JA-2_T4_Appx_1 _Inspections.pdf

PDF 484 KB Posted

Attached to
Turbine-Generator #4 Federal contract opportunity
Solicitation number
FA5004-14-R-C008
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment JA-2

View the file

Other files for this federal contract opportunity

Other files attached to Turbine-Generator #4, newest first.
File Type Posted
FA5004-14-R-C008-0005.pdf PDF
JA-19_Question_and_Answer__3.pdf PDF
FA5004-14-R-C008-0004.pdf PDF
JA-18_Question_and_Answer__2.pdf PDF
FA5004-14-R-C008-0003.pdf PDF
JA-16_Question_and_Answer__1.pdf PDF
FA5004-14-R-C008-0002.pdf PDF
JA-17_Example_LRR.pdf PDF
FA5004-14-R-C008-0001.pdf PDF
JA-15_AF_Form_3065.pdf PDF
JA-14_AF_Form_3064.pdf PDF
JA-4_T4_Appx_3 _Existing_Panel _final.pdf PDF
JA-6_T4_Appx_5 _O M_Manual.pdf PDF
JA-3_T4_Appx_2 _Photos_w_mark-up.pdf PDF
FA5004-14-R-C008.pdf PDF
JA-13_AF_Form_3000.pdf PDF
JA-9_Past_Performance_Worksheet.docx DOCX document
JA-5_T4_Appx_4 _New_Panel.pdf PDF
JA-10_Financial_Reference_Sheet.docx DOCX document
JA-1_T4_Specifications.pdf PDF
JA-8_Past_Performance_Questionnaire.docx DOCX document
JA-12_T4_AF_Form_66.pdf PDF
JA-11_Wage_Determination_AK20130001.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #4 APPENDIX 1

EIELSON AFB, ALASKA TASK INSPECTION LIST

FTQW 15-1001

TASK INSPECTION LIST

APPENDIX 1

MAINTAIN TURBINE-GENERATOR #4

EIELSON AFB, ALASKA

FTQW 15-1001

ATTACHMENT JA-2

INSPECTIONS

SOLICITATION FA5004-14-R-C008

MAINTAIN TURBINE-GENERATOR #4 APPENDIX 1

EIELSON AFB, ALASKA TASK INSPECTION LIST

FTQW 15-1001

TASK INSPECTION LIST

TASK DATE AUTHORIZED PLANT

REP SIGNATURE

AUTHORIZED

CONTRACTOR’S

REP SIGNATURE

Pre-Overhaul Vibration Test Non-Return Valve New Extraction Isolation Valve & Actuator

Inspect Steam Strainer Inspect Atmospheric Relief Valve Blue Check Primary Inlet Valves Blue Check Secondary Valves Hydraulic Cylinders (Primary & Secondary)

Labyrinth Seals Blue Check Primary Nozzle Ring Blue Check Secondary Nozzle Ring Inspect Trip & Throttle Valve Inspect Condensate Pumps Inspect Electric Oil Pumps Inspect Auxiliary Oil Pump Inspect Oil Coolers Cleaned Oil Tank Installed Oil Accumulator Main Condenser Cleaning & Hydrostatic Test

Flushed Cooling Water Lines Flow Meter & Isolation Valve Installed

Hydrotest Retubed Inter and After Condensers

Alternate Cooling Water Lines Generator Leads Cleaned Ground Resistor Generator Air Coolers Upper Diaphragm Alignment Lower Diaphragm Alignment Turbine Rotor Balance Generator Rotor Balance Proximitor Target Areas Centerline Alignment Generator Air Gap Vibration Probes & RTDs Upgraded control Panel Start-Up and Testing Post-Overhaul Vibration Test

MAINTAIN TURBINE-GENERATOR #4

EIELSON AFB, ALASKA

FTQW 15-1001

ATTACHMENT JA-2

INSPECTIONS

SOLICITATION FA5004-14-R-C008

TASK INSPECTION LIST