1/2" 4' - 11 3/4" 3/4" 2' - 6"
SAWCUT A CLEAN EDGE TO
REMOVE PORTION OF CONCRETE
10"
HANGAR
INTERIOR
EXTERIOR EXTERIOR
EXISTING TO BE REMOVED.
EXISTING TO REMAIN
EXISTING / DEMOLITION LEGEND
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
D E
M O
L
IT
IO
N
D E
T A
IL
S
F A
-1
-D
-0
AD501
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 3/4" = 1'-0"
AD401.
A3
DEMOLITION SECTION - NORTH HANGAR DOOR
SCALE: 3/4" = 1'-0"
AD401.
A1
DEMOLITION SECTION - SOUTH HANGAR DOOR
SCALE: 3/4"=1'-0"
12 2
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
UP
A
B
C
D
E
F
G
H
J
K
L
A-401.
D1
A-401.
B1
248' - 0"
248' - 0"
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
/1
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
F
IR
S T
F L O
O R
P L A
N
F A
-1
-D
-0
A-101
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 1/16" = 1'-0"A1
FIRST FLOOR PLAN
PLAN NORTH
8 1
3241216
SCALE: 1/16"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
A3 A-501.
A-501.
B5
248' - 0" +/-
57' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
49' - 0" RAIL LENGTH
59' - 0" RAIL LENGTH
79' - 0" RAIL LENGTH
99' - 0" RAIL LENGTH
239' - 2" RAIL LENGTH
47' - 0" RAIL LENGTH
NEW 8" CONCRETE SLAB WITH EPOXY
FLOOR COATING, STEEL RAILS, TIES,
ANCHORS, DRAINS, AND GUTTERS
EXISTING CONCRETE
HANGAR SLAB TO REMAIN
EXISTING EXTERIOR
CONCRETE SLAB OVER
CONCRETE TUNNEL TO REMAIN
NEW 10'-0" ADDITIONAL RAIL LENGTH ADDED
TO INNER MOST RAIL TO ALLOW FOR FULL
DOOR MOVEMENT DURING PHASED
CONSTRUCTION, TYPICAL OF BOTH SIDES.
EXISTING EXTERIOR ASPHALT
OVER EXISTING CONCRETE
SLAB TO REMAIN
NEW GUTTER WITH COVER AND
DRAIN, TYP OF 5 LOCATIONS.
FIELD VERIFY LOCATIONS SIMILAR
TO EXISTING.
NEW 12" CONCRETE SLAB WITH NEW SNOW
MELT PIPING. NEW EPOXY FLOOR COATING
TO MATCH EXISTING.
NEW SNOW MELT VALVE PIT WITH (3) PIECE
STEEL COVER. CUT HAND HOLDS FOR ACCESS.
NEW BUMPERS/DOOR
STOPS AT EACH RAIL.
SAME LOCATION AS
EXISTING.
NEW BUMPERS/DOOR
STOPS AT EACH RAIL.
SAME LOCATION AS
EXISTING.
31' - 0" 71' - 4"
D1 A-501.
NEW ASPHALT OVER NEW
CONCRETE SLAB
8"
2'-0"
8"
FURNISH AND INSTALL FULL HEIGHT CONSTRUCTION CONTAINMENT TARP
(EAGLE INDUSTRIES FR CONSTRUCTION TARP OR GOVERNMENT
APPROVED EQUAL) BETWEEN AREA OF CONSTRUCTION AND WORKING
HANGAR PER MANUFACTURER'S SPECIFICATIONS.
EXISTING HANGAR
DOOR, TYP
CJCJ
A-501.
B5
Sim
248' - 0" +/-
239' - 2" RAIL LENGTH
57' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
77' - 0" RAIL LENGTH
97' - 0" RAIL LENGTH
47' - 0" RAIL LENGTH 47' - 0" RAIL LENGTH
57' - 0" RAIL LENGTH
NEW 8" CONCRETE SLAB WITH
EPOXY FLOOR COATING,
STEEL RAILS, TIES, ANCHORS,
DRAINS, AND GUTTERS
EXISTING CONCRETE
HANGAR SLAB TO REMAIN
EXISTING EXTERIOR
CONCRETE SLAB TO REMAIN
/4
/4
NEW 10'-0" ADDITIONAL RAIL LENGTH ADDED TO
INNER MOST RAIL TO ALLOW FOR FULL DOOR
MOVEMENT DURING PHASED CONSTRUCTION,
TYPICAL OF BOTH SIDES.
NEW GUTTER WITH COVER AND
DRAIN, TYP OF 5 LOCATIONS.
FIELD VERIFY LOCATIONS
SIMILAR TO EXISTING.
A1 A-501.
NEW 12" CONCRETE SLAB WITH NEW
SNOW MELT PIPING. NEW EPOXY
FLOOR COATING TO MATCH EXISTING.
NEW SNOW MELT VALVE PIT WITH (3)
PIECE STEEL COVER. CUT HAND HOLDS
FOR ACCESS.
NEW BUMPERS/DOOR
STOPS AT EACH RAIL.
SAME LOCATION AS
EXISTING.
NEW BUMPERS/DOOR
STOPS AT EACH RAIL.
SAME LOCATION AS
EXISTING.
16' - 0" 86' - 10"
D1 A-501.
8" 2'-0"
8"
FURNISH AND INSTALL FULL HEIGHT CONSTRUCTION CONTAINMENT TARP
(EAGLE INDUSTRIES FR CONSTRUCTION TARP OR GOVERNMENT
APPROVED EQUAL) BETWEEN AREA OF CONSTRUCTION AND WORKING
HANGAR PER MANUFACTURER'S SPECIFICATIONS.
EXISTING
HANGAR DOOR
TYP.
CJCJCJ
1. EXISTING FLOOR DRAIN LOCATIONS ARE TO REMAIN. NEW
DRAINS ARE TO BE INSTALLED.
