PM_Schedule_Oct15toJun16.pdf
PDF 139 KB Posted
- Attached to
- Boiler Maintenance Federal contract opportunity
- Solicitation number
- FA5000-16-T-0069
About this file
Preventive Maintenance Schedules
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_May_9_Ver_20.pdf | ||
| Amendment3.pdf | ||
| 2013_Spring_Boiler_Pressure_Vessel_Testing.pdf | ||
| Amendment2.pdf | ||
| Savings_Report_yr_Oct12toSep13.pdf | ||
| WorkOrderData_Oct15toJun16.pdf | ||
| Boiler_Report_FY12.pdf | ||
| Boiler_Report_FY13.pdf | ||
| Boiler_Report_FY14.pdf | ||
| Q A_2.pdf | ||
| Amendment1.docx | DOCX document | |
| Q A_1.pdf | ||
| Combo_Synopsis_Solicitation.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| Boiler_Maint_Elmendorf_PWSv18_May_4_Ver_1_(002).docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PM 10-01-2015 TO 06-08-2016
Scheduled Date Date Completed Status Asset Name Year Summary Facility Notes
2016-02-29 In Progress B1 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler
5385 2016-05-06 09:00:13 Was not completed 2016-02-11 07:35:44 02/10/2016: Arrived on site to complete PM. Found all lights in the room inoperable and the room completely dark. We need to report this to CE and have the lighting resolved before we can perform any maintenance work in this room. 1hr.
2016-02-29 In Progress B2 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler
5385 2016-05-06 09:00:38 Was not completed 2016-02-11 07:35:36 02/10/2016: Arrived on site to complete PM. Found all lights in the room inoperable and the room completely dark. We need to report this to CE and have the lighting resolved before we can perform any maintenance work in this room. 1hr.
2016-01-25 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-02-10 07:52:41 Added 1 bag of salt to system. 1hr 2016-02-02 15:51:16 Not perforamed
2016-02-01 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-02-18 07:29:32 Added one bag of salt to system. 1hr 2016-02-08 14:46:01 Not performed
2015-10-05 Completed 6346 Ph Drip Line Test
2015 6346 Test Drip Line (wed)
6346 2015-12-11 07:41:05 Ph tested 7 2015-10-22 13:28:01 Not performed
2015-10-05 Completed 8559 Ph Drip Line Test
2015 8559 Test Drip Line (wed)
8559 2015-12-11 07:40:58 Ph tested 7 2015-10-22 13:26:32 Not performed
2016-02-12 Completed Lochinvar Direct Fired
2016 6-Month Lochinvar PM 9268 2016-04-05 07:51:21 Completed semi-annual PM.
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-05 2015-10-19 Completed 4109 pH Test Drip Line
2015 4109 Test Drip Line (wed)
4109 2015-10-19 07:07:46 Tested drip line 7ph. 1hr
2016-01-05 2016-01-05 Completed 4109 pH Test Drip Line
2016 4109 Test Drip Line (wed)
4109 2016-01-05 07:07:28 Tested drip line ph7. 1hr
2016-04-04 2016-04-25 Completed 4109 pH Test Drip Line
2016 4109 Test Drip Line (wed)
4109 2016-05-05 07:56:28 Tested the PH level of boilers. PH of 5 acidic. 1hr 2016-04-26 09:57:59 4109: Tested the PH of condensate rocks. PH of 5.
These will need to be replaced.
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
4241 2015-12-30 09:06:53 Completed
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-02 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-02-03 2016-02-09 Completed Lochinvar Storage Tank
2016 6-Month Lochinvar PM (wed)
5126 2016-02-10 15:25:56 Verified there were no leaks; verified operation of thermostat, tested aquastat, tested relief valve, inspected all piping. Completed.
2016-02-09 07:12:35 Performed full PM on this unit. 4hr
2016-02-03 2016-02-09 Completed Lochinvar Storage Tank
2016 6-Month Lochinvar PM (wed)
5126 2016-02-10 15:27:16 Verified there were no leaks; verified operation of thermostat, tested aquastat, tested relief valve, inspected all piping. Completed.
2016-02-09 07:13:37 Performed full PM on this unit. 3hr
2016-05-12 2016-05-12 Completed 5126-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
5126 2016-05-17 09:26:37 Cleaned room.
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-02-03 2016-02-19 Completed B2-Burnham Boiler
2016 Boiler: Perform Annual PM on this boiler
5201 2016-02-19 09:09:50 Completed PM on B1 and B2. 13 hours
2016-02-03 2016-02-19 Completed B1 Burnham Boiler
2016 Boiler: Perform Annual PM on this boiler
5201 2016-02-19 09:09:50 Completed PM on B1 and B2. 13 hours
2016-05-10 2016-05-10 Completed 5201-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
5201 2016-05-24 14:21:53 Completed
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-10 2016-05-10 Completed 5223-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
5223 2016-05-24 14:20:45 Completed
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-05-13 2016-05-13 Completed 5257-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
5257 2016-05-17 09:37:02 Completed inspection
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-26 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-04 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
6104 2015-12-30 09:04:37
NOT NEEDED - HYDRONIC
2015-11-04 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
6136 2015-12-30 08:59:14 Completed
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-05-10 2016-05-10 Completed 6210-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
6210 2016-05-24 14:21:05 Completed
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-12 2015-10-13 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-10-14 07:14:55 Added 1 bag.
