Atch 44- Past Performance Questionnaire.pdf

PDF 334 KB Posted

Attached to
Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA486119RA001
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a past performance questionnaire for a contractor and details regarding a federal contract opportunity with the Department of the Air Force Air Combat Command. The past performance questionnaire seeks evaluations from customers on previous contracts and includes sections for contract identification, customer agency identification, evaluator identification, and a performance evaluation. The related federal contract opportunity is a multiple award construction contract solicitation for Nellis/Creech Air Force Bases, seeking general construction services such as civil, structural, electrical, and mechanical work. Relevant response dates or award dates are not provided.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
Solicitation_Amendment_FA486119RA0010008_SF_30.pdf PDF
Atch_48-_App_D_RKMF_17-0097_Electrical_REVISED_13Aug19.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Atch_50-_App_F_RKMF_17-0097_Site_Utilities_REVISED_8-9-19.JPG JPG image
Atch_00-_MACC_Attachment_Index.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010005_SF_30.pdf PDF
Solicitation_Amendment_FA486119RA0010004_SF_30.pdf PDF
Atch_52_Bid_Schedule,_RKMF_17-0097.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010003_SF_30.pdf PDF
Atch_55-_19RA001_Preproposal_Site_Visit_(Slides_and_Sign-In_Sheet).pdf PDF
Atch_53-_RKMF_17-0097_VCC_SOW_Dated_11_July_19.pdf PDF
Atch 09- ACC Sole Source EMCS Letter.pdf PDF
Atch 45- App A RKMF 17-0097 Site Plan.pdf PDF
19RA001_MACC_Attch_12-24.zip ZIP file
Atch 02- Nellis-Creech IFS appendix Fire Protection Req.pdf PDF
Atch 31- Progess Report Template.pdf PDF
Atch 08- Environmental Permit Guidance.pdf PDF
Atch 42- Subcontractor Teaming Partner Consent Form.pdf PDF
Atch 26- Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 03- Nellis-Creech IFS appendix Comm Req.pdf PDF
Atch 52- Bid Schedule RKMF 17-0097.pdf PDF
Atch 10- NAFB Plan 32-7086 Hazardous Materials Management Plan.pdf PDF
Atch 19- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf PDF
Atch 21- UG17-2 VEA Standards.pdf PDF
Atch 07- Nellis-Creech IFS appendix Utility Meter Req.pdf PDF
Atch 51- App G RKMF 17-0097 Site Comm.JPG JPG image
Atch 11- USAF Integrated Cultural Resources Mgmt Plan.pdf PDF
Atch 04- Nellis-Creech IFS appendix Electrical Req.pdf PDF
Atch 01- MACC SOW.pdf PDF
Atch 35- WD NV190001 20180001.pdf PDF
Atch 49- App E RKMF 17-0097 Site Contours.JPG JPG image
Atch 30- Progress Schedule Template.xls XLS spreadsheet
Atch 54- VCC Site Plan 2018-10-02.jpg JPG image
Atch 29- Cost Estimate Template.xlsx XLSX spreadsheet
Atch 24- VEA CONNECTION CHARGE AGREEMENT.docx DOCX document
Atch 13- UR2 S Primary and Secondary Trenching Requirements.pdf PDF
Atch 53- RKMF 17-0097 VCC SOW 20181203.pdf PDF
Atch 34- BUILDER inventory sheet.xls XLS spreadsheet
Atch 12- UM1-6C 3-Phase Pad and Vault.PDF PDF
Atch 17- Bulletin 1728F-806 UG Main VEA standard.pdf PDF
Atch 15- UM33 200 Amp 3-Phase CJE 4 inch Conduit Placement Standards.pdf PDF
Atch 32- Schedule of Vaules Template.xlsx XLSX spreadsheet
Atch 25- NTTR Visit Request.pdf PDF
19RA001_MACC_Attch_25-34.zip ZIP file
19RA001_MACC_Attch_12-24.zip ZIP file
Atch 14- UM3-14 1-Phase CJE Conduit Placement Standards.pdf PDF
Atch 00- MACC Attachment Index.pdf PDF
Atch 05- Nellis-Creech IFS appendix Lighting Req.pdf PDF
Show all 50

Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

FA4861-19-R-A001

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

NELLIS-CREECH MACC

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor:

B. Cage Code under which contract was performed:

C. Contract number / Program Title:

D. Contract type (ex: FFP, Cost, T&M):

E. Was this a competitive contract? Yes No

F. Was it a design-build contract? Yes No

G. Period of Performance:

H. Performs duties as: prime contractor _________ sub-contractor________

I. Initial (at time of award) contract value: $ (Basic plus all options)

J. Current/final contract value: $ (Basic plus exercised options)

K. Reasons for differences between initial contract value and final contract value:

L. Description of work provided:

M. Are there Contractor Performance Assessment Reporting System (CPARS) Evaluation or other Past Performance Reports available for this contract? Yes No _

N. To help determine program relevancy, please indicate below the work the contractor has or is performing under this contract by placing an “X” in the appropriate block:

A-E Design work

Civil (pavements, site utilities) and/or Structural work

Electrical and/or Communications work

PAST PERFORMANCE

QUESTIONNAIRE FA4861-19-R-

A001

Mechanical (plumbing, HVAC) work

Fire Protection work

Security (secure rooms for classified work) and/or Force Protection work

New Construction (including building additions)

Interior renovation

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or Agency Name: ____________________________________________________

B. Customer or Agency description (if applicable):

C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Evaluator’s name:

B. Evaluator’s title:

C. Evaluator’s phone/fax number:

D. Evaluator’s email address: ___________________________________________

E. Number of years evaluator worked on subject contract:

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by marking the performance scale indicated in the appropriate block. The scale is defined as follows:

* Please provide comments for each response you indicated as “Did Not Meet” or “Exceeded” in response to the questions below.

A. Management:

Did Not Meet* Met Exceeded*

A1. Communicated with Government team and with on-site supervisors to ensure accurate/timely information flow.

A2. Required minimal Government direction regarding contract and technical requirements already available to them (i.e. they read/understand the contract in its entirety).

Remarks:

B. Schedule Did Not Meet* Met Exceeded*

B1. Adhered to contract performance schedule, to include timely submission of submittals, close-outs, etc.

B2. Contractor was responsive to warranty calls and quickly fixed legitimate problems.

Remarks:

C. Cost Control Did Not Meet* Met Exceeded*

E4. Met and performed within originally awarded contract costs.

E5. Alerted Government of potential unforseen costs/changes before they occur, and submitted cost proposals timely.

Remarks:

D. Quality Did Not Meet* Met Exceeded*

F1. Complied with quality control plan and followed contract quality assurance requirements.

F2. Complied with technical requirements and contract specifications.

Remarks:

Evaluator’s Signature Date

F3. Ensured poor performance by subcontractors or in-house personnel is not repeated.

SECTION 1: CONTRACT IDENTIFICATION
SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION
SECTION 3: EVALUATOR IDENTIFICATION
SECTION 4: EVALUATION
B. Schedule

File details come from the government source that posted it. Updated .