JA-2 -Appx 1 Inspections.pdf

PDF 97 KB Posted

Attached to
Maintain Turbine Generator #5 Federal contract opportunity
Solicitation number
FA5004-12-R-C005
Issued by
Department of the Air Force Pacific Air Forces

About this file

ATTACHMENT JA-2 APPENDIX 1

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Turbine Generator #5, newest first.
File Type Posted
Tg 5 15699 r1 11 Jul.pdf PDF
Bidder Q A July.pdf PDF
FA5004-12-R-C005-0001.pdf PDF
12-R-C005 - Contractor Base Pass Request - 02 July 2012.xlsx XLSX spreadsheet
JA-6 - Appx 5 Structural Dwgs PG 14.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 12.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 13.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 11.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 11.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 12.pdf PDF
JA-13 - Financial Reference Sheet.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-12 - Past Performance Worksheet.pdf PDF
JA-11 - Past Performance Questionnaire —
JA-7 - Appx 6 O M Manual Excerpts final.pdf PDF
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
JA-1 - Specs complete 27 Apr.pdf PDF
JA-10 - AF 66.pdf PDF
JA-9 - HAZMAT Sheet.pdf PDF
JA-2 -Appx 1 Inspections.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
JA-8 - Wage Determination.pdf PDF
JA-1 - Specs complete 27 Apr.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #5 ATTACHMENT JA-2

EIELSON AFB, ALASKA APPENDIX 1, TASK INSPECTION LIST

FTQW 12-1015 SOLICITATION FA5004-12-R-C005

TASK INSPECTION LIST

APPENDIX 1

MAINTAIN TURBINE-GENERATOR #5 ATTACHMENT JA-2

EIELSON AFB, ALASKA APPENDIX 1, TASK INSPECTION LIST

FTQW 12-1015 SOLICITATION FA5004-12-R-C005

TASK INSPECTION LIST

TASK DATE

AUTHORIZED

PLANT REP

SIGNATURE

AUTHORIZED

CONTRACTOR’S

REP SIGNATURE

Pre-Overhaul Vibration Test

Installed Floor Shoring

New Non-Return Valve

Inspect Steam Strainer

Inspect Atmospheric Relief Valve

Blue Check Primary Inlet Valves

Blue Check Secondary Valves

Hydraulic Cylinders (Primary &

Secondary)

Labyrinth Seals

Blue Check Primary Nozzle Ring

Blue Check Secondary Nozzle

Ring

Inspect Trip & Throttle Valve

Inspect Condensate Pumps

Inspect Main & Aux Oil Pumps

Inspect Emergency Oil Pump

Inspect Oil Coolers

Main Condenser Cleaning &

Hydrostatic Test

New Cooling Water Meter

New Condenser Exhauster

Installation

Flushed Cooling Water Lines

New Air Ejection System

Generator Leads

Cleaned Current Limiting Reactor and Ground Resistor

Generator Air Coolers

Upper Diaphragm Alignment

Lower Diaphragm Alignment

Turbine Rotor Balance

Generator Rotor Balance

Centerline Alignment

Generator Air Gap

Vibration Probes & RTDs

Start-Up

Post-Overhaul Vibration Test