2015-10-19 2015-10-20 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-10-22 07:19:53 Added 1 bag of salt
2015-10-26 2015-10-27 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-10-27 16:12:23 Added 1 bag of salt.
2015-11-02 2015-11-06 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-11-06 15:49:53 Did not need salt this time.
2015-11-09 2015-11-10 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-11-12 14:48:27 Completed. No salt Needed.
2015-11-16 2015-11-17 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-11-20 10:08:48 No salt needed.
2015-11-23 2015-11-24 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-11-25 13:38:59 Added 2 bags of salt.
2015-11-30 2015-12-01 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-12-03 10:29:33 Did not need to add salt.
2015-12-07 2015-12-07 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-12-15 12:02:39 Completed
2015-12-14 2015-12-15 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-12-16 10:31:32 Did not need to add salt.
2015-12-21 2015-12-21 Completed 6211 Water Softener
2015 Perform salt check of the system. Add if
6211 2015-12-23 08:02:15 Completed
2015-10-05 2015-10-06 Completed Air Compressor-
2015 Air Compressor - Monthly - Check Air
6211 2015-10-22 13:25:59 Check filter; no need to change.
2015-10-06 2015-10-07 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-10-22 13:28:56 Oil level was good.
2015-10-13 2015-10-14 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-10-19 08:35:47 Oil Level Is Good. No action taken.
2015-10-20 2015-10-21 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-10-22 07:21:15 Checked oil level. Level was good.
2015-10-27 2015-10-27 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-10-28 07:18:03 Oil level was full.
2015-11-02 2015-11-06 Completed Air Compressor-
2015 Air Compressor - Monthly - Check Air
6211 2015-11-06 15:47:48 Filter is clean. Completed.
2015-11-03 2015-11-06 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-11-06 15:48:46 Oil level is full. Completed.
2015-11-10 2015-11-13 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-11-17 07:43:50 Checked oil. Level was good.
2015-11-17 2015-11-18 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-11-20 10:23:14 Checked oil level. Level was good.
2015-11-24 2015-11-25 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-11-25 13:37:48 Checked oil level. Level was full.
2015-12-01 2015-12-02 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-12-03 10:04:03 Checked oil level. Level was full.
2015-12-07 2015-12-07 Completed Air Compressor-
2015 Air Compressor - Monthly - Check Air
6211 2015-12-15 11:51:11 Checked air filter. Filter was clean.
2015-12-08 2015-12-09 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-12-23 08:03:55 Checked oil level. Level was okay.
2015-12-15 2015-12-16 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-12-21 10:39:10 Oil level was okay.
2015-12-22 2015-12-22 Completed Air Compressor-
2015 Weekly - Check Oil Level - Air Compressor
6211 2015-12-23 08:05:02 Completed
2016-01-04 2016-01-04 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-01-06 09:51:24 Level was good. Did not add salt.
2016-01-11 2016-01-11 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-01-15 13:54:15 Checked. Did not need to add salt.
2016-01-18 2016-01-18 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-01-21 10:38:58 Completed. Added 1 bag of salt to the system.
2016-01-25 2016-01-25 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-01-26 14:57:13 Completed
2016-02-01 2016-02-01 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-02-05 09:52:15 Added 1 bag of salt to the system.
2016-02-08 2016-02-08 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-02-10 07:56:47 Added 1 bag if salt
2016-02-15 2016-02-15 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-02-18 07:58:03 Completed. Added one bag of salt to the system.
2016-02-22 2016-02-22 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-02-24 16:15:44 Completed
2016-02-29 2016-02-29 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-03-02 14:26:21 Added 1 bag of salt to the system.
2016-03-07 2016-03-07 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-03-10 08:38:11 Salt level was good. 1.5hrs.
2016-03-14 2016-03-14 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-03-16 08:39:20 Completed. Did not need to add salt.
2016-03-21 2016-03-21 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-03-22 07:01:04 Added 1 bag of salt
2016-03-28 2016-03-29 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-03-29 14:11:43 Added 1 bag of salt
2016-04-04 2016-04-04 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-04-05 07:44:43 Completed
2016-04-11 2016-04-11 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-04-12 13:06:31 Completed. Added 1 bag of salt.
2016-04-18 2016-04-18 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-04-25 11:43:14 Added 1 bag of salt to the system.
2016-04-25 2016-04-25 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if needed.
6211 2016-05-05 13:19:34 Service Client Salt level is good, none was added.
2016-04-25 11:50:30 Completed
2016-05-02 2016-05-02 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-05-05 13:22:34 Service Client Added one bag of salt. Completed.
