MHAFB 610 Technical Specifications Book 1.pdf

PDF 2 MB Posted

Attached to
Repair/Addition Facility 610 Federal contract opportunity
Solicitation number
FA4897-12-B-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 1-Specification Book 1

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Addition Facility 610, newest first.
File Type Posted
Abstract.pdf PDF
Amendment 0005.pdf PDF
27 13 13 - COMMUNICATIONS CABLING SYSTEMS Addendum 3.doc DOC document
270536 Cable Spec.pdf PDF
Amendment 4 with addendum 3.pdf PDF
28 31 00 - FIRE ALARM AND MASS NOTIFICATION - BLDG 610 Addendum 3.doc DOC document
26 32 13 - ENGINE GENERATORS Addendum 3.doc DOC document
Amendment 0003 with Attachments.pdf PDF
Amendment 0002.doc DOC document
610 Addendum 2 Binder.pdf PDF
Site Visit Attendance.pdf PDF
Amendment 0001.doc DOC document
Solicitation.doc DOC document
Notification of Complaince with Insurance.doc DOC document
Addendum 1.pdf PDF
MHAFB 610 Technical Specifications Book 2.pdf PDF
General Decision Number.docx DOCX document
DETERMINATION OF RESPONSIBILITY RFP.doc DOC document
Solicitation Draft.doc DOC document
Bldg_610_signed_100 Submittal.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Air Force

Construction Documents for the Construction of:

Mountain Home Air Force Base Repair / Addition to

Facility 610

Project Number: QZYH 10- 0076 A/B

Technical Specifications

Book 1 (Divisions 01 - 23)

Prepared For: Mountain Home Air Force Base

Prepared By: McMillen, LLC

May 8, 2012

THIS PAGE INTENTIONALLY LEFT BLANK

REPAIR / ADDITION TO TABLE OF CONTENTS

FACILITY 610 – QYZH 10 - 0076 A/B PAGE - 1

TABLE OF CONTENTS

MHAFB REPAIR / ADDITION TO FACILITY 610

TECHNICAL SPECIFICATIONS

Book 1

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01 11 00 – SUMMARY OF WORK

SECTION 01 11 10 – SUMMARY OF HAZARDOUS MATERIALS WORK

SECTION 01 31 20 – ENVIRONMENTAL STANDARDS

SECTION 01 32 13 – CONSTRUCTION AND SCHEDULE CONSTRAINTS

SECTION 01 32 16 – CPM CONSTRUCTION SCHEDULE

SECTION 01 33 00 – SUBMITTAL PROCEDURES

SECTION 01 42 13 – ABBREVIATIONS OF INSTITUTIONS

SECTION 01 45 00 – QUALITY CONTROL

SECTION 01 50 00 – TEMPORARY FACILITIES AND CONTROLS

SECTION 01 78 23 – OPERATION AND MAINTENANCE DATA

DIVISION 2 – DEMOLITION

SECTION 02 41 19 – SELECTIVE STRUCTURE DEMOLITION

SECTION 02 82 13 – ASBESTOS ABATEMENT

SECTION 02 83 13 – LEAD RELATED ACTIVITIES

SECTION 02 84 13 – PCB HANDLING PROCEDURES

SECTION 02 87 13 – FUGITIVE AND SILICA DUST CONTROL PROCEDURES

DIVISION 3 - CONCRETE

SECTION 03 10 00 – CONCRETE FORMING AND ACCESSORIES

SECTION 03 20 00 – CONCRETE REINFORCING

SECTION 03 30 00 – CAST-IN-PLACE CONCRETE

SECTION 03 31 50 – GROUT

DIVISION 4 – MASONRY

SECTION 04 01 20 – MAINTENANCE OF UNIT MASONARY

SECTION 04 20 00 – UNIT MASONRY

DIVISION 5 – METALS

SECTION 05 10 00 – STRUCTURAL STEEL FRAMING

SECTION 05 30 00 – METAL DECKING

SECTION 05 40 00 – COLD FORMED (LIGHT) METAL FRAMING

SECTION 05 50 00 – MISCELLANEOUS METALWORK

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES

SECTION 06 10 53 – MISCELLANEOUS ROUGH CARPENTRY

SECTION 06 16 00 – SHEATHING

SECTION 06 41 16 – PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS

SECTION 06 64 00 – PLASTIC PANELING

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

SECTION 07 01 50 – PREPARATION FOR RE-ROOFING

SECTION 07 11 13 – BITUMINOUS DAMPPROOFING

SECTION 07 19 00 – WATER REPELLENTS

FACILITY 610 – QYZH 10 - 0076 A/B PAGE - 2

SECTION 07 21 00 – THERMAL INSULATION

SECTION 07 61 00 – SHEET METAL ROOFING

SECTION 07 62 00 – SHEET METAL FLASHING AND TRIM

SECTION 07 92 00 – JOINT SEALANTS

DIVISION 8 – OPENING

SECTION 08 11 13 – HOLLOW METAL DOORS AND FRAMES

SECTION 08 14 16 – FLUSH WOOD DOORS

SECTION 08 31 13 – ACCESS DOORS AND FRAMES

SECTION 08 44 13 – GLAZED ALUMINUM CURTAIN WALLS

SECTION 08 71 00 – DOOR HARDWARE

SECTION 08 80 00 – GLAZING

DIVISION 9 – FINISHES

SECTION 09 01 50 – MAINTENANCE AND REPAIR OF PORTLAND CEMENT PLASTER

SECTION 09 22 16 – NON-STRUCTURAL METAL FRAMING

SECTION 09 29 00 – GYPSUM BOARD

SECTION 09 30 00 – TILING

SECTION 09 51 13 – ACOUSTICAL PANEL CEILINGS

SECTION 09 65 13 – RESILIENT BASE AND ACCESSORIES

SECTION 09 65 16 – RESILIENT SHEET FLOORING

SECTION 09 68 13 – TILE CARPETING

SECTION 09 91 13 – EXTERIOR PAINTING

SECTION 09 91 23 – INTERIOR PAINTING

DIVISION 10 – SPECIALTIES

SECTION 10 14 23 – PANEL SIGNAGE

SECTION 10 21 13 – TOILET COMPARTMENTS

SECTION 10 28 00 – TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 10 44 13 – FIRE EXTINGUISHER CABINETS

