Phase_II_Q&A.pdf
PDF 225 KB Posted
- Attached to
- Repair Hangar Fire Suppression System Federal contract opportunity
- Solicitation number
- FA4855-17-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Phase_II_Q&A_-_Part_2.pdf | ||
| Atch_15-Past_Performance_Questionnaire.pdf | ||
| FP-2_Demo_FP_Zone_1.PDF | ||
| FP-3_Demo_FP_Spray_Booth_Hanger_1.PDF | ||
| FP-1_Demo_FP_Zones_2_&_3.PDF | ||
| FP-4_Demo_FP_Hangers_2_&_3.PDF | ||
| Questions_and_Answers.pdf | ||
| Atch_11_-_AEC_CAD_Standard_TR-12-X_R-6.pdf | ||
| Atch_9-CAFB_DDC_Requirements_Guide_-_Sep_2014.pdf | ||
| Atch_2-SOMS.pdf | ||
| Atch_14-Entry_Authorization_List.pdf | ||
| Atch_8-CAFB_Hardware_Specifications_Guideline-_2011.pdf | ||
| Atch_13-CAFB_Environment_Guide_2015.pdf | ||
| Atch_6-CAFB_Architec_Compat_Guide-2013.pdf | ||
| Atch_12-As-Built_Submittal_Guidelines.pdf | ||
| FA4855-17-R-0003.pdf | ||
| Atch_7-CANNONAFBI32_201_Fire_Protection.pdf | ||
| Atch_10-CAFB_Labeling_Standards__2009_Rev1.pptx | PPTX presentation | |
| Atch_4-CAFB_Electrical_Standards-2016.pdf | ||
| Atch_5-Contractor_Base_Briefing_Pamphlet_(March_2016).pdf | ||
| Atch_1-SOO.pdf | ||
| Atch_3-WDNM23.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4855-17-R-0003 H199 Phase II Questions
1. Is B199 - Bay 3 equipped with Heating units?
Answer: Yes
2. If so, are they of sufficient capacity to maintain the bay above 40 degrees?
3. If so, are they thermostatically controlled?
4. We request access to the two Mechanical rooms where the sprinkler valves are located. They have outside access and no way to enter the Hangar Bays.
Answer: CE will provide access to the mechanical rooms by request.
5. "The Phase 2, Part II Technical Proposal (a) calls for including specifications. Since the submittal is limited to 30 pages, we need clarification because all the specifications would require substantially many more than 30 pages."
Answer: A Specification table of contents with the proposed specifications to be submitted shall be included in lieu of the entire specification content. A Riser Diagrams Detail and a table of contents with the supplemental proposed drawings will be acceptable for the 30% design submission.
6. Could you send a request in to obtain sheets FP 5 & 6 of the AS-Builts. We only received sheets FP1 – FP4 previously. Since we are not getting access to the building it is imperative that we get a copy of these drawings.
Answer: FP 5 & 6 were not archived and are not available.
7. What is the current make and model of Fire Alarm Control Panel that is installed?
Answer: Fike Cheetah Classic
8. Is a Mass Notification System currently (MNS) installed?
Answer: No - A Monaco BTXFM would be required to interface with the existing transmitter for
MNS
9. Is a transceiver currently installed to transmit all signals directly to the fire department? If so, Make and Model?
Answer: Monaco Bt2-7. It is not compatible for use with mass notification. A Monaco BTXFM would be needed for MNS.