2. CONTRACTOR SHALL VERIFY THE EXACT LAYOUT AND
DIMENSIONS OF EXISTING PAVEMENT MARKINGS BEFORE ANY
PAVEMENT IS DEMOLISHED. ANY FLOOR MARKINGS THAT ARE
DEMOLISHED ALONG WITH THE CONCRETE SLAB NEED TO BE
RE-ESTABLISHED ON THE NEW CONCRETE AND EPOXY FLOOR.
3. FOR EACH DOOR, THE CONSTRUCTION CONTAINMENT TARP
SHOULD BE FURNISHED AND INSTALLED BEFORE ANY
DEMOLITION WORK BEGINS AND REMAIN IN PLACE UNTIL
CONSTRUCTION IS COMPLETE.
GENERAL NOTES:
NEW WORK
EXISTING TO REMAIN
EXISTING / NEW WORK LEGEND
NEW CONCRETE
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
E N
L A
R G
E D
F L O
O R
P L A
N S
F A
-1
-D
-0
A-401
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 1/8" = 1'-0"
A-101.
D1
NEW WORK PLAN - NORTH HANGAR DOOR
SCALE: 1/8" = 1'-0"
A-101.
B1
NEW WORK PLAN - SOUTH HANGAR DOOR
PLAN NORTH
164 8268
SCALE: 1/8"=1'-0"
GRAPHIC SCALE
AREA OF WORK
AREA OF WORK
HANGAR
AREA
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
A-501.
D5
NEW 1/2" FLEXIBLE EXPANSION JOINT
FILLER BOARD WITH SEALANT
EXISTING HANGAR DOORS
TO REMAIN IN PLACE DURING
CONSTRUCTION, SEE
PHASING PLAN.
EXISTING HANGAR
CONCRETE SLAB
EXISTING EXTERIOR
ASPHALT OVER
CONCRETE SLAB
NEW L3x3x1/4 STEEL ANGLE TIES
@ 3'-0" O.C. MAX. SHORTEN TIES
WHERE RAILS ARE OMITTED.
END OF TIES SHOULD EXTEND
6" PAST CL OF OUTSIDE RAILS.
EXISTING CONRETE SLAB
AND FOUNDATION
NEW DRAIN AND GUTTER CONNECTED
TO EXISTING DRAIN SYSTEM LOCATIONS.
NEW 12" CONCRETE SLAB
WITH (3) #5 CONT. NEW
EPOXY FLOOR COATING TO
MATCH EXISTING.
NEW 2 1/4" DEEP
ASHPALT OVER 5 1/2"
DEEP CONCRETE SLAB
TO MATCH EXISTING
NEW 1/2" FLEXIBLE
EXPANSION JOINT FILLER
BOARD WITH SEALANT
NEW 1/2" FLEXIBLE
JOINT SEALANT
WITH BACKER ROD
NEW HYDRONIC SNOW
MELT SYSTEM PIPING,
SEE MECHANICAL
ROUTE HYDRONIC PIPING FROM VALVE
PIT BEYOND INTO HANGAR DOOR RAIL
SYSTEM AS SHOWN.
1/2" 4'-11 3/4" 1/2" 1'-0"
8" 10 1/2" 10 1/2" 10 1/2" 10 1/2" 9 3/4"
EXTERIOR
3 1/2"1/2"6"1/2"
2"
/2
/4
6"
NEW CONCRETE FILL
NEW L3x3x1/4 STEEL ANGLE TIES
@ 3'-0" O.C. MAX. SHORTEN TIES
WHERE RAILS ARE OMITTED. END
OF TIES SHOULD EXTEND 6" PAST
CL OF OUTSIDE RAILS.
NEW 40# ASCE RAIL
NEW HYDRONIC SNOW MELT
SYSTEM PIPE TYP, SEE
MECHANICAL
EXISTING CONCRETE SLAB
AND FOUNDATION
NEW 3/4" DIA. X 10" LONG ANCHOR ROD AND
LEVELING NUTS FOR NEW ANGLE TIES. DRILL &
EPOXY BOLTS INTO EXISTING CONCRETE. 1 PER
EACH SIDE OF EACH RAIL, ADJUST LOCATION PER
DRAINS AND RAILS.
DRILL & EPOXY 4" INTO
EXISTING CONCRETE
FOUNDATION, TYP.
NEW WORK
EXISTING TO REMAIN
EXISTING / NEW WORK LEGEND
NEW CONCRETE
NEW 1/2" FLEXIBLE EXPANSION
JOINT FILLER BOARD WITH
SEALANT
EXISTING INTERIOR HANGAR
CONCRETE SLAB
EXISTING CONCRETE
FOUNDATION BELOW
NEW L3x3x1/4 STEEL ANGLE TIES
@ 3'-0" O.C. MAX. SHORTEN TIES
WHERE RAILS ARE OMITTED. END
OF TIES SHOULD EXTEND 6" PAST
CL OF OUTSIDE RAILS.
NEW 40# ASCE RAIL, TYP
/4
A3 A-501.
Sim
NEW 1/2" FLEXIBLE EXPANSION
JOINT FILLER BOARD WITH
SEALANT
NEW ASPHALT OVER CONCRETE
SLAB TO MATCH EXISTING
EXISTING ASPHALT
NEW 3/4" DIA. X 10" LONG ANCHOR
ROD AND LEVELING NUTS FOR
NEW ANGLE TIES. DRILL & EPOXY
BOLTS INTO EXISTING CONCRETE.
1 PER EACH SIDE OF EACH RAIL,
ADJUST LOCATION PER DRAINS
AND RAILS.
/2
/2
/2
/2
/4
3'-0" O.C. TYP
NEW 1/2" FLEXIBLE
EXPANSION JOINT FILLER
BOARD WITH SEALANT
NEW 1/2" FLEXIBLE EXPANSION JOINT
FILLER BOARD WITH SEALANT
EXISTING HANGAR DOORS
TO REMAIN IN PLACE DURING
CONSTRUCTION, SEE
PHASING PLAN.