SECTION 10 51 13 – METAL LOCKERS

DIVISION 12 - FURNISHINGS

SECTION 12 21 13 - HORIZONTAL LOUVER BLINDS

SECTION 12 36 61 – SIMULATED STONE COUNTERTOPS

DIVISION 22 – PLUMBING

SECTION 22 00 00 – GENERAL PROVISIONS FOR PLUMBING WORK

SECTION 22 05 00 – COMMON WORK RESULTS FOR PLUMBING

SECTION 22 05 29 – HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 22 05 48 – VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING

AND EQUIPMENT

SECTION 22 05 53 – IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 07 00 – PLUMBING INSULATION

SECTION 22 11 16 – DOMESTIC WATER PIPING

SECTION 22 13 16 – SANITARY WASTE AND VENT PIPING

SECTION 22 34 00 – FUEL-FIRED TANKLESS DOMESTIC WATER HEATERS

SECTION 22 40 00 – PLUMBING FIXTURES

DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

FACILITY 610 – QYZH 10 - 0076 A/B PAGE - 3

SECTION 23 00 00 – GENERAL PROVISIONS FOR MECHANICAL WORK

SECTION 23 05 93 – TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 23 07 00 – HVAC INSULATION

SECTION 23 00 08 – COMMISSIONING OF HVAC SYSTEMS

SECTION 23 09 23 – DIRECT DIGITAL CONTROL SYSTEM FOR HVAC

SECTION 23 11 23 – FACILITY NATURAL GAS PIPING

SECTION 23 21 13 – HYDRONIC PIPING

SECTION 23 21 13.10 – HYDRONIC PUMPS

SECTION 23 25 00 – HVAC WATER TREATMENT

SECTION 23 31 13 – METAL DUCTS

SECTION 23 31 13.16 – ROUND AND FLAT-OVAL SPIRAL DUCTS AND FITTINGS

SECTION 23 33 00 – AIR DUCT ACCESSORIES

SECTION 23 34 23 – HVAC POWER VENTILATORS

SECTION 23 37 00 – LOUVERS

SECTION 23 37 13 – DIFFUSERS, REGISTERS, AND GRILLES

SECTION 23 52 00 – HEATING BOILERS

SECTION 23 64 00 – PACKAGED WATER CHILLERS

SECTION 23 73 00 – AIR HANDLING UNITS

SECTION 23 81 23 – COMPUTER-ROOM AIR-CONDITIONERS

SECTION 23 82 19 – FAN COIL UNITS

Book 2

DIVISION 26 – ELECTRICAL

SECTION 26 00 00 – ELECTRICAL SPECIFICATIONS

SECTION 26 00 01 – ELECTRICAL BASE REQUIREMENTS

SECTION 26 00 02 – BASIC ELECTRICAL MATERIALS AND METHODS

SECTION 26 00 06 – PANELBOARDS

SECTION 26 00 08 – MOTOR AND CONTROLS

SECTION 26 00 09 – TESTING ELECTRICAL SYSTEMS

SECTION 26 00 10 – ELECTRICAL SYSTEMS DEMONSTRATION

SECTION 26 05 19 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 26 05 26 – GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 26 05 29 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 26 05 43 – UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL

SYSTEMS

SECTION 26 27 13 – ELECTRICITY METERING

SECTION 26 27 26 – WIRING DEVICES

SECTION 26 28 16 – ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 26 32 13 – ENGINE GENERATORS

SECTION 26 36 00 – TRANSFER SWITCHES

SECTION 26 41 13 – LIGHTNING PROTECTION FOR STRUCTURES

SECTION 26 43 00 – TRANSIENT VOLTAGE SURGE SUPPRESSORS (TVSS)

SECTION 26 51 00 – INTERIOR LIGHTING

SECTION 26 56 00 – EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

SECTION 27 05 36 – CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 13 13 – COMMUNICATIONS CABLING SYSTEMS

FACILITY 610 – QYZH 10 - 0076 A/B PAGE - 4

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

SECTION 28 31 00 – FIRE ALARM AND MASS NOTIFICATION SYSTEM

SECTION 28 83 03 – VESDA VLS AIR SAMPLING SMOKE DETECTION

DIVISION 31 – EARTHWORK

SECTION 31 20 00 – EARTHWORK

SECTION 31 35 26 – EROSION CONTROL BARRIER

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 32 11 13 – A.C. PAVEMENT AND BASE

SECTION 32 31 13 – CHAIN LINK FENCES AND GATES

SECTION 32 31 19 – DECORATIVE METAL FENCES AND GATES

SECTION 32 32 00 – RETAINING WALLS

SECTION 32 90 00 – LANDSCAPE WORK

DIVISION 33 – UTILITIES

SECTION 33 11 00 – WATER DISTRIBUTION

APPENDICES

APPENDIX A - HAZARDOUS BUILDING MATERIAL ASSESSMENT AND SOIL SAMPLING

APPENDIX B - AF-66

APPENDIX C - AS-BUILT DRAWING REQUIREMENTS

APPENDIX D – REAL PROPERTY DATA SHEETS

REPAIR / ADDITION TO SUMMARY OF WORK

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 1

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 -- GENERAL

1.1 SUBMITTALS

A. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

1. Utility outage requests

2. Utility connection requests

3. Excavation Permits

4. Welding permits

5. Burning/ open flame permits

6. Facility outage requests

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Location: The WORK is located at Mountain Home Air Force Base (MHAFB) which is located approximately 15 miles southwest of the City of Mountain Home, Idaho. The Communications Facility Building 610 is located on Liberator Street.

