JA-10 - AF 66.pdf

PDF 51 KB Posted

Attached to
Maintain Turbine Generator #5 Federal contract opportunity
Solicitation number
FA5004-12-R-C005
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment JA-10 AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Turbine Generator #5, newest first.
File Type Posted
Tg 5 15699 r1 11 Jul.pdf PDF
Bidder Q A July.pdf PDF
FA5004-12-R-C005-0001.pdf PDF
12-R-C005 - Contractor Base Pass Request - 02 July 2012.xlsx XLSX spreadsheet
JA-6 - Appx 5 Structural Dwgs PG 14.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 12.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 11.pdf PDF
JA-6 - Appx 5 Structural Dwgs PG 13.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 12.pdf PDF
JA-6 - Appx 5 Structural Dwgs Pt 1 Real_Part 11.pdf PDF
JA-13 - Financial Reference Sheet.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-1 - Specs complete 27 Apr.pdf PDF
JA-9 - HAZMAT Sheet.pdf PDF
JA-2 -Appx 1 Inspections.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
JA-8 - Wage Determination.pdf PDF
JA-7 - Appx 6 O M Manual Excerpts final.pdf PDF
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
JA-12 - Past Performance Worksheet.pdf PDF
JA-11 - Past Performance Questionnaire —
JA-1 - Specs complete 27 Apr.pdf PDF
FA5004-12-R-C005 Turbine 5.pdf PDF
JA-4 - Appx 3 Existing Panels.pdf PDF
JA-3 - Appx 2 Photos w. notes r4.pdf PDF
JA-2 -Appx 1 Inspections.pdf PDF
JA-5 - Appx 4 New Control Panel.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GPO 1987-188-148

PROJECT NUMBER PROJECT TITLE MAINTAIN TURBINE- SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS FTQW 12-1015 GENERATOR #5 FA5004-12-R-C005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

N

E

U

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S

H O

P D

R A

W

IN

G S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

C A

T A

L O

G

D A

T A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

O T

H E

R

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROVED

DIS-

APPROVED

01010-1.6.A. Work Clearnace

Request, AF Form 103

5 days after

NTP

For Information Only

01030-1.6. Construction

Operation & Safety Plan

4 wks prior to work start

01030-1.8. Safety & Health

Program

4 wks prior to work start

01030-1.10, Ionizing Radiation

Permit Request

4 weeks prior to need

For Information Only.

Submit only if applicable

01030-1.11, Laser Permit

Request

4 weeks prior to need

For Information Only.

Submit only if applicable

01030 - 1.12, Radioactive

Material Permit Request

4 weeks prior to need

For Information Only.

Submit only if applicable

01030-1.13, Radio Frequency

Radiation Permit Request

4 weeks prior to need

For Information Only.

Submit only if applicable

01030-1.14, Ultraviolet

Radiation Permit Request

4 weeks prior to need

For Information Only.

Submit only if applicable

01030-1.19, Environmental

Protection Plan

4 wks prior to work start

01030-1.20.A, Initial Hazardous

Material Inventory

4 wks prior to work start

01030-1.20.A, Final Hazardous

Material Inventory

1 wk after completion of on-site work

01030-1.21.C, Hazardous

Waste Accumulation Log

1 wk after final acceptance test

S E

R V

IC

E

S

IZ

E

A

P P

L

IC

A T

IO

N

S C

H E

D U

L E

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

AF Form 66, Sep 86

SCHEDULE OF MATERIAL SUBMITTALS FTQW 12-1015 GENERATOR #5 FA5004-12-R-C005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S