EXISTING HANGAR
CONCRETE SLAB
EXISTING EXTERIOR
CONCRETE SLAB
NEW L3x3x1/4 STEEL ANGLE TIES
@ 3'-0" O.C. MAX. SHORTEN TIES
WHERE RAILS ARE OMITTED.
END OF TIES SHOULD EXTEND 6"
PAST CL OF OUTSIDE RAILS.
EXISTING CONRETE SLAB
AND FOUNDATION
NEW DRAIN AND GUTTER CONNECTED TO
EXISTING DRAIN SYSTEM LOCATIONS
A-501.
D5
Sim 1/2" 4' - 11 3/4" +/-
9 3/4" 10 1/2" 10 1/2" 10 1/2" 10 1/2" 8"
NEW 12" CONCRETE SLAB
WITH (3) #5 CONT. NEW
EPOXY FLOOR COATING TO
MATCH EXISTING.
NEW 1/2" FLEXIBLE JOINT
SEALANT WITH BACKER ROD
HANGAR
INTERIOR
EXTERIOR
NEW HYDRONIC SNOW
MELT SYSTEM PIPING,
SEE MECHANICAL
ROUTE HYDRONIC PIPING FROM VALVE
PIT BEYOND INTO HANGAR DOOR RAIL
SYSTEM AS SHOWN.
"8
(3) NEW 2'-2" X 2'-2" X 3/4" GALV. STEEL
DIAMOND PLATE VALVE PIT COVER
CONCRETE PIT WITH
#5 @ 12" 0.C. E.W.
NEW 12" CONCRETE SLAB WITH (3) #5
CONT. NEW EPOXY FLOOR COATING
TO MATCH EXISTING.
1/2" FLEXIBLE EXPANSION
MATERIAL W/ JOINT
SEALANT (TYP. OF 4 SIDES)
L1-1/2X1-1/2X1/4 GALV. STEEL ANGLE W/
1/2" DIA. X 3" HEADED STUD @ 12" O.C.
ON FOUR SIDES OF PIT
8" 2'-0" 8"
3'-4"
NEW 12" CONCRETE SLAB WITH #5 @
12" O.C. EACH WAY. NEW EPOXY
FLOOR COATING TO MATCH EXISTING.
NEW SNOW MELT VALVE PIT, 2'-0" WIDE
BY 6'-5" LONG
HYDRONIC SNOW MELT SYSTEM
PIPING BEYOND, SEE MECHANICAL
HYDRONIC SNOW MELT SYSTEM
PIPING, SEE MECHANICAL
NEOPRENE BUMPER
STEEL DOOR BUMPER BRACKET
WELDED TO NEW RAIL. MATCH
EXISTING SIZE AND STYLE
NEW HANGAR DOOR RAIL
NEW CONCRETE SLAB
NEW L3x3x1/4 STEEL ANGLE TIES @ 3'-0"
O.C. MAX. SHORTEN TIES WHERE RAILS
ARE OMITTED. END OF TIES SHOULD
EXTEND 6" PAST CL OF OUTSIDE RAILS.
NEW 3/4" DIA. X 10" LONG ANCHOR ROD AND
LEVELING NUTS FOR NEW ANGLE TIES. DRILL
& EPOXY BOLTS INTO EXISTING CONCRETE. 1
PER EACH SIDE OF EACH RAIL, ADJUST
LOCATION PER DRAINS AND RAILS.
/2
DRILL & EPOXY 4" INTO EXISTING CONCRETE
FOUNDATION, TYP.
EXISTING CONCRETE SLAB
AND FOUNDATION
1/8"
SAWCUT & FILL
WITH SEALANT
SLAB
REINFORCEMENT
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
D E
T A
IL
S
F A
-1
-D
-0
A-501
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 3/4"=1'-0"
12 2
GRAPHIC SCALES
SCALE: 3/4" = 1'-0"
A-401.
A3
NEW SECTION - NORTH HANGAR DOOR
SCALE: 3" = 1'-0"
A-501.
D5
ENLARGED RAIL DETAIL
6"6"
SCALE: 3"=1'-0"
04 2
SCALE: 3/4" = 1'-0"
A-401.
B5
PLAN DETAIL
SCALE: 3/4" = 1'-0"
A-401.
A1
NEW SECTION - SOUTH HANGAR DOOR
SCALE: 3/4" = 1'-0"
A-401.
D1
SNOW MELT VALVE PIT
SCALE: 3/4" = 1'-0"D2
DOOR BUMPER DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SCALE: 1 1/2" = 1'-0"A5
CONTROL JOINT DETAIL
11' - 0"
30' - 0"
AREA OF CONCRETE AND RAILS TO BE DEMOLISHED & REPLACED IN PHASE 1
179' - 2"
LINE OF DEMOLITION FOR PHASE 1 LINE OF DEMOLITION FOR PHASE 1
201' - 2"
30' - 0"
11' - 0"
OPEN DOORS AS FAR AS POSSIBLE TO ALLOW FOR DEMOLITION OPEN DOORS AS FAR AS POSSIBLE TO ALLOW FOR DEMOLITION
EXISTING CONRETE HANGAR
SLAB TO REMAIN
PORTION OF CONCRETE SLAB TO BE DEMOLISHED
FOR NEW SNOW MELT SYSTEM. SNOW MELT
SYSTEM AND VALVE PIT TO BE INSTALLED IN
PHASE 1.
FURNISH AND INSTALL FULL HEIGHT CONSTRUCTION CONTAINMENT TARP
(EAGLE INDUSTRIES FR CONSTRUCTION TARP OR GOVERNMENT APPROVED
EQUAL) BETWEEN AREA OF CONSTRUCTION AND WORKING HANGAR PER
MANUFACTURER'S SPECIFICATIONS.