B. Description of Existing Facility: Building 610 has been added to and renovated several times throughout the years and does not currently meet the user’s needs. The original Building 610 was built pre 1950s and was demolished sometime in between the 1952 addition and the 1996 addition. At least two other additions occurred during this time as well. Building materials containing lead and asbestos have been found in the facility and will is required to be remediated prior to the construction of the remodel. The building is also infested with rats and there is the possible presence of Hantavirus. The existing building’s construction consists of primarily Masonry Block load bearing shear walls with concrete foundations, concrete slab on grade and open web truss joist roof structure with steel deck.

C. The WORK includes a reduction in size to the Server Room to make more room for administration area. The generator will be moved outside the foot print of the building into a new secured mechanical area and the space reclaimed. The existing storage and office spaces will be reconfigured to create new contractor and contractor oversight offices, new administration areas, and renovated restrooms. The existing Radio Room and Battery Room will be relocated. New building space will be added by filling in some of the existing courtyard. The building will be brought up to current energy code by insulating the walls and ceiling, and installing a new mechanical system. All of the electrical and communications systems will be brought up to current technology. The Server Room and building up to current fire protection standards including a new building wide fire sprinkler system and VESDA fire alarm in the server areas and Radio Room. The building will also brought into compliance with Anti Terrorism/ Force Protection (AT/FP) requirements by replacing the doors and replacing the windows with

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 2

blast resistant windows, changing the site to enforce the 82 foot vehicle and the 33 foot sightline standoffs by removing concealing plants and objects within 33 feet from the building, and by enclosing the mechanical equipment, generator, and transformer in a mechanical enclosure. The base has required that AT/ FP requirements be exceeded by adding a physical barrier between the parking areas and the facility. New site lighting will be added for greater visibility. The exterior of the building is to be renovated to provide an improved look. The existing Stucco will be renovated and a new standing seam metal hip roof will be added to the existing flat roof.

D. Work Scheduling: As the main infrastructure building which serves as the computer network hub for the base it must remain operational 24 hours a day, 7 days a week throughout the construction phases. The construction phasing and scheduling is important to the success of the project. The contractor shall coordinate all work activities with the Contract Officer and comply with work restrictions set by the Contract Officer.

1.3 OCUPANCY OF PREMISES

A. Building will be occupied during performance of WORK under this contract. Before work is started, the CONTRACTOR shall arrange with the Contracting Officer a sequence of procedures, means of access, space for storage of materials and equipment, and use of approaches, and corridors.

1.4 SPECIAL REQUIREMENTS AT SECURE AREAS

A. Areas designated as secure areas contain classified equipment and information.

Personnel entering these areas shall be escorted at all times by base personnel. The number of CONTRACTOR personnel in these areas is dependent upon the number of escorts. The installation will attempt to provide a sufficient number of escorts when required by the CONTRACTOR. The CONTRACTOR shall request escorts a minimum of 3 days prior to the escort being required.

B. In the event a request for an escort is rejected, the CONTRACTOR shall reschedule work activities to a time mutually agreed upon time with the CONTRACTING OFFICER.

C. Access by the CONTRACTOR into the secure areas may be denied at any time.

D. The CONTRACTOR shall notify the CONTRACTING OFFICER a minimum of 14 days prior to the breach of a secure room or work affecting the security alarms of the secure rooms. Base security personnel are required to guard the secure rooms at all times that the rooms are not deemed secure. Contractor shall schedule work to minimize the time that secure rooms are not secure.

1.5 RESTRICTIONS

A. The CONTRACTOR shall not allow cameras on site or photographs taken except by written approval of CONTRACTING OFFICER.

1.6 EXISTING WORK

A. In addition to contract requirements:

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 3

1. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remains.

2. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.7 ON-SITE PERMITS

A. Notify the Contracting Officer at least 48 hours prior to starting excavation work.

CONTRACTOR is responsible for marking and verifying all utilities not marked.

B. The CONTRACTOR shall verify the elevations of existing piping, utilities, and any type of underground obstructions not indicated or specified to be removed. But indicated in locations to be traversed by piping, ducts, and other work to be installed.

C. WORK shall be scheduled to hold outages to a minimum

D. Utility outages and connections required during the prosecution of WORK that affect existing systems shall be arranged for at the convenience of the GOVERNMENT and shall be scheduled outside the regular working hours or on weekends..

E. Contracting Officer may permit utility outages at his discretion.

F. Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 30 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.8 GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT

A. The GOVERNMENT will furnish the following materials and equipment for installation by the CONTRACTOR:

ITEM DESCRIPTION QUANTITY

UPS PowerWare 9315-50 50kVA UPS

Emerson Liebert Npower 30kVA UPS

Network and Fiber Racks

Chatsworth 7’ two-post equipment racks Fiber Optic Cable Units 3RU Fiber Optic Cable Units 4RU Fiber Optic Splice Unit 4RUs

Alarms – New Construction

Vindicator Control Panel Balanced Magnet Switch 360 Motion Sensor Vault Door Cypher Lock

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 4

Electrical Equipment

400Amp Disconnect Manual Transfer Switch

2 Estimated

Radio Equipment

Monaco Antenna and mount Motorola Canopy Transceiver/Antenna and mount

Fiber Optic Cables

From 2 strand to 72 strand cables 83 Estimated

1.9 GOVERNMENT INSTALLED WORK

A. The GOVERNMENT will furnish and install the following materials and equipment.

1.

ITEM DESCRIPTION QUANTITY

Servers Server Cabinets 3 Estimated Network Switches

Juniper Network 1RU 20 Estimated

Radio Equipment

Radio Cabinets Open Radio Racks Battery System

8 Estimated 3 Estimated

Communication Equipment

Stratum Clock Antenna and Mount 1 Estimated

Furniture and Cabinets

TBD

Fire Extinguishers

Fire Extinguishers 4

B. The CONTRACTOR shall notify, coordinate and schedule with the GOVERNMENT the installation of government installed work in a manor not to delay the project and 30 days before installation is required to begin. The CONTRACTOR shall provide sufficient time in the schedule for the Government WORK activities to be completed.

