JA-7 - Appx 6 O M Manual Excerpts final.pdf

PDF 13 MB Posted

Attached to
Maintain Turbine Generator #5 Federal contract opportunity
Solicitation number
FA5004-12-R-C005
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment JA-7 Appendix 6

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Turbine Generator #5, newest first.
File Type Posted
Tg 5 15699 r1 11 Jul.pdf PDF
Bidder Q A July.pdf PDF
FA5004-12-R-C005-0001.pdf PDF
12-R-C005 - Contractor Base Pass Request - 02 July 2012.xlsx XLSX spreadsheet
JA-6 - Appx 5 Structural Dwgs PG 13.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 14.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 12.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 11.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 11.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 12.pdf PDF
JA-12 - Past Performance Worksheet.pdf PDF
JA-11 - Past Performance Questionnaire —
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
JA-13 - Financial Reference Sheet.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-1 - Specs complete 27 Apr.pdf PDF
JA-10 - AF 66.pdf PDF
JA-9 - HAZMAT Sheet.pdf PDF
JA-2 -Appx 1 Inspections.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
JA-8 - Wage Determination.pdf PDF
JA-2 -Appx 1 Inspections.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
JA-1 - Specs complete 27 Apr.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #5 APPENDIX 6

EIELSON AFB, ALASKA O&M MANUAL EXCERPTS

12-1015 FTQW

SELECTED

O&M MANUAL

EXCERPTS

APPENDIX 6

GENERATOR

LIFTING ARRANGEMENT

ROTOR JACKING

TURNING GEAR ASSEMBLY

HYDRAULIC BOX

CONSOLE WIRING DIAGRAM

UNIT WIRING DIAGRAM

CONSOLE OIL TANK

INTERCONNECTING PIPING

LIMITORQUE EXTRACTION

ISOLATION VALVE ACTUATOR

POSI-SEAL EXTRACTION ISOLATION

VALVE

MAIN CONDENSER

AND

AIR EJECTION SYSTEM

T5_Appendix, O&M, Cover Sheet
SELECTED
O&M MANUAL
EXCERPTS
O&M Manual 2012, r1
T5_Appendix, O&M, Cover Sheet
SELECTED
O&M MANUAL
EXCERPTS
O&M Manual 2012
T5_Appendix, O&M Manual Excerpts, final
SELECTED
O&M MANUAL
EXCERPTS
Manual Excerpt Headings 2
img004
img045
img046
img047
img048
img049
img050
img051
img052
img053
img054
img055
img005
img006
img007
img008
img009
img056
img011
img057carl003
img058
img059
img014
img015
img016
img017
img018
img019
img020
img021
img022
img023
img024
img025
img026
img060
img028
img029
img030
img031
img032
img033
img061
img035
img036
img037
img038
img039
img040
img041
img042
img043
img044
img001
img062
img002
img003
Manual Excerpt Headings 3
ASME Forms U-1
Pressure tests

File details come from the government source that posted it. Updated .