11' - 0"
AREA TO BE DEMOLISHED & REPLACED IN PHASE 2
34' - 5"
AREA OF NEW CONCRETE AND RAILS COMPLETED IN PHASE 1
179' - 2"
AREA TO BE DEMOLISHED & REPLACED IN PHASE 2
34' - 5"
REMOVE DOOR STOP ABOVE TO ALLOW DOOR
TO BE ROLLED COMPLETELY CLEAR OF AREA
TO BE DEMOLISHED IN PHASE 2
REMOVE DOOR STOP ABOVE TO ALLOW DOOR
TO BE ROLLED COMPLETELY CLEAR OF AREA
TO BE DEMOLISHED IN PHASE 2.
11' - 0"
EXISTING CONRETE HANGAR
SLAB TO REMAIN
201' - 2"
SNOW MELT SYSTEM AND VALVE PIT
CONSTRUCTED IN PHASE 1.
FULL HEIGHT CONSTRUCTION CONTAINMENT TARP (EAGLE
INDUSTRIES FR CONSTRUCTION TARP OR GOVERNMENT
APPROVED EQUAL) INSTALLED IN PHASE 1.
A4 A-601.
A4 A-601.
EXISTING TO BE REMOVED.
EXISTING TO REMAIN
EXISTING / DEMOLITION LEGEND
EXISTING RAIL TO BE REMOVED
GENERAL NOTES:
1. PROPOSED PHASING PLANS SHOWN ARE TYPICAL FOR BOTH THE NORTH
AND THE SOUTH DOORS.
2. DEMOLISH AND COMPLETE NEW WORK FOR ONE DOOR BEFORE BEGINING
ANY DEMOLITION OR NEW WORK ON THE SECOND DOOR.
3. FOR EACH DOOR, THE CONSTRUCTION CONTAINMENT TARP SHOULD BE
FURNISHED AND INSTALLED BEFORE ANY DEMOLITION WORK BEGINS AND
REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE.
NEW CONCRETE PLACED
IN PHASE 2
NEW CONCRETE
PLACED IN PHASE 1
NEW HANGAR DOOR RAIL
BEYOND
EXISTING CONCRETE
TO REMAIN
JOINT SEALANT APPLIED
AT THE COLD JOINTS
BETWEEN PHASE 1 & 2
1. MOVE ALL DOORS TOWARDS THE CENTER OF OPENING TO PROVIDE ACCESS TO THE
DOOR POCKET AREA. THE DOOR ON THE 37 FT RAIL (THE POCKET DOOR) NEEDS TO BE
MANEUVERED 10 FT FROM THE DOOR JAMB GIVING ACCESS TO THE DOOR POCKET
FROM THE OUTSIDE. THE DOOR POCKET RAIL LENGTH SHOULD BE 30 FT IN LENGTH
WHICH WILL EXTEND 10 FT BEYOND THE DOOR JAMB. THIS CAN BE ACCOMPLISHED BY
REMOVING THE DOOR STOP ON THE TOP GUIDE BEAM AND ROLLING THE BOTTOM
ROLLER ON THE CONCRETE BEYOND THE END OF THE RAIL LEAVING THE TRAILING
BOTTOM ROLLER ON THE RAIL AND TOP GUIDE ROLLER IN THE TOP TRACK. SECURE THE
DOOR ONCE IN THE TEMPORARILY STOWED POSITION UNTIL THE NEW POCKET RAIL AND
CONCRETE IS COMPLETE.
2. REPLACE DOOR RAILS, INSTALL NEW RAIL HEATING SYSTEM, PLACE CONCRETE RAIL
FOUNDATION, ETC.
3. UPON COMPLETION AND PROPER CURING OF CONCRETE OF STEP 2, MOVE THE DOORS
BACK IN THE DOOR POCKETS TO REPLACE THE REMAINING BOTTOM RAIL, CONCRETE,
AND BUMPERS.
4. TO EXPEDITE THE CONSTRUCTION PROCESS, THE CONTRACTOR SHALL PROVIDE TYPE III
CONCRETE WITH HIGH EARLY STRENGTH AT 7-DAYS AS SPECIFIED IN SPECIFICATION 03
30 00. IT IS ASSUMED THAT THE RAILS MAY BE LOADED AT 1O DAYS, BUT FIELD
CONDITIONS MAY VARY THIS PERIOD. CONTRACTOR SHALL CONFIRM STABILITY AND
CAPACITY OF RAIL SYSTEM PRIOR TO LOADING AND ADJUST CONSTRUCTION SCHEDULE
ACCORDINGLY.
5. CONTRACTOR SHALL PROVIDE A PHASING PLAN AND SCHEDULE FOR GOVERNMENT
APPROVAL PRIOR TO START OF CONSTRUCTION.
PHASING NOTES:
No. 25088
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E
RC
H
R I
S T O P H E R J.
H I N
S O
N
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
N
E B
B
E B
B
C J H
M
B L D
G
A R
C H
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
P H
A S
IN
G
P L A
N
F A
-1
-D
-0
A-601
J A
N U
A R
Y
Q J K
L
-0
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
SCALE: 1/8" = 1'-0"D1
PHASE 1 PLAN - TYPICAL DOOR (NORTH DOOR SHOWN)
SCALE: 1/8" = 1'-0"C1
PHASE 2 PLAN - TYPICAL DOOR (NORTH DOOR SHOWN)
PLAN NORTH
164 8268
SCALE: 1/8"=1'-0"
GRAPHIC SCALE
AREA OF WORK
AREA OF WORK
HANGAR
AREA
SCALE: 1" = 1'-0"
A-601.
A4
CONCRETE PHASING SECTION DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
LEGEND
TO BE REMOVED/DEMOLISHED
PIPE TURNING DOWN
PIPE TURNING UP
GATE VALVE
CHECK VALVE
THREE-WAY VALVE
DIRECTION OF FLOW
DIRECTION OF AIRFLOW
POINT OF CONNECTION
BETWEEN NEW AND EXISTING
POINT OF DISCONNECTION BETWEEN EXISTING
TO REMAIN AND EXISTING TO BE REMOVED
1-HOUR FIRE RATED WALL
2-HOUR FIRE RATED WALL
OUTSIDE AIR TEMPERATURE SENSOR
EXHAUST FAN
UNIT HEATER
EXHAUST AIR
OAT
EF
UH
EA
BOILERB
ENERGY MANAGEMENT AND CONTROL SYSTEMEMCS
TEMPERATURE SENSOR
PUMP START/STOP
T
P S
SUPERVISORY BUILDING CONTROLLERSBC
HOT WATER SUPPLYHWS
HOT WATER RETURNHWR
DIFFERENTIAL PRESSUREDP
NATURAL GASNG
DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT TO
BE SCALED FOR DIMENSIONS, UNLESS DIMENSIONED.