1.10 GOVERNMENTS USE OF THE SITE

A. The GOVERNMENT may utilize all or part of the existing facilities during the entire period of construction of the construction for the conduct of the GOVERNMENT's normal operations. The CONTRACTOR shall cooperate and coordinate with the Contracting Officer to facilitate the GOVERNMENT's operations and to minimize interference with the CONTRACTOR's operations at the same time. In any event, the GOVERNMENT shall be allowed access to the Site during the period of construction.

1.11 PARTIAL UTILIZATION OF THE WORK BY GOVERNMENT

A. The GOVERNMENT will take partial utilization of the WORK upon completion of the WORK in the construction zones as indicated in the DRAWINGS.

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 5

PART 2 -- PRODUCTS (NOT USED)

PART 3 -- EXECUTION (NOT USED)

- END OF SECTION -

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 00 - 6

THIS PAGE INTENTIONALLY LEFT BLANK

REPAIR / ADDITION TO HAZARDOUS MATERIALS WORK

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 1

SECTION 01 11 10 - SUMMARY OF HAZARDOUS MATERIALS WORK

PART 1 - GENERAL

1.1 DESCRIPTION

A. Hazardous Materials, or materials needing special handling or disposal, that may be potentially impacted by the Project or that could be encountered during construction, have been identified below. The purpose of this Specification Section is to identify all of these materials in one Section, and refer the reader to subsequent Sections as necessary. These materials may include asbestos, lead, PCB-containing light ballasts and fugitive and silica dust.

1.2 RELATED WORK

A. Work performed under this Specification Section is governed by related Specification Sections, including, but not limited to, the following:

Division 1: General Requirements

Division 2: 02 82 13, Asbestos Abatement

02 83 13, Lead Related Activities

02 84 13, PCB Handling Procedures

02 87 13, Fugitive and Silica Dust Control Procedures

1.3 GENERAL REQUIREMENTS

A. Supervisory Authority: The Contractor is to avail themselves of all responsibilities under applicable regulations related to their supervisory authority over Subcontractors and personnel performing work related to hazardous materials.

B. Access Restrictions: Work described in this Section includes restriction of Work Areas during hazardous materials activities. Access to various Work Areas by the general public, general trades and other individuals will not be possible during certain Hazardous Materials Work sequences, as specified herein and elsewhere. The Contractor is to coordinate the Work to facilitate access by Subcontractors while enforcing Work Area restrictions, and to minimize disruption to building occupants and services.

C. Working Hours: Schedule all Hazardous Materials Work to occur in accordance with schedule requirements and when Work Areas have been vacated by building users.

D. Emergency Contacts: Designate qualified representatives of the Contractor and specific Hazardous Materials Subcontractors who are to be available on a 24-hour emergency basis for the duration of the Work. Provide contact information to the CONTRACTING OFFICER for inclusion in the project emergency contact list.

E. General Hazardous Materials Submittals: All Contractors performing Work impacting asbestos are to submit pertinent information required by the associated Specification Section. Examples include, but are not limited to, removal of asbestos-containing floor

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 2

tile, asbestos-containing ceiling and wall texture, asbestos-containing window frame caulk, asbestos-containing roof penetration sealant and asbestos-containing joint compound on non-asbestos gypsum wallboard (< 1% as a composite).

1.4 ASBESTOS

A. Asbestos abatement is included in this Contract. Requirements related to asbestos are outlined below.

B. The Contractor shall refer to the following document: Hazardous Building Material Assessment and Soil Sampling for Presence of Pesticides, Mountain Home Air Force Base, Building 610, Mountain Home, Idaho dated November 9, 2011 by URS Corporation. This document lists suspect asbestos-containing materials (ACMs) sampled and analyzed for asbestos content, or presumed asbestos-containing materials (PACMs), at the areas included in the Work. The Contractor shall ensure that copies of this information are made available to and retained on the project site by all Subcontractors.

C. A copy of the referenced Hazardous Building Materials Survey, including sample data, is provided as Attachment A to this Section.

D. The Contractor shall be aware that suspect ACMs may exist in inaccessible locations of the spaces included in the Work.

1. The Contractor shall proceed with caution during all phases of the Work.

2. Should any suspect ACMs not indicated in the referenced Hazardous Building Materials Survey be encountered, the Contractor shall immediately notify the

CONTRACTING OFFICER.

E. The disturbance or impact of ACMs may cause asbestos fibers to be released into the building’s atmosphere, thereby creating a potential health hazard to building occupants.

The Contractor is to apprise all workers, supervisory personnel, Subcontractors and Consultants who will be at the jobsite of the seriousness of this potential hazard and of proper Work procedures that must be followed, should it occur.

F. Where in the performance of the Work, workers, supervisory personnel, Subcontractors, or Consultants may encounter, disturb, or otherwise function in the immediate vicinity of any identified ACMs, the Contractor shall take appropriate continuous measures, as necessary, to protect all building occupants from the potential hazard of exposure to airborne asbestos. Such measures shall include the procedures and methods described herein, and compliance with applicable local, state and federal regulations.

G. Damage of Asbestos by the Contractor: Damage caused by the Contractor to ACMs to remain in place shall be required only if the damage causes an unsafe condition at the work site or water intrusion into the structure. Required repairs shall be made to the satisfaction of the CONTRACTING OFFICER by the Contractor using certified asbestos workers according to these specifications.

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 3

H. The Contractor is to verify the Scope of Work prior to commencing Work. Asbestos-containing materials within the Work Areas may not require removal. Only materials identified under Part I, Paragraph 1.04.K are to be removed or impacted.

I. The Contractor is to submit health and safety-related submittals for all trades impacting asbestos, including Work impacting materials containing <1% asbestos, as follows:

1. All trades impacting asbestos of any concentration, or performing Work in areas where asbestos may be impacted, shall submit evidence that all applicable personnel have received, at a minimum, Class IV training as required by Code of Federal Regulation (CFR) 1926.1101 (k) (9) (viii).

