Atch_2-SOMS.pdf

PDF 17 KB Posted

Attached to
Repair Hangar Fire Suppression System Federal contract opportunity
Solicitation number
FA4855-17-R-0003
Issued by
Department of the Air Force Special Operations Command

About this file

Atch 2: SOMS

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM, DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S / C

O L

O R

S E

L E

C T

T E

ST

R

E

SU

L T

S

M A

N F'

R R

E C

O M

M E

N D

A T

IO

N

S

M A

N F'

R . W

A R

R A

N T

Y

L

IC

E N

SE

D

A

PP

L

IC

A T

O R

E L

E C

T R

O N

IC

F

IL

E

(E M

A

IL

E D

T

O C

O N

S)

E L

E C

T R

O N

IC

F

IL

E

S( C

D

PR

IN

T E

D C

O

PI

E S

R E

Q U

IR

SU

B M

IS

SI

O N

D A

T E

D A

T E

R E

C E

IV

IN

C O

N T

R A

C T

IN

G

D A

T E

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

FO

L

L O

W -U

P

C O

N T

R A

C T

O R

N O

T

IF

IE

A pp ro va l D at e

C O

N T

R A

C T

O R

N O

T

IF

IE

D

D is ap pr ov al D at e

C O

N T

R A

C T

R

-S U

B M

IT

T

A L

FI

N

A L

A

PP

R O

V A

L

R E

M A

R K

S

1 DESIGN PROJECT SCHEDULE- AF3064

AND GANTT CHART (SOO §11.1.) 1 Within 7 calendar days of

NTP

MEETING MINUTES FROM KICK OFF

MEETING/ PRE-DESIGN MEETING

(SOO §7.)

1 Within 7 calendar days of meeting occurrence.

SITE SURVEY OF EXISTING

CONDITIONS MEETING MINUTES

(SOO §11.2.1.)

1 Within 7 calendar days of meeting occurrence.

4 DESIGN QUALITY CONTROL PLAN

(SOO §11.3.) 1 1 Within 7 calendar days of

NTP

35% DESIGN PACKAGE (SOO §11.4.1.)

Statement of Work (SOW), Design Analysis, Schedule of Material Submittals (SOMS) and Drawings are required.

***Government will have 14 calendar days for review and provide comments.

Contractor will then be allotted 14 calendar days to incorporate comment in the next phase of design ***

1 1 21 calendar days after NTP

6 35% DESIGN REVIEW COMMENT

MATRIX RESPONSES (SOO §11.5.) 1

Within 7 calendar days review documents have been returned.

Optional 35% DESIGN PHASE

MEETING MINUTES (SOO §11.6.)

***Only required if meeting occurs****

1 Within 7 calendar days of meeting occurrence.

65% DESIGN PACKAGE (SOO §11.4.2.)

Statement of Work (SOW), Design Analysis, Schedule of Material Submittals (SOMS) and Drawings are required.

***Government will have 14 calendar days for review and provide comments.

Contractor will then be allotted 14 calendar days to incorporate comment in the next phase of design ***

1 1 49 calendar days after NTP

9 65% DESIGN REVIEW COMMENT

MATRIX RESPONSES (SOO §11.5.) 1

Within 7 calendar days review documents have been returned.

NUMBER OF COPIES REQUIRED

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS

PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.

CZQZ-15-0012 REPAIR FIRE

PROTECTION IN B199

TO BE COMPLETED BY PROJECT ENGINEER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM, DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S / C

O L

O R

S E

L E

C T

T E

ST

R

E

SU

L T

S

M A

N F'

R R

E C

O M

M E

N D

A T

IO

N

S

M A

N F'

R . W

A R

R A

N T

Y

L

IC

E N

SE

D

A

PP

L

IC

A T

O R

E L

E C

T R

O N

IC

F

IL

E

(E M

A

IL

C

O N

S)

E L

E C

T R

O N

IC

F

IL

E

S( C

D

PR

IN

T E

D C

O

PI

E S

R E

Q U

IR

SU

B M

IS

SI

O N

D A

T E

D A

T E

R E

C E

IV

IN

O

N T

R A

C T

IN

G

D A

T E

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

FO

L

L O

W -U

P

C O

N T

R A

C T

O R

N O

T

IF

IE

A pp ro va l D at e

C O

N T

R A

C T

O R

N O

T

IF

IE

D

D is ap pr ov al D at e

C O

N T

R A

C T

-S U

B M

IT

T

A L

FI

N

A L

A

PP

R O

V A

L

R E

M A

R K

S

NUMBER OF COPIES REQUIRED

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS

PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.

CZQZ-15-0012 REPAIR FIRE

PROTECTION IN B199

TO BE COMPLETED BY PROJECT ENGINEER

Optional 65% DESIGN PHASE

MEETING MINUTES (SOO §11.6.)

***Only required if meeting occurs****

1 Within 7 calendar days of meeting occurrence.

95% DESIGN PACKAGE (SOO §11.4.3.)

Statement of Work (SOW), Design Analysis, Schedule of Material Submittals (SOMS) and Drawings are required.

***Government will have 14 calendar days for review and provide comments.

Contractor will then be allotted 14 calendar days to incorporate comment in the next phase of design ***

1 1 77 calendar days after NTP

12 95% DESIGN REVIEW COMMENT

MATRIX RESPONSES (SOO §11.5.) 1

Within 7 calendar days review documents have been returned.

Optional 95% DESIGN PHASE

MEETING MINUTES (SOO §11.6.)

***Only required if meeting occurs****

1 Within 7 calendar days of meeting occurrence.

100%/FINAL "ISSUE FOR

CONSTRUCTION" PACKAGE (SOO

§11.4.4) Statement of Work (SOW), Design Analysis, Schedule of Material Submittals (SOMS) and Drawings (1 half size and 1 full size) are required.

1 2 105 calendar days after

NTP

CONSTRUCTION PROJECT

SCHEDULE- AF3064 AND GANTT

CHART (SOO §26.1.)

Within 7 calendar days after 100% Design Package Approval

16 CONSTRUCTION QUALITY CONTROL

PLAN (SOO §26.2.) 1 1

Within 7 calendar days after 100% Design Package

Approval