2016-05-09 2016-05-09 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-05-25 10:29:18 Completed
2016-05-16 2016-05-16 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-05-17 08:30:32 No salt added
2016-05-23 2016-05-23 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-05-24 14:39:23 Completed
2016-05-30 2016-05-31 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-06-07 14:35:40 Completed; added 1 bag of salt to the system.
2016-06-06 2016-06-06 Completed 6211 Water Softener
2016 Perform salt check of the system. Add if
6211 2016-06-09 12:49:17 Added 1 bag of salt.
2016-01-04 2016-01-04 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
6211 2016-01-06 09:52:50 Completed. Air filter was clean.
2016-01-05 2016-01-05 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-01-11 08:26:04 Completed
2016-01-12 2016-01-12 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-01-15 13:53:23 Oil level was full.
2016-01-19 2016-01-19 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-01-22 10:09:14 Oil level was full. Okay.
2016-01-26 2016-02-26 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-02-02 15:46:27 Checked oil level. Did not need to add oil.
2016-02-01 2016-02-10 Completed Air Compressor- New
2016 2-Month - Drain Air Tank - Air Compressor
6211 2016-02-10 08:46:46 Completed PM on Air Compressor. Drained condensate, checked oil level, checked for air leaks, tightened bolts and cleaned the exterior. 2 hours
2016-02-01 2016-02-01 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
6211 2016-02-05 09:53:26 Filter is in good shape.
2016-02-02 2016-02-02 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-02-05 10:00:08 Oil level is good. Completed.
2016-02-09 2016-02-09 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-02-10 15:30:34 Oil level is good.
2016-02-16 2016-02-16 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-02-18 07:59:31 Completed
2016-02-23 2016-02-23 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-02-24 16:15:16 Oil level was OK
2016-03-01 2016-03-01 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-03-02 14:25:14 Oil level was full.
2016-03-07 2016-03-07 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
6211 2016-03-10 08:36:22 Air filter is clean. Completed. 1.5 hrs.
2016-03-08 2016-03-08 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-03-10 08:41:18 Oil level was good. 1.5hrs.
2016-03-15 2016-03-15 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-03-21 07:39:05 Oil level was good.
2016-03-22 2016-03-22 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-03-23 13:53:36 Oil level was full.
2016-03-29 2016-03-29 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-04-01 08:59:50 Oil Level was good.
2016-04-01 2016-04-01 Completed Air Compressor-
2016 2-Month - Drain Air Tank - Air Compressor
6211 2016-04-04 15:00:10 Drained tank - Completed
2016-04-04 2016-04-04 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
2016-04-05 2016-04-05 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-04-05 09:06:35 Completed
2016-04-12 2016-04-12 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-04-12 13:07:46 Completed. Oil level was good.
2016-04-19 2016-04-19 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-04-25 11:44:59 Completed
2016-04-26 2016-04-26 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-05-05 13:20:24 Service Client Oil level is full. Completed.
2016-05-02 2016-05-02 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
6211 2016-05-05 13:24:36 Service Client Air filter is good. Completed.
2016-05-03 2016-05-03 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-05-05 13:16:21 Service Client Oil level is full. Completed.
2016-05-10 2016-05-10 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-05-17 07:41:49 Completed; oil level was good.
2016-05-17 2016-05-17 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-05-18 13:47:21 Checked and oil level was okay.
2016-05-24 2016-05-24 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-05-24 14:31:15 Oil Level was okay.
2016-05-31 2016-05-31 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-06-07 14:32:24 Completed. Oil level was full.
2016-06-01 2016-06-01 Completed Air Compressor-
2016 2-Month - Drain Air Tank - Air Compressor
6211 2016-06-07 14:41:31 Drained tank for 45 minutes.
2016-06-06 2016-06-06 Completed Air Compressor-
2016 Air Compressor - Monthly - Check Air
6211 2016-06-09 12:47:39 Air filter is good.
2016-06-07 2016-06-07 Completed Air Compressor-
2016 Weekly - Check Oil Level - Air Compressor
6211 2016-06-09 12:53:03 Oil level was good.
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-05-24 2016-05-24 Completed 6230-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
6230 2016-05-25 10:17:31 Completed
2015-11-04 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-04 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-05 2015-10-07 Completed 6253 Water Softener
2015 Perform salt check of the system. Add if
6253 2015-10-07 08:45:06 Added bag of salt to system. 1hr
2015-12-07 2015-12-11 Completed 6253 Water Softener
2015 Perform salt check of the system. Add if
6253 2015-12-11 07:37:30 Added two bags of salt to system. 1hr
2015-12-14 2015-12-14 Completed 6253 Water Softener
2015 Perform salt check of the system. Add if
6253 2015-12-14 06:57:21 No salt needed at this time 1hr
2016-01-04 2016-01-06 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-01-06 13:02:29 Added 1 bag of salt to system 1hr 2016-01-06 13:02:26 No salt needed at this time. 1hr
2016-01-11 2016-01-11 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-01-15 13:56:01 Completed.
