CDRL_A006_Environmental_Protection_Plan.pdf

PDF 298 KB Posted

Attached to
T-38 Aircraft Maintenance Program (AMP) Federal contract opportunity
Solicitation number
FA4890-15-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

Draft PWS Appendix B - Contract Data Requirements Lists CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to T-38 Aircraft Maintenance Program (AMP), newest first.
File Type Posted
T-38_AMP_Pre-Proposal_Conf_letter_(2)-signed.pdf PDF
Site_Visit_Official_Questions--30_Sep_15_(2)_Final.pdf PDF
T-38_AMP_Langley_OL_Site_Visit_Memo_(2).docx DOCX document
FCF_and_Ferry_Flight_Workload_Data.docx DOCX document
CTP_CBA_2013.pdf PDF
1_on_1_Industry_Day_Written_Questions_--15_Jun_15.pdf PDF
Industry_Day_Attendees_7_May_15.pdf PDF
DASH_6_PHASE_WORK_LOAD_ESTIMATES.xlsx XLSX spreadsheet
Rm_115_(Storage).jpg JPG image
Rm_102_(Eng_Mx).jpg JPG image
Rm_103_(CTK_1).jpg JPG image
Rm_121_(Break_Room).jpg JPG image
Building_205_Hallway.JPG JPG image
Building_205_IMDS_room.JPG JPG image
Tool_Crib _Breakroom _and_Storage_Cage.jpg JPG image
Plans_and_Scheduling_and_Foreman_Office_-_Room_112.jpg JPG image
Hangar_Bay_Rear.jpg JPG image
Langley_Bldg_753_-_Hangar_200_First_Floor_Plan.pdf PDF
Bldg_300_Front.jpg JPG image
Bldg_300_turbine_room.jpg JPG image
Bldg_308_-_309_AGE.jpg JPG image
Bldg_300_gearbox_room.jpg JPG image
Bldg_578_int.jpg JPG image
Bldg_315_Fuel_Shop.jpg JPG image
DD_FORM_254_T-38_AMP.pdf PDF
T-38_AMP_Security_Addresses.pdf PDF
Contractor_Minimum_Workforce_Qualifications.xlsx XLSX spreadsheet
T-38_PI-AF_Plan_29_Apr_15.pdf PDF
Bldg_282_Corrosion_-_Wheel_-_Tire_Front.jpg JPG image
Bldg_280_Batt_Rm_1.jpg JPG image
Bldg_281_Welding_int.jpg JPG image
Bldg_279_int.jpg JPG image
Bldg_279.jpg JPG image
Bldg_281_SM_-_Welding_Front.jpg JPG image
Bldg_280_NDI_film_proc.jpg JPG image
Bldg_282_int.jpg JPG image
Bldg_280_Machine.jpg JPG image
638_-_639_Test_Cell.jpg JPG image
Bldg_284_Egress_back.jpg JPG image
Flight_Shack_(Side_View).JPG JPG image
Flight_Shack_(Support_Section).JPG JPG image
afi10-220_ip.pdf PDF
Host_Base_Pubs_14_Apr_15.xlsx XLSX spreadsheet
CDRL_A011_Aircraft_Maintenance_Indicators_Report.pdf PDF
CDRL_A010_GFE_Inventory.pdf PDF
CDRL_A005_Personnel_Report.pdf PDF
CDRL_A008_Incident_Report.pdf PDF
CDRL_A007_ESOH_Program.pdf PDF
FA4890-15-R-0007_DRAFT_L_ _M.pdf PDF
Attachment_1_-_Draft_Performance_Work_Statement.docx DOCX document
Show all 50

T-38 Aircraft Maintenance Program (AMP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

1_DATA_ITEM_NO: A006
2_TITLE_OF_DATA_ITEM: Environmental Protection Program
3_SUBTITLE: Environmental Protection Plan (EPP)
4_AUTHORITY_Data_Acquisit: DI-MGMT-80898
5_CONTRACT_REFERENCE: PWS Section A, Paragraph 2.5.3.
6_REQUIRING_OFFICE: ACC AMIC/PCE
7_DID_250_REQ: LT
8_APP_CODE:
DIST_STATEMENT: A
10_FREQUENCY: ANNLY
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: 90 DAC
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: ACC AMIC/PKC
draft1:
reg1:
repro1: 1
addressee2: ACC AMIC/PMA
draft2:
reg2:
repro2: 1
addressee3: ACC AMIC/PCE
draft3:
reg3:
repro3: 1
addressee4: ACC AMIC/DRQ
draft4:
reg4:
repro4: 1
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 4
16_REMARKS: Block # 5: Base–specific plans shall include, but not limited to: Hazardous Waste Program, Hazardous Waste Collection and Disposal, Pollution Prevention Program, Hazardous Materials (HAZMAT) Program, Petroleum, Oils & Lubricants (POL) Management, Air Emissions to include Air Quality Ozone Depleting Chemicals (ODCs), Toxic Substances, Water Quality, Wastewater, Storage Tanks, Spill Prevention and Response.

Block #7,8: Contractor's EPP will be reviewed and accepted or rejected by the Government within 30 working days after receipt. If rejected the contractor shall revise and resubmit the document within 10 working days after receipt unless otherwise directed by the CO. Approval is the responsibility of the DOM.

Block #s 10,12,13: Contractor to submit first drafts NLT 90 days after commencement of contract start. Review annually, as a minimum, for currency and if needed, resubmit to the Government any desired changes for acceptance. If rejected, the contractor shall revise and resubmit the document within 10 working days after receipt unless otherwise directed by the CO. Submit updated S&HP, with a revision page clearly explaining updates made, 30 days prior to the end of each contract year.

Block #14: Report shall be in electronic format compatible with Microsoft Office Windows 7® or higher software or unless otherwise directed by the Government with the following file name structure: CDRL A003 + “Name”. The delivery method is emailing.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Stephen M.Brannen, GS-13, DAF
H_DATE: 11 Mar 15
1_APPROVED_BY:
J_DATE:
Page:
reg38t: 0
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER: ENVIRONMENTAL
DSYSTEMITEM: T-38 Aircraft Maintenance Program
E_CONTRACTPR_NO:
FCONTRACTOR:
16_REMARKS_Continued:
Page2:
of_pages:
Reset:

File details come from the government source that posted it. Updated .