COORDINATE LOCATION OF MECHANICAL WORK WITH OTHER
TRADES TO AVOID CONFLICTS AND INTERFERENCES.
ALL EQUIPMENT AND PIPE SHALL BE INSTALLED ABOVE
CEILING STRUCTURE, UNLESS OTHERWISE NOTED.
GENERAL NEW WORK NOTES:
1.
2.
3.
REMOVAL OF EQUIPMENT. IS TO INCLUDE ALL ASSOCIATED
HANGERS, SUPPORTS, BRACKETS, CONTROLS,
EQUIPMENT FOUNDATION/MOUNTING PADS AND
APPURTENANCES PHYSICALLY ATTACHED AT THE
COMMENCEMENT OF DEMOLITION, UNLESS NOTED
OTHERWISE.
CONCEALED/BURIED PIPING MAY BE ABANDONED IN PLACE
SO LONG AS IT DOES NOT INTERFERE WITH NEW WORK,
UNLESS NOTED OTHERWISE.
ALL EQUIPMENT REMOVED, NOT INDICATED TO BE REUSED
SHALL BECOME THE PROPERTY OF THE CONTRACTOR,
UNLESS NOTED OTHERWISE, AND SHALL BE
TRANSPORTED BY THE CONTRACTOR OFF SITE.
WHERE EQUIPMENT OR PIPING IS REMOVED AND NOT
REPLACED, PATCH AND FINISH AREAS TO MATCH
ADJACENT SURFACES.
SEE ENLARGED PLANS FOR EQUIPMENT REMOVAL.
GENERAL DEMOLITION NOTES
1.
2.
3.
4.
5.
SEQUENCE OF OPERATION:
BOILER AND SNOW MELT SYSTEM (BOILERS B-1/2, PUMPS P-1,2,3,4) SEQUENCE OF OPERATION:
THE BOILERS AND SNOW MELT SYSTEM SHALL BE IN OPERATION YEAR AROUND AS NEEDED, AND NOT BE SUBJECT TO BASE WIDE HEATING
SHUTDOWN SCHEDULES. ALL SNOW MELT SYSTEM SET POINTS SHALL BE OWNER ADJUSTABLE.
THE SNOW MELT SYSTEM CONTROLS SHALL BE PROVIDED WITH 3 MODES OF OPERATION DEPENDENT UPON READINGS FROM THE OUTDOOR AIR TEMPERATURE SENSOR (OAT) AND A PAVEMENT SNOW AND ICE SENSOR FURNISHED BY THE SNOW MELT CONTROLS CONTRACTOR. THE THREE
MODES OF OPERATION ARE TO BE MELT, IDLE, AND OFF.
MELT MODE: THE SYSTEM SHALL ENTER MELT MODE AS THE PAVEMENT SNOW AND ICE SENSOR DETECTS MOISTURE PRESENT ON THE SLAB AND THE OAT IS DETECTED AT OR BELOW 32°F. IN MELT MODE THE SYSTEM SHALL PROVIDE HOT WATER TO THE SLAB MAINTAINING THE NECESSARY SLAB SURFACE TEMPERATURE FOR SNOW/ICE MELT. AS THE SLAB SURFACE AND CORE TEMPERATURE WILL VARY DEPENDENT UPON AMBIENT CONDITIONS, AND THE PAVEMENT SNOW AND ICE SENSOR DETECTS THE SLAB CORE TEMPERATURE, A SLAB OUTDOOR TEMPERATURE RESET ALGORITHM SHALL BE UTILIZED BY THE SNOW MELT SYSTEM MANUFACTURER. THE RESET SHALL BE A PROPORTIONAL CONTROL THAT MAINTAINS
THE SLAB SURFACE TEMPERATURE.
USER SHALL HAVE THE ABILITY TO SET A TIMED DELAY WHEN TRANSITIONING OUT OF MELT MODE TO ALLOW FOR ADDITIONAL MELTING TIME IN THE
EVENT THAT CERTAIN AREAS OF THE PAD REQUIRE LONGER MELTING TIMES.
IDLE MODE: THE SYSTEM SHALL BE IN IDLE MODE WHEN THE OAT IS BELOW 32°F AND NO MOISTURE IS DETECTED BY THE PAVEMENT SNOW AND ICE SENSOR. THE SLAB TEMPERATURE SHALL BE MAINTAINED AT 30°F VIA THE SLAB OUTDOOR TEMPERATURE RESET ALGORITHM.
OFF MODE: THE SNOW MELT SYSTEM SHALL BE OFF WHEN OUTDOOR AIR TEMPERATURES ARE ABOVE 32°F.
SLAB WARM UP: WHEN TRANSITIONING FROM OFF MODE TO EITHER MELT/IDLE MODES, THE SLAB SHALL ENTER A SLOW WARM UP PROCESS WHERE THE SNOW MELT SYSTEM SUPPLY WATER TEMPERATURES SHALL NOT EXCEED 100°F FOR THE FIRST 2 HOURS.
MANUAL TIMED OVERRIDE: THE OWNER SHALL BE PROVIDED WITH A MANUAL TIMED SYSTEM OVERRIDE LOCATED IN THE MECHANICAL ROOM.