2016-01-18 2016-01-18 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-02-10 07:53:48 No salt needed at this time. 1hr 2016-01-21 09:53:55
2016-02-08 2016-02-09 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-02-09 07:10:47 Added one bag of salt to system. 1hr
2016-02-15 2016-02-15 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-03-02 14:13:30 No salt needed. 1hr
2016-02-22 2016-02-24 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-02-24 07:37:31 No salt needed this week. 1hr
2016-02-29 2016-02-29 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-03-21 07:45:31 No salt needed.
2016-03-07 2016-03-11 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-03-11 07:26:11 Added one bag of salt to system. 1hr
2016-03-14 2016-03-14 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-05-05 08:00:16 No salt needed at this time 1hr 2016-03-16 08:40:23 Completed.
2016-03-21 2016-03-21 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-05-05 07:59:22 Added 1 bag of salt to system 1hr 2016-04-01 09:11:50 No salt needed
2016-03-28 2016-03-28 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-05-05 07:58:18 No salt needed at this time 1hr 2016-04-01 09:12:24 Added 1 bag of salt
2016-04-04 2016-05-05 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-05-05 07:57:14 Added 1 bag of salt to system. 1hr
2016-04-11 2016-04-11 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-04-25 07:20:32 No salt needed at this time. 1hr 2016-04-12 13:04:18 Completed
2016-04-18 2016-04-18 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-04-25 11:43:57 Completed
2016-04-25 2016-04-25 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-04-26 07:07:31 Added one bag of salt to system. 1hr 2016-04-25 11:49:50 Completed
2016-05-02 2016-05-02 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-05-02 07:13:11 Added one bag of salt to system. 1hr
2016-05-09 2016-05-09 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if needed.
6253 2016-05-09 17:23:49 No salt needed at this time. 1hr 2016-05-09 17:22:52 Added 1 bag of salt to system. 1hr
2016-05-16 2016-05-16 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-05-17 08:29:37 1 bag of salt was added to the system.
2016-05-23 2016-05-23 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-05-24 14:28:41 Completed
2016-05-30 2016-05-31 Completed 6253 Water Softener
2016 Perform salt check of the system. Add if
6253 2016-05-31 15:07:06 05/31/2016: Added one bag to system 1hr
2016-01-04 2016-01-07 Completed Humidifier -
PMEL - 6253
2016 6253 - 3-month PM on Humidifier (wed)
6253 2016-01-08 07:09:57 01/07/2016: Performed 3 month PM on humidifier at 6253. Visually inspected all piping joints and connections. Found small leaks in make up water piping that will need to be corrected during annual maintenance to prevent excessive downtime with the equipment. Found no corrosion or problems on steam valves and components. Pressure settings/limits all functioned accurately. All strainers were blown out and blowdowns were performed on water level column and bottom of heat exchanger. 4hrs.
2016-05-06 2016-05-06 Completed Humidifier -
PMEL - 6253
2016 6253 - 3-month PM on Humidifier (wed)
6253 2016-05-06 16:35:37 05/06/2016: Performed the following tasks to complete a 3 month PM on steam to steam humidifier at building 6253.
1. Inspected all valve body joints, piping, packing and stem areas for leaks. No active leaks found.
Brushed away debris from previous leaks.
2. Regulator no longer in used due to system requirements and could not be inspected.
3. Valve travel no longer a necessary inspection point as regulator assembly is not being used.
4. Temperature adjusting nut is not longer being used and could not be inspected.
5. Removed steam pressure tubing lines to inspect for blockage and damage. No problems found.
6. Checked steam supply strainer and found minimal debris. Cleaned strainer and reinstalled.
7. Made note of problems with water softener supplying softened make up water to the unit. This item belongs to CE HVAC and was reported by on a previous work ordere.
3 month PM complete. 3hrs.
2015-12-07 2015-12-07 Completed B1 Burnham Steam Boiler
2015 PM - Perform Annual PM on Boiler and
6263 2015-12-15 10:51:19 Completed full PM on this boiler. 3-hrs.
2015-12-07 2015-12-07 Completed B2 Burnham Steam Boiler
2015 PM - Perform Annual PM on Boiler and
6263 2015-12-15 10:52:09 Completed full PM on this boiler.
2016-01-12 2016-01-14 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
6263 2016-01-14 08:40:17 01/11/2016: Performed 6month PM on WH-2 at building 6263. Inspected all fittings for leaks both gas and water. Checked and cleaned combustion air openings. No filters were present on this unit that need to be changed. Checked all wiring for loose connections. Checked and cleaned fan blower wheel.
Verified that relief vavle was in good working order.
Inspected all pressure and temperature gauges. Wiped down exterior and interior of boiler cabinet. 3hrs
2016-01-12 2016-01-14 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
6263 2016-01-14 08:26:42 01/11/2016: Performed 6month PM on WH-1 at building 6263. Inspected all fittings for leaks both gas and water. Checked and cleaned combustion air openings. No filters were present on this unit that need to be changed. Checked all wiring for loose connections. Checked and cleaned fan blower wheel.
Verified that relief vavle was in good working order.
