Questions and Answers 003
South Loop Taxiway Mill and Overlay
FA5004-15-B-C002
Q1. The SOW states to provide 6" of topsoil. The Technical Specifications state 4" of topsoil. Please clarify.
A1. Requirement is for 4” of topsoil. Statement of work will be updated to match technical specifications.
Q2. What is the bury depth for the copper wire connecting the ground points?
A2. The bury depth for the #2 AWG bare copper is 30"per NEC 250.53.
Q3. Are the ground rods already installed?
A3. There are grounding rods already installed.
Q4. What type of arrangement is to be left at the paved surface?
A4. The contractor will have to mill around the existing grounding points. Statement of work will be updated.
*Statement of work will be updated and amendment will be uploaded shortly with a new bid opening date to follow