UPON A CALL FOR HEAT FROM THE SNOW MELT SYSTEM THE HOT WATER SYSTEM SHALL BE ENABLED FOR OPERATION. THE LEAD SECONDARY PUMP (P-3) SHALL START AND RUN CONTINUOUSLY. UPON FAILURE OF THE LEAD SECONDARY PUMP, THE SECONDARY LAG PUMP (P-4) SHALL START UNTIL THE FAILURE IS RESOLVED. LEAD OPERATION SHALL SWITCH WEEKLY AS TO EQUALIZE RUNTIME.
THE BOILERS (B-1/2) SHALL OPERATE AND MODULATE ON SELF-CONTAINED CONTROLS AND CONSTANT SPEED PUMP (P-1/2) OPERATION TO MAINTAIN THE HOT WATER SUPPLY TEMPERATURE IN THE SECONDARY LOOP OF 140°F (100°F IN SLOW WARM UP). THE LEAD BOILER (B-1) AND ASSOCIATED PUMP (P-1) SHALL WORK TO MEET THE HEATING REQUIREMENTS OF THE SECONDARY LOOP. UPON FAILURE OF THE LEAD BOILER AND PUMP, THE LAG BOILER (B-2) AND ASSOCIATE PUMP (P-2) SHALL START UNTIL THE FAILURE IS RESOLVED. LEAD OPERATION SHALL SWITCH WEEKLY AS TO
EQUALIZE RUNTIME.
PROVIDE HOT WATER PUMPS (P-1,2,3,4) WITH A HAND-OFF-AUTO SWITCH. IN THE "HAND" POSITION, THE PUMPS SHALL BE CONTROLLED MANUALLY.
PUMPS SHALL BE PROVIDED WITH AN ALTERNATOR TO PROMOTE EVEN WEAR.
B-1
P S
DP
P-1
T
HWR
DP
P-3
P S
HWS
T
DP
P-4
P S
P S
DP
P-2B-2
T
T
BOILER & SNOW
MELT SYSTEM
CONTROL PANEL
TO SBC
TIMED MANUAL OVERRIDE
PAVEMENT SNOW AND ICE SENSOR
OAT
EXISTING
822 SBC
BOILER & SNOW
MELT SYSTEM
CONTROL PANEL
No. 23532
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E R
P A
U
L
C . M A H A F
F
E Y
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
J A
N U
A R
Y
N
J R
C
J R
C
P C
M
Q J K
L
-0
M-001
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
J R
C
M E
C H
A N
IC
A
L L
E G
E N
D G
E N
E R
A L
N O
T E
S D
E T
A
IL
S
S C
H E
D U
L E
S
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
F A
-1
-D
-0
PUMP SCHEDULE
MARK DESCRIPTION TYPE
FLOW
(GPM) HEAD (FT) RPM DRIVES
MOTOR DATA EFFICIENC
Y MANUFACTURER MODELHP VOLTS/PHASE/HZ
P-1 BOILER PRIMARY IN-LINE 50 35 1750 CONSTANT
SPEED
1.5 208/1/60 62% BELL AND
GOSSETT
SERIES E-90
P-2 BOILER PRIMARY IN-LINE 50 35 1750 CONSTANT
SPEED
1.5 208/1/60 62% BELL AND
GOSSETT
SERIES E-90
P-3 SECONDARY IN-LINE 50 91 3500 CONSTANT
SPEED
3.0 208/1/60 59% BELL AND
GOSSETT
SERIES E-90
P-4 SECONDARY IN-LINE 50 91 3500 CONSTANT
SPEED
3.0 208/1/60 59% BELL AND
GOSSETT
SERIES E-90
NATURAL GAS BOILER SCHEDULE
MARK
INPUT
(MBTU)
OUTPUT
(MBTU)
FLOW
(GPM) EFFICIENCY MECH EWT °F MECH LWT °F
TURN
DOWN VOLTS/PHASE/HZ MANUFACTURER MODEL
B-1 850 799 50 94% 110 140 5:1 115/1/60 RAYPAK XYFRE-850A
B-2 850 799 50 94% 110 140 5:1 115/1/60 RAYPAK XYFRE-850A
B-10
SCALE: NOT TO SCALEA1
BOILER SNOW MELT SYSTEM CONTROL DIAGRAM
SCALE: NOT TO SCALEC4
SYSTEM NETWORK DIAGRAM
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
DM.1 DM.1DM.1
DM.1 DM.1 DM.1
No. 23532
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E R
P A
U
L
C . M A H A F
F
E Y
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
/1
J A
N U
A R
Y
N
J R
C
J M
D
P C
M
Q J K
L
-0
MD101
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
J R
C
F
IR
S T
F L
O O
R M
E C
H A
N
IC
A L
D E
M O
L
IT
IO
N
P L A
N
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
F A
-1
-D
-0
SCALE: 1/16" = 1'-0"A1
FIRST FLOOR MECHANICAL DEMOLITION PLAN
PLAN NORTH
DEMOLITION KEYNOTES:
NO. DESCRIPTION
DM.1 REMOVE EXISTING HANGAR DOOR SNOW MELT
SYSTEM AND ALL RELATED DISCONNECTS,
WIRING, CONTROLS AND APPURTENANCES
COMPLETE.