Inspected all pressure and temperature gauges. Wiped down exterior and interior of boiler cabinet. 3hrs
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-05 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
6326 2016-01-05 14:42:51 Completed
2016-01-04 2016-01-06 Completed 6346 Ph Drip Line Test
2016 6346 Test Drip Line (wed)
6346 2016-01-06 13:02:25 Tested drip leg ph7 1hr
2016-04-04 2016-04-25 Completed 6346 Ph Drip Line Test
2016 6346 Test Drip Line (wed)
6346 2016-04-26 09:54:55 Tested the ph of condensate rocks. PH of 5. Replaced rocks.
2016-04-25 07:15:09 Performed PH test. PH of 5. Will need to replace the rocks. 1hr
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-01-25 2016-01-27 Completed B1 Burnham Steam Boiler
2016 Annual Boiler PM 7079 2016-01-27 07:17:20 Performed PM on boiler #1. 5 hrs
2016-01-25 2016-01-27 Completed B2 Burnham Steam Boiler
2016 Annual Boiler PM 7079 2016-01-27 07:17:20 Performed PM on boiler #2. 6 hrs
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-01-27 2016-02-10 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM 7113 2016-02-12 08:53:00 Performed full PM on this water heater. 3hrs
2016-01-27 2016-02-01 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM 7113 2016-02-01 07:37:15 Performed full PM on this water heater. 3hrs
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
7137 2015-12-21 07:09:39
NEW HYDRONIC BOILERS - NO BACKFLOW
PREVENTER
2015-10-05 2015-10-07 Completed 7137 Ph Drip Line Test
2015 7137 Test Drip Line (wed)
7137 2015-10-07 08:46:04 Tested drip line ph7. 1hr
2016-01-04 2016-01-06 Completed 7137 Ph Drip Line Test
2016 7137 Test Drip Line (wed)
7137 2016-01-06 13:02:26 Tested drip line ph 7 1hr
2016-04-04 2016-04-25 Completed 7137 Ph Drip Line Test
2016 7137 Test Drip Line (wed)
7137 2016-05-05 07:54:56 Tested PH of boilers. PH of 5. Acidic. 1hr 2016-04-26 09:53:56 Tested PH of condensate drip lines. PH of 5. Replaced the rocks.
2016-04-25 07:24:18 Tested PH. A level of 5.will need to replace the rocks.
1hr
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-04-21 2016-04-21 Completed Lochinvar Storage Tank
2016 6-Month Lochinvar PM 7153 2016-04-25 09:54:12 Completed PM. 4/21/2016
2016-04-21 2016-04-21 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM 7153 2016-04-25 09:54:12 Completed PM. 4/21/2016
2016-04-21 2016-04-21 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM 7153 2016-04-25 09:54:12 Completed PM. 4/21/2016
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-05-23 2016-05-23 Completed 7176-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
7176 2016-05-25 10:26:20 Completed
2016-05-24 2016-05-24 Completed 7176-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
7176 2016-05-25 10:17:31 Completed
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-06 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-16 2016-05-16 Completed 7228-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
7228 2016-05-25 10:21:54 Completed
2015-11-04 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-06 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-16 2016-05-16 Completed 7271-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
7271 2016-05-25 10:21:54 Completed
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-05 2015-10-19 Completed 7309 pH Test Drip Line
2015 7309 Test Drip Line (wed)
7309 2015-10-19 07:08:25 Tested drip line ph 7 1hr
2016-01-05 2016-01-06 Completed 7309 pH Test Drip Line
2016 7309 Test Drip Line (wed)
7309 2016-01-06 13:02:29 Tested drip leg ph7 1hr
2016-04-04 2016-04-25 Completed 7309 pH Test Drip Line
2016 7309 Test Drip Line (wed)
7309 2016-04-26 09:55:58 7309: Tested the PH of condensate rocks. PH of 6.
Replaced the rocks…also found both inlet barbs had broken off. Picked up two new ones and installed.
2016-04-25 07:19:16 Performed PH test. PH of 5. Also found both inlet ¾ in by barbed plastic fittings were broke off at the canisters.
Will pick up new fittings and try to easy out old threads.
2hrs
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-04 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-06 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
8111 2015-12-30 12:02:10 Drained and shut off 2015-12-30 11:20:02
NOT TESTED. BUILDING HAS BEEN DRAINED AND
SHUT DOWN.