2. Refer to Section 02 82 13 for submittal procedures.

J. The Contractor shall furnish all labor, materials, equipment, services, permits and insurance (specifically covering the handling and transportation of Asbestos-Containing Materials) that is specified, shown, or reasonably implied for activities related to the following asbestos-containing materials listed in Specification Section 02 82 13:

1. Material: Gray floor Tile and Associated Mastic

a. Quantity: 2,500 square feet (SF)

b. Location: Throughout Office and Hallways (under carpet in most areas)

2. Material: Black Floor Tile Mastic

a. Quantity: 2,500 SF

b. Location: Throughout Building Under Carpet and Floor Tile

3. Material: 12”x12” Glued Ceiling Tile (GCT)

a. Quantity: 430 SF

b. Location: Room #4, Room #6B

4. Material: 2’x1’ CAB Ceiling Tile

a. Quantity: 240 SF

b. Location: Storage Room (next to Room #4)

5. Material: Light Heat Shield Backing

a. Quantity: 1 each

b. Location: Room #10 Closet Light

6. Material: Roofing Material Under Top Layer of Non-Asbestos Roofing and Non- Asbestos Insulation Layers – Presumed to contain asbestos. (the bottom layers of roofing could not be sampled during the assessment)

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 4

a. Quantity: 10,000 square feet (SF)

b. Location: Through Roof Areas

1.5 LEAD

A. Lead-containing Items: The GOVERNMENT has conducted a survey of buildings located at Mountain Home Air Force Base, Building 510 Site for the presence of lead-containing paints, coatings and equipment. Findings and related analytical data are included in the Hazardous Building Material Assessment and Soil Sampling for Presence of Pesticides, Mountain Home Air Force Base, Building 610, Mountain Home, Idaho dated November 9, 2011 by URS Corporation. None of the sampled paints in the Project Area were found to contain lead.

B. The Contractor shall comply with all applicable regulations, laws and ordinances concerning the impact, removal, handling, storage, disposal, monitoring and protection against exposure or environmental pollution related to lead. Impacts to lead that may be required by the Work include, but are not limited to: manual demolition, mechanical demolition, cutting, sawing, drilling, sanding, scraping, welding or torch-cutting. Confirm required impacts with other applicable Specification Sections and drawing sheets.

C. Work impacting lead-containing paints, coatings and equipment within this Contract is the responsibility of the Contractor, and all affected Subcontractors, and shall be performed in accordance with all applicable local, state and federal regulations and the requirements outlined in

1. Based on paint chip testing data, the waste stream generated by the Work will require waste characterization prior to disposal in accordance with EPA regulations.

If lead-containing materials are impacted, the Contractor will collect Toxicity Characteristic Leaching Procedure (TCLP) samples of the representative waste stream. If the Contractor wishes to segregate specific items in the waste stream, further evaluation and sampling may be required to determine if it would be designated as a hazardous waste.

2. The Contractor is to submit a description of actual waste stream constituents, including approximate volumes to be generated by the Work, for review by the Environmental Consultant. Include approximate volumes and types of waste stream constituents to be disposed of as solid waste, accounting for any waste minimization or recycling.

3. The Contractor is responsible for the disposal of all dust, debris, disposable protective equipment, cleaning rags, wash water, and any other materials contaminated with dust from activities impacting lead-containing paints, coatings or equipment, such as surface preparation, sanding, scraping, etc.

4. The following paints as described in the Hazardous Building Material Assessment and Soil Sampling for Presence of Pesticides, Mountain Home Air Force Base, Building 610, Mountain Home, Idaho dated November 9, 2011 by URS Corporation, were found to contain regulated levels of lead:

a. West Wall of Front Lobby

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 5

1) White/Green paint on gypsum wallboard

b. North Wall of Men’s Restroom

1) Blue/Brown paint on gypsum wallboard

1.6 CONTAMINATED SOILS AND STORM OR GROUND WATER

A. Pesticides in Soil: The GOVERNMENT has conducted a soil assessment at the Mountain Home Air Force Base, Building 610 Site for pesticides in soil. Findings and related analytical data are included in the Hazardous Building Material Assessment and Soil Sampling for Presence of Pesticides, Mountain Home Air Force Base, Building 610, Mountain Home, Idaho dated November 9, 2011 by URS Corporation. Based upon the concentration of Chlordane in the composite soil samples, no remediation action is required. However, the presence of Chlordane may require personnel exposure monitoring, as required by OSHA, if soil is disturbed or impacted during renovation or demolition activities.

1.7 POLYCHLORINATED BIPHENYLS (PCBs)

A. Light Ballasts

1. The Contractor shall furnish all labor, materials, equipment, services and insurance that is specified, shown, or reasonably implied for activities involving the removal and packaging of PCB and non-PCB light ballasts. The CONTRACTOR shall provide packaging materials and transportation to the disposal site. Any ballast that is not labeled “No PCBs” is regulated by the EPA as a PCB ballast. Not all of the light fixtures were disassembled at the subject area. Therefore, URS has assumed that 100% of the total number of fluorescent light ballasts in the subject area contains PCBs.

1.8 Mercury-Containing Components

A. Fluorescent Light Tubes

1. The Contractor shall furnish all labor, materials, equipment, services and insurance that is specified, shown, or reasonably implied for activities involving the removal and packaging of fluorescent light tubes. The CONTRACTOR shall provide packaging materials and transportation to the disposal site. URS identified 300 four foot fluorescent light tubes in the Project Area

B. Mercury Vapor Exterior Lights

1. The Contractor shall furnish all labor, materials, equipment, services and insurance that is specified, shown, or reasonably implied for activities involving the removal and packaging of mercury vapor lights. The GOVERNMENT will provide packaging materials and transportation to the disposal site. URS identified 8 mercury vapor exterior lights in the Project Area.

