JA-5_T4_Appx_4 _New_Panel.pdf

PDF 480 KB Posted

Attached to
Turbine-Generator #4 Federal contract opportunity
Solicitation number
FA5004-14-R-C008
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment JA-5

View the file

Other files for this federal contract opportunity

Other files attached to Turbine-Generator #4, newest first.
File Type Posted
FA5004-14-R-C008-0005.pdf PDF
JA-19_Question_and_Answer__3.pdf PDF
FA5004-14-R-C008-0004.pdf PDF
FA5004-14-R-C008-0003.pdf PDF
JA-18_Question_and_Answer__2.pdf PDF
FA5004-14-R-C008-0002.pdf PDF
JA-17_Example_LRR.pdf PDF
JA-16_Question_and_Answer__1.pdf PDF
FA5004-14-R-C008-0001.pdf PDF
JA-13_AF_Form_3000.pdf PDF
JA-9_Past_Performance_Worksheet.docx DOCX document
JA-10_Financial_Reference_Sheet.docx DOCX document
JA-1_T4_Specifications.pdf PDF
JA-8_Past_Performance_Questionnaire.docx DOCX document
JA-12_T4_AF_Form_66.pdf PDF
JA-11_Wage_Determination_AK20130001.pdf PDF
JA-15_AF_Form_3065.pdf PDF
JA-14_AF_Form_3064.pdf PDF
JA-4_T4_Appx_3 _Existing_Panel _final.pdf PDF
JA-6_T4_Appx_5 _O M_Manual.pdf PDF
JA-3_T4_Appx_2 _Photos_w_mark-up.pdf PDF
JA-2_T4_Appx_1 _Inspections.pdf PDF
FA5004-14-R-C008.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #4 APPENDIX 4

EIELSON AFB, ALASKA SUGGESTED NEW PANEL FACE

FTQW 15-1001

SUGGESTED NEW

PANEL FACE

APPENDIX 4

MAINTAIN TURBINE-GENERATOR#4

EIELSON AFB, ALASKA

FTQW 15-1001

ATTACHMENT JA-5

NEW PANEL

SOLICITATION FA5004-14-R-C008

CONDENSER

VACUUM

INLET STEAM

PRESSURE

INLET STEAM

TEMPERATURE

EXTRACTION

PRESSURE

100# HEADER

PRESSURE

HOTWELL PUMP

DISCH PRESSURE

BEARING

TEMP

HIGH

OIL

PRESSURE

LOW

OIL

TANK

HIGH LOW

CONDENSTATE

PRESSURE

LOW

COND

LEVEL

HIGH

COND

LEVEL

LOW

VIBRATION

ALERT

VIBRATION

DANGER

STATOR

TEMP

HIGH

VACUUM

LOW

OIL

PURIFIER

TROUBLE

DELAVAL

ACK FLASHER RESET TEST

NORMAL DEFEAT

505 DROP

LOAD

SHARE

ARMED

TG3 LOAD CONTROL

LDSHR ACTIVE IDLE

RATED

EXTRACTION

VALVE

OPEN

STOP

CLOSE

R

G

R

G G

R

G G

RR

HOTWELL

PUMP EAST

PS

START STOP

HOTWELL

PUMP EAST

PS

START STOP

400LB STEAM

FLOW TOTAL

100LB STEAM

FLOW TOTAL

SOUTH

OIL PUMP

NORTH

OIL PUMP

CONDENSER

VACUUM

BENTLY-NEVADA

YOKOGAWA WOODWARD 505

KEYBOARD DRAWER

BENTLY-NEVADA

TURBO SENTRY

STATOR TEMP

CONTROL

OIL

PRESSURE

99.9

H O A H 0 A

Alarm Horn

ALARM

STROBE

Trip Defeat

R

MAINTAIN TURBINE-GENERATOR#4

EIELSON AFB, ALASKA

FTQW 15-1001

ATTACHMENT JA-5

NEW PANEL

SOLICITATION FA5004-14-R-C008

T4_Appx 4, New Panel
New Panel Face

File details come from the government source that posted it. Updated .