H O

P D

R A

W

IN

G S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

C A

T A

L

T A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

O T

H E

R

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROVED

DIS-

APPROVEDS

E

R V

IC

E

S

IZ

E

A

P P

L

IC

A T

IO

N

S C

H E

D U

L E

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

01030-1.22, TCLP Test Results 4

Prior to disposing

Haz Waste

01400-1.3, Testing Lab

Qualifications

4 wks prior to testing

01400-1.7, Construction

Photographs

Submit w/ each

Progress Report

15699-1.2.A & 3.3, Temporary

Floor Shoring Design

4 wks prior to work start

15699-1.2.B & 3.1, Tech Rep

Qualifications

4 wks prior to work start

15699-1.2.C & 3.2, Governor

Tech Qualifications

4 wks prior to work start

15699-1.2.D. & 3.4.WW, NDI

Test Lab & Worker

Qualifications

7 days after

NTP

15699-1.2.E & 3.5.D, Pre-

Overhaul Vibration Report

5 days after testing

15699-1.2.F & 3.5.H, Non-

Return Valve 4 4 4 4 4

4 wks prior to ordering

15699-1.2.G & 3.5.I, Extraction

Isolation Valve Actuator 4 4 4 4 4

4 wks prior to ordering

15699-1.2.H & 3.5.U, Runout at proximitor targets

24 hrs after measuring

15699-1.2.I & 3.5.DD, Oil Vapor

Control System 4 4

4 wks prior to ordering

SCHEDULE OF MATERIAL SUBMITTALS FTQW 12-1015 GENERATOR #5 FA5004-12-R-C005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S

H O

P D

R A

W

IN

G S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

C A

T A

L

T A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

O T

H E

R

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROVED

DIS-

APPROVEDS

E

R V

IC

E

S

IZ

E

A

P P

L

IC

A T

IO

N

S C

H E

D U

L E

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

15699-1.2.J, 3.5.EE, 3.5.FF &

3.5.GG, Oil Filters

4 wks prior to ordering

15699-1.2.K. & 3.5.HH, Hotwell

Level Controls 4 4 4

4 wks prior to ordering

15699-1.2.L.1 & 3.5.II,

Condenser Cooling Water

Meter (initial)

4 4 4 4 wks prior to ordering

15699-1.2.L.2 & 3.5.II,

Condenser Cooling Water

Meter (final)

4 4 4 2 wks prior to request for final payment

15699-1.2.M.1-3 & 3.5.JJ, Air

Ejection System (initial) 4 4 4 4

4 wks prior to ordering

15699-1.2.M.4-5 & 3.5.JJ, Air

Ejection System (final) 4 4 4 4

2 wks prior to request for final payment

15699-1.2.N.1 & 3.5.KK, Main condenser Exhauster (initial) 4 4 4

4 wks prior to ordering

15699-1.2.N.2 & 3.5.KK, Main

Condenser Exhauster (final) 4 4 4 4

2 wks prior to request for final payment

15699-1.2.O & 3.5.RR, Field

Ground Detection System 4 4 4

4 wks prior to ordering

15699-1.2.P.1 & 3.8, Turbine

Control Panel (initial) 4 4 4

4 wks prior to ordering

15699-1.2.P.2 & 3.8, Turbine

Control Panel (final) 4 4 4 4

2 wks prior to request for final payment

15699-1.2.Q.1 & 3.8.C, EMD

Panel Modifications (initial) 4 4

4 wks prior to ordering

SCHEDULE OF MATERIAL SUBMITTALS FTQW 12-1015 GENERATOR #5 FA5004-12-R-C005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S

H O

P D

R A

W

IN

G S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

C A

T A

L

T A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

O T

H E

R

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROVED

DIS-

APPROVEDS

E

R V

IC

E

S

IZ

E

A

P P

L

IC

A T

IO

N

S C

H E

D U

L E

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

15699-1.2.Q.2 & 3.8.C, EMD

Panel Modifications (final) 4 4 4

2 wks prior to request for final payment

15699-1.2.R & 3.6, Letters of

Recommended Repairs

5 days after inspection

Submit as necessary

15699-1.2.S & 3.7.F, Start-up

Plan

2 wks prior to start-up

15699-1.2.T & 3.10, Post

Overhaul Report

14 days after final acceptance test

15699-1.2.U & 3.5.C, Completed Task Inspection List

2 days after final acceptance test

15699-1.2.V, Proposed

Deviations 4 4 4 4 4 4

When deviations are requested

Submit only if applicable