2015-11-06 2015-12-21 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-05 2016-05-19 Completed B2 Burnham Steam Boiler
2016 Annual - Boiler PM - Perform
8124 2016-05-19 06:57:07 Performed a full PM on boilers 1 and 2. Installed new M42 float controllers on both boilers. 6hrs
2016-05-05 2016-05-19 Completed B1 Burnham Steam Boiler
2016 Annual - Boiler PM - Perform
8124 2016-05-19 06:57:07 Performed a full PM on boilers 1 and 2. Installed new M42 float controllers on both boilers. 6hrs
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-05 2016-05-12 Completed B2 Burnham LHB Steam Boiler
2016 Annual - Boiler PM - Perform
8197 2016-05-16 07:22:28 PM on B#1and 2. 8hrs 2016-05-12 07:10:06 Performed full pm on b#1 and 2 8hrs
2016-05-05 2016-05-12 Completed B1 Burnham RHB Steam Boiler
2016 Annual - Boiler PM - Perform
8197 2016-05-16 07:22:28 PM on B#1and 2. 8hrs 2016-05-12 07:10:06 Performed full pm on b#1 and 2 8hrs
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-02-05 2016-02-18 Completed B1 Burnham LHB Steam
2016 Boiler: Perform Annual PM on this boiler
8237 2016-02-18 07:28:26 Completed PM on the boiler. 4hrs
2016-02-05 2016-02-18 Completed B2 Burnham RHB Steam
2016 Boiler: Perform Annual PM on this boiler
8237 2016-02-18 07:28:26 Completed PM on the boiler. 4hrs
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-10-26 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-06 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-06 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-04 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
8515 2015-12-30 09:00:08 Completed
2016-05-17 2016-05-17 Completed 8515-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
8515 2016-05-18 14:21:48 Completed
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-06 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-03 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-01-04 2016-01-07 Completed 8559 Ph Drip Line Test
2016 8559 Test Drip Line (wed)
8559 2016-01-07 07:35:40 Tested drip leg 7ph 1hr
2016-04-04 2016-04-25 Completed 8559 Ph Drip Line Test
2016 8559 Test Drip Line (wed)
8559 2016-05-05 07:51:04 Tested PH level. PH of 5 acidic.. 1hr 2016-04-26 09:52:42 Tested the PH of rocks. PH of 5. Changed out rocks.
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-12 2016-05-12 Completed 8565-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
8565 2016-05-17 09:25:47 Completed Inspection
2015-11-10 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-04-21 2016-04-21 Completed Lochinvar Direct Fired
2016 6-Month Lochinvar PM 9268 2016-04-25 12:18:57 Completed semi-annual PM.
2016-05-18 2016-05-18 Completed 9268-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
9268 2016-05-25 10:23:03 Completed
2015-11-10 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
9327 2015-12-15 13:42:46 Completed
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-10 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-10-05 2015-10-19 Completed 9361 pH Test Drip Line
2015 9361 Test Drip Line (wed)
9361 2015-10-19 07:07:10 Tested drip line ph 7 1hr
2016-01-05 2016-01-05 Completed 9361 pH Test Drip Line
2016 9361 Test Drip Line (wed)
9361 2016-01-05 07:06:43 Tested drip line ph 8 1hr
2016-04-04 2016-05-02 Completed 9361 pH Test Drip Line
2016 9361 Test Drip Line (wed)
9361 2016-05-09 17:24:55 Tested the PH level. 5 acidic. 1hr
2015-11-02 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-10-26 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2016-05-18 2016-05-18 Completed 9477-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
9477 2016-05-25 10:23:03 Completed
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
2015-11-02 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-01-13 2016-01-15 Completed B2 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler (wed)
9549 2016-01-15 15:13:22 PM on B1 and B2 is complete as of 1-15-16 8 hours total for both boilers (1 boiler room)
2016-01-13 2016-01-15 Completed B1 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler (wed)
9549 2016-01-15 15:09:36 PM for B1 and B2 at building 9549 is complete as of 1- 15-16. Report shall be forthcoming. 8 hours
2015-11-02 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-05-18 2016-05-18 Completed 9551-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
9551 2016-05-25 10:23:03 Completed
2015-11-02 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2015-11-25 2015-12-15 Completed B1 Burnham Steam Boiler
2015 BOILER: Perform Annual PM on this
2016-05-12 2016-05-12 Completed 9559-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
9559 2016-05-17 09:25:13 Completed inspection
2015-11-02 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
2016-01-27 2016-02-04 Completed B1 Burnham Steam Boiler
2016 BOILER: Perform Annual PM on this boiler (wed)
9569 2016-02-04 09:04:02 01/29/2016: Performed a PM on B1 at building 9569.
Completed the following items 1.) Replaced sight glasses, nuts and washers.
2.) Installed new gaskets on rear observation glass and cleaned glass.
3.) Tightened all clean out plate bolts.
4.) Inspected canopy gasket and found no blow outs.
5.) Removed all level controls from water columns.
Inspected and cleaned.
6.) Reinstalled level controls using new gaskets.
7.) Inspected, cleaned water column control piping.
8.) Inspected chem feed valve and found a leak that will require weld repairs to fix.
9.) Removed and cleaned siphon tubes on pressuretrol controls 10.) Cleaned pilot assembly and inspected combustion head.
11.) Adjusted pilot electrode.
12.) Tested VF-1 to verify amp draw, belt condition and operation of the damper actuators.
PM to be completed in follow up visit. 4hrs.
02/03/2016: Complete PM of B1 at 9569. Completed the following tasks.
1.) Performed safety checks on all safety limit devices.
2.) Boiler was shut down due to leak on chem feed line. For this reason the boiler could not be run long enough to gain adequate combustion readings and the analysis will need to be performed upon completion of the weld repairs.