1.9 Special Precautions

A. Rodent/Hantavirus Hazard

FACILITY 610 – QYZH 10 - 0076 A/B PAGE 01 11 10 - 6

1. During the Assessment URS observed rodent feces and other evidence of the presence of rodents throughout the project area. Rodents are the main carrier and vector of the hantavirus. Hantavirus is known to cause Hantavirus Pulmonary Syndrome (HPS). HPS can cause death or other serious complications. Special precautions and control procedures should be implemented to prevent exposure to rodent feces, saliva or urine to building occupants or workers.

2. The Contractor shall furnish all labor, materials, equipment, and services to properly protect the workers from inhalation of potentially harmful diseases.

1.10 WORK PERFORMED BY ENVIRONMENTAL CONSULTANT

A. The Environmental Consultant will perform asbestos pre-abatement, area and post-abatement air monitoring and Work Area inspections as indicated in Section 02 82 13, Asbestos Abatement.

B. All necessary sampling and analysis for determination of hazardous waste streams will be performed by the Contractor.

C. The Contractor is to provide all air monitoring related to personal asbestos, lead, and silica exposure of its employees required by applicable regulations according to Section 02 82 13. The GOVERNMENT reserves the right to collect asbestos, lead, PCB and silica air samples from the breathing zone of the Contractor’s employees to determine employee exposure.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

SEE ATTACHMENT A

Hazardous Building Material Assessment and Soil Sampling for Presence of Pesticides Mountain Home Air Force Base

Building 610 Mountain Home, Idaho

REPAIR / ADDITION TO ENVIRONMENTAL STANDARDS

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 1

SECTION 01 31 20 - ENVIRONMENTAL STANDARDS

(Revised May 2, 2011)

PART 1-- GENERAL

1.1 SUMMARY

A. The contractor is responsible for complying with all Air Force, local, state, and federal laws and regulations regarding protection of the environment and resources.

1.2 QUALITY CONTROL

A. The contractor and subcontractors shall establish and maintain a quality control system for environmental protection of all items set forth in this contract. Record any problems in complying with laws, regulations, ordinances, and corrective actions taken.

B. Notifications: The Contracting Officer (CO) will notify the contractor in writing whenever noncompliance with Federal, state, or local laws, regulations, or permits is observed. In such cases, the contractor shall provide written response to the CO, outlining the proposed corrective actions and take such actions after receiving approval from the CO.

If prompt action to comply with pertinent laws or regulations is not taken, the CO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted for work stoppage due to the contractor’s noncompliance with environmental laws and regulations. Additional costs or damages will not be allowed to the Contractor for any such suspension.

C. Work Areas: The Contractor is responsible for cleanup and restoration of all areas utilized during this contract action. All restoration and cleanup activities will be at the contractor’s expense and to the satisfaction of the Government Representative. If the contractor fails or refuses to restore the area to its original condition or better at the end of the contract field effort, the CO shall have the necessary work performed and charge the cost to the Contractor.

1.3 Environmental Management System (EMS)

A. The Base has implemented ISO 14001 Environmental Management System in accordance with Executive Order 13423. It is a management tool to be used for recognizing the environmental impacts of our job; reducing our environmental footprint and for always looking to improve the way they conduct business at MHAFB. Anyone doing business on MHAFB is required to know about EMS and implement it on all projects. Additional information pertaining to this directive can be found at the MHAFB public web site.

1.4 HAZARDOUS MATERIALS (HAZMAT)

A. Contractor’s Use of Hazardous Materials on Base: There are two categories of contractors using HAZMAT on MHAFB. Contractor’s hazardous materials will NOT be bar-coded. Contractor categories and Hazardous Materials (HM) tracking requirements are as follows:

1. Long term contractors: These contractors have been awarded a contract (of any type) that has an estimated or expected duration of 6 months or more and

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 2

hazardous materials are expected to be used during performance of the work.

Examples of these types of contracts include, but are not limited to: US Army Corps of Engineers’ projects, MAJCOM projects and base maintenance contractors. The AF3952s will be valid for the duration of the contract whenever possible. Long term contractors must complete ALL requirements listed in part 1.4.2.

2. Short term contractors: Short term contractors have been awarded a contract (of any type) that has an estimated or expected duration of less than 6 months and are expected to use hazardous materials during performance of the work. These contracts will be evaluated by the 366 CES/CEAN HAZMAT Manager and/or the MHAFB Hazardous Materials Management Process (HMMP) Team on a case by case basis. Contractors in this category may be required to track all, partial, or none of their HAZMAT dependent upon the type of work to be done, and the types and quantities of HAZMAT to be used. The Government Representative must contact the 366 CES/CEAN HAZMAT Program Manager (HMPM) for determination of these types of contracts.

B. HAZMART Tracking Procedures for Contractors: For the purposes of establishing the required HAZMART account and processing hazardous materials authorization requests, ALL contractors must submit the following to 366 CES/CEAN HMPM, Bldg 1297 prior to bringing the requested hazardous materials onto Mountain Home Air Force Base (MHAFB):

1. A completed “MHAFB Contractor’s Hazardous Materials Reporting Form,” included in Attachment 5 of the MHAFB HAZMAT Monitor’s Handbook shall be submitted.

This form will list all hazardous materials intended to be used during the contract with either actual or maximum estimated quantities. The Reporting Form is also available from the HAZMART at (208) 828-2360/2690, or the HMPM at 208-828- 6351.

2. A copy of a manufacturer specific Material Safety Data Sheet (MSDS) must be provided for each hazardous material listed on the reporting form.

3. [SHORT TERM CONTRACTORS STOP HERE and await determination. If, after submitting the paperwork from Section 1.4.2 your Government Representative notifies you that you MUST track any or all of your hazardous materials, continue on from here for all hazardous materials that are required to be tracked. If you are NOT required to track ANY hazardous materials, you are finished at this point.]