8 1
3241216
SCALE: 1/16"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
M-401 A1
M.4
M.2
M.1
M.1
M.2
M.3M.4
M.5
M.6
M.3
2 1/2" HWR
2 1/2" HWS
2 1/2" HWR
2 1/2" HWS
M.12
M-401 C1
No. 23532
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E R
P A
U
L
C . M A H A F
F
E Y
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
/1
J A
N U
A R
Y
N
J R
C
J M
D
P C
M
Q J K
L
-0
M-101
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
J R
C
F
IR
S T
F L O
O R
M E
C H
A N
IC
A
L N
E W
W O
R K
P L A
N
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
F A
-1
-D
-0
8 1
3241216
SCALE: 1/16"=1'-0"
GRAPHIC SCALE
PLAN NORTH
NEW WORK KEYNOTES:
NO. DESCRIPTION
M.1 FURNISH AND INSTALL SNOW MELT SUPPLY
AND RETURN PIPING ABOVE EXISTING CONDUIT
AND PIPING IN THE HANGAR AND AT A MINIMUM
OF 6’ ABOVE ALL ELECTRICAL PANELS IN THE
HANGAR. PIPING SHALL NOT BE ROUTED IN
DEDICATED ELECTRICAL SPACE ABOVE
ELECTRICAL EQUIPMENT. PIPING ROUTED
DIRECTLY ABOVE THE DEDICATED SPACE
ABOVE ELECTRICAL EQUIPMENT SHALL HAVE
PROTECTIVE EQUIPMENT TO ENSURE LEAKS,
CONDENSATION, AND BREAKS DO NOT DAMAGE
ELECTRICAL EQUIPMENT BELOW. SEE PHOTO
OF HANGAR WALL WITH TYPICAL EXISTING
CONDUIT, PIPES, AND ELECTRICAL PANELS ON
SHEET M-502. APPROXIMATE HEIGHT OF PIPING
RUNS WILL BE 15-20’ ABOVE THE FLOOR. PIPE
ROUTING SHALL NOT INTERFERE WITH OR
ALTER THE EXISTING CONTROLS AND
OPERATIONS OF THE HANGAR.
M.2 PIPING DROPS 1'-0" BELOW FINISH FLOOR AT
THIS LOCATION. PIPE ROUTING SHALL NOT
INTERFERE WITH OR ALTER THE EXISTING
CONTROLS AND OPERATIONS OF THE HANGAR.
M.3 FURNISH AND INSTALL SNOW MELT VALVE PIT.
SEE ARCHITECUTRAL SHEETS FOR VALVE PIT
DETAILS.
M.4 HEADER SPLITS PIPES INTO 10 SUPPLY/RETURN
SNOW MELT LOOPS. SEE SNOW MELT VALVE
PIT DETAIL ON SHEET M-501.
M.5 FURNISH AND INSTALL NEW NATURAL GAS PIPE
TO NEW BOILERS. NATURAL GAS PIPE SHALL
TAP OFF OF THE HIGH PRESSURE NATURAL
GAS PIPE AND BE PROVIDED WITH A NEW
REGULATOR AND METER. REGULATOR AND
METER SHALL BE FURNISHED AND INSTALLED
BY CENTERPOINT ENERGY AT THE
CONTRACTOR'S EXPENSE.
M.6 PIPE SHALL BE ROUTED ABOVE THE EXTERIOR
DOOR AND ASSOCIATED AWNING. NATURAL
GAS PIPE ROUTING SHALL NOT INTERFERE
WITH EXISTING WIRELESS LAN ANTENNAS.
M.12 FURNISH AND INSTALL PAVEMENT SNOW AND
ICE SENSOR AT THIS LOCATION.
SCALE: 1/16" = 1'-0"B1
FIRST FLOOR MECHANICAL NEW WORK PLAN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
M.7
B-1 P-3
P-4
P -1
P -2
1 1/2" NG
/2
N G
3" HWR
3" HWS
BOILER INTAKES
THROUGH WALL
BOILER EXHAUST
UP THROUGH ROOF
3" HWR
3" HWS
/2
H W
R
/2
H W
S
M.8
4' - 6 1/4"
M.9
B-2
M.9
M.10M.10
M.10M.10
M.1
M.1
M.112
/2
H W
R
/2
H W
S
/2
N G
EXISTING ELECTRIC
UNIT HEATER
RELOCATED EMCS
CONTROL PANEL
M.8
FD
M.14
EXISTING EF
TO REMAIN
EXISTING EMCS CONTROL
PANEL TO BE RELOCATED
DM.2
No. 23532
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E R
P A
U
L
C . M A H A F
F
E Y
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
/2
J A
N U
A R
Y
N
J R
C
J M
D
P C
M
Q J K
L
-0
M-401
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
J R
C
B A
S E
M E
N T
M E
C H
A N
IC
A
L E
N L A
R G
E D
P L A
N
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
F A
-1
-D
-0
SCALE: 1/2" = 1'-0"
M-101
A1
BASEMENT MECHANICAL ENLARGED PLAN
NEW WORK KEYNOTES:
NO. DESCRIPTION
M.1 FURNISH AND INSTALL SNOW MELT SUPPLY
AND RETURN PIPING ABOVE EXISTING CONDUIT
AND PIPING IN THE HANGAR AND AT A MINIMUM
OF 6’ ABOVE ALL ELECTRICAL PANELS IN THE
HANGAR. PIPING SHALL NOT BE ROUTED IN
DEDICATED ELECTRICAL SPACE ABOVE
ELECTRICAL EQUIPMENT. PIPING ROUTED
DIRECTLY ABOVE THE DEDICATED SPACE
ABOVE ELECTRICAL EQUIPMENT SHALL HAVE
PROTECTIVE EQUIPMENT TO ENSURE LEAKS,
CONDENSATION, AND BREAKS DO NOT DAMAGE
ELECTRICAL EQUIPMENT BELOW. SEE PHOTO
OF HANGAR WALL WITH TYPICAL EXISTING
CONDUIT, PIPES, AND ELECTRICAL PANELS ON
SHEET M-502. APPROXIMATE HEIGHT OF PIPING
RUNS WILL BE 15-20’ ABOVE THE FLOOR. PIPE
ROUTING SHALL NOT INTERFERE WITH OR
ALTER THE EXISTING CONTROLS AND
OPERATIONS OF THE HANGAR.
M.7 PIPING TO BE ROUTED IN THE FIRST FLOOR
CEILING SPACE.
M.8 BOILER INTAKE AND EXHAUST DUCTS SHALL BE
ROUTED THROUGH THE STAIRWELL IN A
MANNER THAT DOES NOT IMPEDE SAFE
ACCESS INTO AND THROUGH THE STAIRWELL.
M.9 BOILER CONDENSATE SHALL BE NEUTRALIZED
AND ROUTED TO FLOOR DRAIN.
M.10 FURNISH AND INSTALL ISOLATION VALVES IN
HWS/HWR PIPE BRANCHES AS SHOWN.
