RFI__1.docx
DOCX document 13 KB Posted
- Solicitation number
- FA5240-15-Q-M039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI__4.pdf | ||
| RFI__3.docx | DOCX document | |
| RFI__2.docx | DOCX document | |
| Updated_Answers.docx | DOCX document | |
| Site_Visit_Minutes_9-2-2015.docx | DOCX document | |
| Q A.docx | DOCX document | |
| CONNEX_REFAB.pptx | PPTX presentation | |
| Statement_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1C2MX5176A001 Corrosion Control Water Blaster RFI #1
1. Is the building existing?
Yes.
2. Can you supply drawings of the building?
There is a site visit on 2 Sept. Site visit minutes will be posted on FBO.
3. What are the minimum inside dimensions?
There is a site visit on 2 Sept. Site visit minutes will be posted on FBO.
4. What is the minimum size doors required to allow entry and exit to the booth?
Water blast booth doors will need to be at least 14.5 feet wide by 13 feet tall on each end of the drive through booth. The dimensions given are the size of the existing facility garage style roll up door openings.