4. Once approved by the 366 CES/CEAN HMPM, the package will be logged into 366 CONS/LGCB database systems on Submittal Form 3000 (if applicable). The product information will be entered, by HAZMART personnel, into EESOH-MIS material tracking system, which will generate an approved AF Form 3952. Where possible the AF Form 3952 will be approved for the duration of the contract. The contractor shall be responsible to maintain the AF Form 3952 and MSDS for each hazardous material and submit them for inspection upon request. The contractor shall be responsible for providing proper storage (e.g. flammable, combustible, corrosive, secondary containment, etc.) and practice safe usage and handling of materials.

C. Monthly Reporting: The contractor will keep track of actual hazardous materials usage

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 3

quantities and report the quantities monthly to the HAZMART. This will be done by maintaining the “Contractor’s Hazardous Materials Monthly Usage Reporting Form,” included in Attachment 6 of the MHAFB HAZMAT Monitor’s Handbook, and faxing it directly to the HAZMART and furnishing a copy to the Government Representative on or before the 5th day of each month. The fax number to the HAZMART is 208-828-2335 where this form is also available.

D. Adding a New Hazardous Material: If a hazardous material needs to be used which had not been previously authorized or included on the initial “MHAFB Contractor’s Hazardous Materials Reporting Form”, the contractor shall provide items in Section 1.4.2 above to the Government Representative and await the return of the packet with approved AF Form 3952s.

E. Closing out the HAZMART Account upon Completion: Upon completion of the contract, the contractor must contact the HAZMART and ensure that all hazardous materials used during the contract were reported to the best accuracy possible. Only containers of hazardous materials that were completely consumed during performance of the work need to be accounted for. ALL leftover, full, partially full or empty hazardous materials containers not used during performance of the work are the property of the contractor and will be removed from MHAFB upon completion of the contract unless specific prior arrangements have been made with the Government Representative in coordination with the HMPM.

F. Reserved Right of MHAFB HMMP Team: The team reserves the right to include any and all contractors, regardless of contract duration or scope of work, or tenant/vendor functions or facilities, upon determination of the HMMP Team, in any or all requirements stated in the MHAFB HAZMAT Monitor’s Handbook.

G. All storage containers 55 gallons or greater must have appropriate secondary containment to satisfy federal requirements. Notify the Government Representative of any storage tanks (i.e. refueling/dispensing tanks, etc) brought on base. The Government Representative will coordinate with 366 CES/CEAN at 208-828-1761 to ensure that the Contractor properly maintains and stores any storage tanks on base.

1.5 HAZARDOUS WASTE

A. Notify the Government Representative if any hazardous substance or waste, as defined by the Environmental Protection Agency (EPA), is produced as a by-product of work activities. Note: In general, hazardous wastes are usually generated when the following materials are used during the project:

1. Paints

2. Cleaners (any type), solvents, thinners

3. Sealants / adhesives

4. Gasoline or similar type fuels.

B. The Government Representative will coordinate with 366 CES/CEAN at 208-828-6351 to ensure that the Contractor properly identifies, segregates, samples, stores, transports, FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 4 and disposes of any wastes generated, both hazardous and non-hazardous. The Contractor shall be responsible for the proper handling, storage, transporting, manifesting/disposal and regulatory compliance with all such substances and the cost incurred for complying with all applicable regulatory requirements.

C. Hazardous Waste Transportation: Notify the Government Representative before transporting any hazardous substance or waste, as defined by the EPA, while at MHAFB. Identify the type and quantity of each substance, the origin and destination on/off MHAFB, and intended route of travel. By law, hazardous waste cannot be transported onto MHAFB.

D. Ownership: Hazardous waste generated by construction operations remains the property of the Contractor and shall be manifested and removed from MHAFB for proper disposal. The Contractor is required to coordinate with the 366 CES/CEAN 208-828- 6351 through the Government Representative for proper storage, characterization, transport and disposal of waste from MHAFB.

E. Compliance with Regulations: Contractor operations shall be in compliance with the Resource Conservation and Recovery Act (RCRA), 40 CFR, and Idaho Rules, Regulations and Standards for Hazardous Waste, (Idaho Code 58.01.05) at all times.

F. Limits: No more than 55 gallons, total, of hazardous waste shall be accumulated by the Contractor on site. The Contractor must coordinate with the 366 CES/CEAN 208-828- 6351 through the Government Representative for the location where hazardous waste is to be accumulated, the containers used for storage, and transportation off of MHAFB.

G. Submit a Hazardous Materials/Hazardous Waste Control Plan to the Government Representative for approval and coordination if any materials will be used that are corrosive, flammable, toxic, or reactive.

H. Hazardous wastes shall be manifested off of MHAFB. Comply with all applicable regulations and laws when transporting hazardous waste and materials. These include, but are not limited to, Department of Transportation (DOT), EPA, and Idaho Department of Environmental Quality (IDEQ) regulations (40 CFR, 29 CFR, IDAPA 58.01). The 366 CES/CEAN 208-828-6351 is the only approval authority for hazardous waste transportation/disposal for MHAFB. The Contractor is required to coordinate with the Asset Management Flight Environmental Section 208-828-6351 to manifest hazardous waste off of MHAFB.

I. Universal Waste: Universal waste consists of designated items that, by law, have to be collected, managed and disposed via special direction. Coordination with the Central Collection Facility (CCF) at Building 1296 (828-2726/2396) is required for manifesting and/or courtesy storage. These items consist of batteries of all sized and types (except lead/acid vehicle batteries), fluorescent or incandescent bulbs of all sizes and types, pesticides and mercury containing items such as thermostats, thermometers, etc. If at any time universal waste is encountered or expected to be encountered, contact the 366 CES/CEAN Hazardous Waste Program Manager at 828-6351, or the CCF for clarification or assistance.