M.11 PIPING SHALL TRANSITION FROM COPPER TO
PEX AT THIS LOCATION. COPPER SHALL BE
UTILIZED FOR ALL PUMP AND BOILER
CONNECTIONS. PEX PIPING SHALL BE ROUTED
THROUGH THE HANGAR SPACES.
M.14 SEE SHEETS M-501 DETAIL B1 AND M-502
DETAILS B1, A2, C1, C2, C4, & C5 FOR
MECHANICAL ROOM DETAILS.
DEMOLITION KEYNOTES:
NO. DESCRIPTION
DM.2 REMOVE EXISTING WALL MOUNTED LOUVER.
PATCH WITH METAL STUDS AND 5/8" FIRE
RATED GWB TO MAINTAIN A ONE HOUR RATED
ENCLOSURE. PAINT TO MATCH EXISTING.
PLAN NORTH
1 2 42
SCALE: 1/2"=1'-0"
GRAPHIC SCALE
SCALE: 1/2" = 1'-0"C1
BASEMENT MECHANICAL ENLARGED PLAN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
3-WAY VALVE
FOR PURGING
TO/FROM DOOR TRACK SYSTEM
2 1/2” STAINLESS
MANIFOLD HEADER
LINE SIZE CIRCUIT SETTER WITH
DIFFERENTIAL PRESSURE AND
TEMPERATURE PORTS WITH FULL SHUTOFF
VALVE CAPABILITIES. 1-3FT. HD PRESSURE
DROP AT 2.5 FLOW RATE (TYP. OF 10)
2 1/2” PEX (SDR9) TO
STAINLESS MANIFOLD
TO PUMPS
FROM PUMPS
PRESSURE AND
TEMPERATURE
PORTS (TYP. OF 10)
3/4” PEX (SDR9) TYPICAL
FLOOR MOUNTED BLADDER TYPE
EXPANSION TANK (CHARGED AT 25PSI)
SUPPORT TANK AS RECOMMENDED BY
EXPANSION TANK MANUFACTURER. 22
GALLON(ACCEPTANCE VOLUME)
AUTOMATIC
AIR VENT
PRESSURE GAUGE W/
GAUGE COCK (TYP.)
HIGH CAPACITY
TO SNOW MELT
DIRT AND AIR
SEPARATOR (1-3FT. HD
PRESSURE DROP AT
DESIGN FLOW RATE)
FLOOR
1” BLOWDOWN WITH
HOSE BIBB
ISOLATION VALVE
(TYP.)
FROM
SECONDARY
PUMPS
PRECHARGING AIR CONNECTION
RELIEF VENT (SET @ PVR SETTING & 5PSI)
PIPED TO HUB DRAIN
PRESSURE GAUGE WITH GAUGE COCK
(TYP.)
SHUT-OFF
VALVE (TYP.)
PRESSURE REDUCING VALVE W/ CHECK
SET @ 20PSI AT HIGH POINT OF SYSTEM W/
PUMP(S) OFF
UNION (TYP.)
GLOBE VALVE
BACKFLOW
PREVENTER
MECHANICAL MAKEUP WATER
METER, WITH LEAK DETECTION
INDICATOR AND LOW FLOW
REGISTER CAPABILITIES DOWN TO
0.25 GPM WITH MANUAL RESET
1/2” CW MAKEUP WATERLINE TAPS
OFF OF EXISTING WATER MAIN
ROUTED THROUGH MECHANICAL
ROOM.
NOTE: ALL PIPING AND
EQUIPMENT IN THIS DETAIL
SHALL BE LOCATED IN THE
MECHANICAL ROOM
TO/FROM SNOW MELT VALVE PIT
3/4” PEX TYP.
U-BEND TYP.
DOOR TRACK
RAILS TYP.
NOTE:
SEE ARCHITECTURAL
A-501 FOR DETAILS
No. 23532
S
OU
TH
CAROL IN
A
R E G I S T E R E D
PR
OFESS I ONA
L E N G
I N E E R
P A
U
L
C . M A H A F
F
E Y
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O J E
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3
E N
G
IN
E E
R
IN
G
A R
C H
IT
E
C T
U R
E C
E M
S P ro je c t N o
M
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/7
/1
A s i n d ic a te d
J A
N U
A R
Y
N
J R
C
W J B
P C
M
Q J K
L
-0
M-501
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
J R
C
M E
C H
A N
I C A
L S
E C
T
IO
N A
N D
D E
T A
IL
S
R E
P A
IR
D
O O
R H
E A
T
IN
G T
R A
C K
B
U
IL
D I N
G
F A
-1
-D
-0
SCALE: NOT TO SCALEC4
SNOW MELT VALVE PIT DETAIL
SCALE: NOT TO SCALEB1
EXPANSION TANK/DIRT AND AIR SEPARATOR DETAIL
SCALE: NOT TO SCALEB4
TYPICAL SNOW MELT RAIL PIPING DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
DECK CLAMP
(4) 1/4" GUSSET PLATES
2"
DIAMETER
STACK
D.
6"
0.75 D.
1.0 D.
45°
2.5 D.
FLASHING COMPATIBLE
WITH ROOF SYSTEM
MIN. 3'-0" OR AS REQUIRED BY
LOCAL CODES
STORM COLLAR
CONTINUOUSLY
WELDED TO STACK
10 GAUGE VENTILATED
ROOF SLEEVE
BOILER VENT. SEE
SPECIFICATIONS.
1/4" x 1-1/2" C.S. BARS, TYP. FOR 4.
INVERT CONE RAIN CAP
NOTE:
CONTRACTOR SHALL
ENSURE THE EXISTING ROOF
BOND/WARRANTY WITH
CARLISLE BUILDING
PRODUCTS IS MAINTAINED
FROM GAS
SERVICE
VENT
LINE
DRIP LEG
GAS COCK
VALVE LEAK TEST
CONNECTION
SAFETY SHUTOFF
VALVE
GAS PRESSURE
REGULATOR
PILOT SAFETY