3.) Wiped down boiler/burner.
2016-01-27 2016-02-04 Completed B2 Burnham Steam Boiler
2016 BOILER: Perform Annual PM on this boiler (wed)
9569 2016-02-04 09:01:51 01/29/2016: Performed a PM on B2 at building 9569.
Completed the following items 1.) Replaced sight glasses, nuts and washers.
2.) Installed new gaskets on rear observation glass and cleaned glass.
3.) Tightened all clean out plate bolts.
4.) Inspected canopy gasket and found no blow outs.
5.) Removed all level controls from water columns.
Inspected and cleaned.
6.) Reinstalled level controls using new gaskets.
7.) Inspected, cleaned water column control piping.
8.) Inspected chem feed valve and found no issues.
9.) Removed and cleaned siphon tubes on pressuretrol controls 10.) Cleaned pilot assembly and inspected combustion head.
11.) Adjusted pilot electrode.
12.) Tested VF-1 to verify amp draw, belt condition and operation of the damper actuators.
PM to be completed in follow up visit. 4hrs.
02/03/2016: Complete PM of B2 at 9569. Completed the following tasks.
1.) Performed safety checks on all safety limit devices.
2.) Performed combustion analysis of the burner and made necessary fine tuning adjustments.
3.) Wiped down boiler/burner.
4.) Swept floor.
5.) Made notes in boiler log book and recorded additional work orders for future repair.
PM complete and B2 is operational. 3hrs.
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10286
2016-05-11 2016-05-11 Completed 10286-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10286 2016-05-24 14:24:46
2016-05-17 2016-05-17 Completed 10286-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10286 2016-05-18 14:20:59 Returned to complete boiler room cleaning.
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10306
2016-05-11 2016-05-11 Completed 10306-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10306 2016-05-24 14:24:04 Completed
2015-10-26 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10427
2016-02-03 2016-02-08 Completed B1 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler
10427 2016-02-08 08:10:32 02/04/2016: Performed annual PM on B1 at building 10427. PM included the following items.
1.) Replaced sight glass and gaskets.
2.) Verified observation glass to be in good condition.
3.) Tightened clean out plates.
4.) Inspected canopy gaskets for blow outs. Found none.
5.) Removed all level controls and cleaned bowls and float assemblies.
6.) Cleaned control piping, water columns.
7.) Inspected chem feed valve and found to be in good condition.
8.) Removed cleaned and reinstalled siphon tubes for pressuretrols.
9.) Cleaned pilot assembly
10.) Made adjustments to the ignition electrode and pilot assembly.
11.) Verified proper combustion and made adjustments to meet manufacturers recommended settings.
2016-02-03 2016-02-08 Completed B2 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler
10427 2016-02-08 08:10:32 02/04/2016: Performed annual PM on B1 at building 10427. PM included the following items.
1.) Replaced sight glass and gaskets.
2.) Verified observation glass to be in good condition.
3.) Tightened clean out plates.
4.) Inspected canopy gaskets for blow outs. Found none.
5.) Removed all level controls and cleaned bowls and float assemblies.
6.) Cleaned control piping, water columns.
7.) Inspected chem feed valve and found to be in good condition.
8.) Removed cleaned and reinstalled siphon tubes for pressuretrols.
9.) Cleaned pilot assembly
10.) Made adjustments to the ignition electrode and pilot assembly.
11.) Verified proper combustion and made adjustments to meet manufacturers recommended settings.
2016-05-13 2016-05-13 Completed 10427-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10427 2016-05-17 09:37:26 Completed Inspection
2016-05-19 2016-05-19 Completed 10427-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10427
2016-05-20 2016-05-20 Completed 10427-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10427 2016-05-25 10:19:45 Completed
2015-10-26 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10435
2016-01-20 2016-01-21 Completed B2 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler (wed)
10435 2016-01-22 08:19:28 01/21/2016: Performed annual maintenance on B1 and B2 at building 10435. Performed all items contained in the annual maintenance checklist. All safety items were check and the boilers were both placed back into service upon completion. 8hrs.
2016-01-20 2016-01-21 Completed B1 Burnham Steam Boiler
2016 Boiler: Perform Annual PM on this boiler (wed)
10435 2016-01-22 08:19:27 01/21/2016: Performed annual maintenance on B1 and B2 at building 10435. Performed all items contained in the annual maintenance checklist. All safety items were check and the boilers were both placed back into service upon completion. 8hrs.