J. Soils: There is the potential for many of the soils being removed from base by construction activities to contain hazardous constituents. Because of this, any suspect

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 5

soils as determined by CEAN Compliance will be tested prior to disposal to determine the proper disposal method. One of the major concerns is pesticides, mainly chlordane, which can be expected in the soil under all building slabs, and outside and inside of the foundation walls of any structures built until 1983. All soil within these defined areas that are excavated during demolition or construction activities shall be placed back into excavation as near the point of origin as possible. If working in an area where a building has been demolished and the foundation is not identifiable, the entire area needs to be considered for possible residual pesticide materials. Under no circumstances shall the soil be transported off the project site unless prior approval has been obtained from CEAN Compliance and proper sampling/analysis has been conducted. The definition of “project site” will be the immediate vicinity of the construction/demolition activities within the project boundaries. When moving soils into the former foundations locations and during grading, the Contractor shall keep the soil moist to minimize fugitive dust. Soils shall have a 6-inch layer of top soil over all landscaped/turf areas prior to placement of sod/seed. If Contractor chooses to crush foundations for re-use on site, the Contractor shall keep these materials wet to minimize fugitive dust. Concrete sampling for characterization may be required PRIOR to crushing if concrete is to be moved off-site;

Contractor will work with CO and 366th CEAN to determine extent and type of sampling/analysis required. Fines from the crushing operation of building foundations shall be treated and dealt with as potential contaminated soil. Soils coming on to base as fill material needs to be certified clean before being used on a project. CEAN will be responsible for reviewing the certification information for acceptance.

1.6 ASBESTOS AND LEAD CONTAINING MATERIALS

A. In the event asbestos or lead abatement is required, the contractor shall file the appropriate advanced notification(s) to the appropriate regulatory authority. Submit notification copies to the Government Representative and the Environmental Office prior to the start of work. The contractor shall ensure that the details of the abatement plan (containment/work area, clean rooms, load-out, clearance samples) have been reviewed by a certified industrial hygienist and meet applicable Federal and OSHA regulations for asbestos and/or lead abatement projects.

1.7 SPILLS

A. Uncontrolled Spills: In the event of an uncontrolled spill, the contractor shall notify the MHAFB Fire Department by calling 911. MHAFB Fire Department will initiate the notification system. Notify the CO of all spills regardless of substance or quantity. The Government Representative will coordinate with 366 CES/CEAN, 208-828-6351, to ensure that all spills have been properly contained, cleaned-up, and reported. When the contractor reports a spill, it shall note if the spill falls into 1 of the 3 categories:

1. Class I Spill: Less than 2 lineal feet in any plane dimension

2. Class II Spill: Not over 10 lineal feet in any plane; not over 50 square feet; and not of a continuous nature

3. Class III Spill: Over 10 lineal feet in any one dimension; over 50 square feet; and/or of a continuous nature

B. Spill Response Plan: Develop a spill response plan (Site Specific Contingency Plan

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 6

(SSCP)) that addresses prevention and control of spills for each type chemical and fuel used or stored at each site occupied under this contract. Contact the POL/Fuel Storage Tanks Protocol Manager at MHAFB, 366 CES/CEAN; phone 208-828-6351 for assistance in developing the SSCP. CES/CEAN has a SSCP template form available for Contractor review and use as a form. The SSCP must include the name of the individual (and an alternate individual) who will report any spills or hazardous substance releases and who will follow up with complete documentation. Each employee must be familiar with the plan so risk of spills is minimized and response to spills can be dealt with in a manner to minimize impact to the environment. The Contractor shall be responsible for all costs associated with cleanup and restoration of sites contaminated by chemicals from Contractor activities. The elements of the plan should include the following:

1. PREVENTION: Methods and procedures established by the Contractor to prevent spills from occurring. Examples include ensuring connections are tight, providing containment when drawing off chemicals from a container or transferring chemicals, closing containers when not in use, and using proper equipment for the job.

2. CONTROL: Procedures to control the spread of a substance or chemical should spill, release or leak occur. The intent is to minimize environmental contamination without physical harm to people in the area.

3. SUPPLIES: Provide necessary supplies and equipment on hand to control any spills, leaks, or releases. These include pads and other absorbent material, trays, mats to cover manholes and drains, etc.

4. TRAINING: The Plan must ensure employees, including subcontractors working on the job, are educated and trained in the prevention and response procedures that are tailored to the specific site and task.

5. PROCEDURE OUTLINE: An outline of expected procedures to be followed in the event of a release or spill of a chemical is provided for the Contractor’s use. The Contractor is ultimately responsible for ensuring spills do not occur and responding in a manner to prevent harm to people and minimize environmental contamination.

The person discovering the spill or release is responsible for initiating the Spill Response Plan and providing initial defensive actions without undue risk of personal injury. Implement the following actions as necessary upon discovery of the spill or release.

a. Initiate evacuation if required.

b. Notify the base Fire department at 911. The caller should provide the following information to the base fire department if known or can be reasonably determined:

1) Name, and company, of individual reporting the spill

2) Location and size of the spill or release:

i. Class I Spill: Less than 2 lineal feet in any plane dimension

FACILITY 610 – QYZH-10 - 0076 A/B PAGE 01 31 20 - 7

ii. Class II Spill: Not over 10 lineal feet in any plane; not over 50 square feet; and not of a continuous nature

iii. Class III Spill: Over 10 lineal feet in any one dimension; over 50 square feet; and/or of a continuous nature

3) Number of injured personnel and nature of injuries (if applicable)

4) Substance spilled or released, based on knowledge, labels, signs, etc.

5) Estimated rate of substance release

6) Time spill occurred

7) Extent to which spill has traveled

8) Any additional information that might aid the Fire Department, such as other potential hazards at the site

9) Stop the spill or release at the source whenever possible without risking personal injury.

10) Contain the spilled material to prevent further spread and release to drainage ditches, pipes, manholes, storm water drop inlets, etc.

11) Secure the area to ensure unauthorized personnel do not approach or become endangered.

12) Ensure all sources of ignition are restricted and prevented in the area when flammable substances are involved.

13) Contact the Government Representative and CEAN 208-828-6351 and inform them of the situation.