2015-10-26 2015-12-18 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10437
2016-05-20 2016-05-20 Completed 10437-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10437 2016-05-25 10:19:45 Completed
2015-10-26 2015-12-17 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10441
2016-05-19 2016-05-19 Completed 10441-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
10441
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10471
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10471
2016-01-21 2016-01-21 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10471 2016-01-21 15:06:38 Performed full PM on water heater #2 3hrs
2016-01-21 2016-01-21 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10471 2016-01-21 15:08:57 Performed full PM on water heater #1 3hrs
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10480
2015-11-02 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
10480
2016-01-18 2016-01-20 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10480 2016-01-20 07:12:15 Performed a full PM on this water heater 3hrs
2016-01-18 2016-01-20 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10480 2016-01-20 07:11:36 Performed a full PM on this water heater. 3hrs
2016-02-15 2016-02-18 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10480 2016-02-18 07:32:59 Performed PM on this water heater. 3hrs
2016-02-15 2016-02-18 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10480 2016-02-18 07:32:01 Performed PM on this water heater. 3hrs
2015-11-05 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10488
2015-10-26 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10555
2015-10-05 2015-10-07 Completed 10571 pH Test Drip
2015 10571 Test Drip Line (wed)
10571 2015-10-07 08:46:45 Tested drip line ph7 1hr
2016-01-12 2016-01-15 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10571 2016-01-18 07:27:10 Performed full PM on this unit. 3hrs 2016-01-15 07:28:06 Performed complete PM on lochinvar water heater. 3 hrs
2016-05-05 2016-05-05 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
10571 2016-05-09 07:07:57 Pm on lochinvar water heater. 3hrs 2016-05-06 08:38:08 Completed full PM on this water heater.
2016-01-05 2016-01-05 Completed 10571 pH Test Drip
2016 10571 Test Drip Line (wed)
10571 2016-01-05 07:08:00 Tested drip line ph7 1hr
2016-04-04 2016-04-25 Completed 10571 pH Test Drip Line
2016 10571 Test Drip Line (wed)
10571 2016-05-05 07:52:50 Tested the PH level of condensate 5. Acidic. 1hr 2016-04-26 09:59:12 Tested PH level of condensate rocks. PH of 5.
Replaced the rocks.
2015-11-02 2015-12-15 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
11415
2016-01-14 2016-01-14 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
11415 2016-01-18 07:25:55 Performed full PM on lochinvar water heater. 3hrs 2016-01-14 10:36:00 Also checked Safety Valves, Pump and Pump Seals.
2016-01-13 07:24:11 Completed PM on lochinvar water heater. 3hrs
2016-05-23 2016-05-23 Completed 11415-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
11415 2016-05-25 10:26:20 Completed
2015-10-26 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
11525
2016-01-27 2016-01-29 Completed Lochinvar Water Heater
2016 6-Month Lochinvar PM (wed)
11525 2016-02-01 07:36:27 Performed full PM on this water heater . 3 hrs 2016-01-29 07:34:31 Performed PM on this unit 3hrs
2015-10-26 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
11535
2016-05-09 2016-05-09 Completed 11535-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
11535 2016-05-18 14:24:06 Completed
2015-10-26 2015-12-28 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
11575
2016-05-09 2016-05-09 Completed 11575-Boiler Room
2016 Inspect Boiler Room.
Wipe down boilers and equipment; clean room
11575 2016-05-18 14:23:38 Completed
2015-10-26 2015-12-16 Completed Backflow Preventer
2015 Annual Back Flow Preventer Inspection
10364/11
2015-11-02 2015-12-29 Completed Backflow Preventer
2015 Annual Back Flow Preventor Inspection
11540/11
2016-02-15 2016-02-15 Completed Lochinvar Water
2016 6-Month Lochinvar PM (wed)
2204A 2016-02-19 07:19:38 Performed PM on this lochnivar water heater. 3hrs
2016-01-13 2016-01-13 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-15 13:57:54 Completed
2016-01-14 2016-01-14 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-15 14:12:37 Completed
2016-01-15 2016-01-15 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-15 13:58:57
2016-01-18 2016-01-18 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-19 10:51:32 Completed. 8hrs.
2016-01-19 2016-01-19 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-20 2016-01-20 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-21 10:57:39 Completed
2016-01-21 2016-01-21 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-21 12:24:53 Completed
2016-01-22 2016-01-22 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-22 10:10:11 Completed daily blowdowns.
2016-01-25 2016-01-25 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-27 09:20:37 Completed
2016-01-26 2016-01-26 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-26 15:37:30 Completed
2016-01-27 2016-01-27 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-27 09:22:40 Completed
2016-01-28 2016-01-28 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-01-28 08:07:41 Completed
2016-01-29 2016-01-29 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-02 15:49:27 Completed
2016-02-01 2016-02-01 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-05 09:51:05 Completed
2016-02-02 2016-02-02 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-05 09:59:24 Completed
2016-02-03 2016-02-03 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-08 08:55:11 Completed
2016-02-04 2016-02-04 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-08 08:56:48 Completed
2016-02-05 2016-02-05 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-08 08:55:34 Completed
2016-02-08 2016-02-08 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-09 2016-02-09 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-10 07:54:07 Completed
2016-02-10 2016-02-10 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-10 15:32:09 Completed
2016-02-11 2016-02-11 Completed Blowdown Readings
2016 Daily - Perform Blowdowns of Boilers
JBER-
EAFB
2016-02-12 09:22:59
2016-02-12 2016-02-05 Completed Blowdown Readings
2016 Daily - Perform…