Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf

PDF 2 MB Posted

Attached to
Chavez CDC Post Inspection ATFP Upgrades
Solicitation number
FA4855-16-B-0021
Issued by

About this file

Updated Drawings

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Main gate/Entry Control Point

Portales Gate

Chavez Housing

Contracting

Chavez gate/Entry Control Point

S O

W 3.

5/ 3.

5.

D em ol is h ex is tin g w al l

In st al ln ew 8' hi gh fa br ic fe nc e w ith ou tri gg er s

W 3.

5/ 3.

5.

D em ol is h ex is tin g w al l

In st al ln ew 8' hi gh fa br ic fe nc e w ith ou tri gg er s

S O

W 3.

S aw cu t6 op en in g in ex is tin g w al l do w n to fo ot in g to al lo w a la w n m ow er in to ar ea .T he re st of th e cu rv ed w al li s to re m ai n.

N ew

M ex ic o

D riv e

W 3.

5/ 3.

5.

D em ol is h ex is tin g w al l

In st al ln ew 6' hi gh w al l

W al lt o re m ai n ex ce pt 6' op en in g

S O

W 3.

S aw cu t6 op en in g in ex is tin g w al l do w n to fo ot in g to al lo w a la w n m ow er in to ar ea .T he re st of th e cu rv ed po rti on of w al lt o re m ai n.

W al lt o re m ai n ex ce pt 6' op en in g

S O

W 3.

S aw cu t6 op en in g in ex is tin g w al l do w n to fo ot in g to al lo w a la w n m ow er in to ar ea

S O

W 3.

In st al ln ew m et al do ub le sw in g ga te s

N ew

M ex ic o

D riv

W 3.

In st al l ne w m et al do ub le sw in g ga te s

S O

W 3.

G at e st yl e to be m at ch ed

S O

W 3.

B ric k pi la st er an d ro d iro n fe nc e to m at ch m ai n ba se ga te en tra nc e

S O

W 3.

8B ric k pi la st er an d ro d iro n fe nc e to m at ch m ai n ba se ga te en tra nc e

O pt io n

1:

Fo ur ro d iro n ga te s m an ua lly op er at ed

S O

W 3.

8.

N ew

6' w id e ro d iro n pe rs on ne lg at e

S O

W 3.

8.

N ew

6' w id e ro d iro n pe rs on ne lg at pt io n

4:

S

O W

3.

3/

3.

3.

S w in g ar m ga te

O pt io n

3:

S

O W

3.

3/

3.

3.

D ou bl e sw in g ar m ga te w ith re m ov ab le bo lla rd in ce nt er

W 3.

E xi st in g

M as s N ot ifi ca tio n S ys te m

S O

W 3.

In st al lM as s N ot ifi ca tio n S ys te m on w al lb eh in d re ce pt io ni st s de sk

S O

W 3.

In st al l ne w do ub le sw in g do or s pt io n

2:

S

O W

3.

Typical Removable Steel Bollard – Detail 1

Typical Removable Steel Bollard – Detail 2

G A

LV

S

TE

E L P

IP

E

B O

LL

A R D S E E

P

LA

N S

F O R

S

IZ

E

A N D

LO

C A

TI

O N

P A

IN

T S A F E

TY

Y E

LL

O W

C

LO

S E D

C E

LL

F O A M

E X P A N S

IO

N w

S E A

LA

N T

C O N C S

LA

B

O N

G R A N U

LA

R

B A S E

(S E E

P

LA

N

C O N C R E

TE

F

IL

L

C O N C R E

TE

F O O

TI

N G

4'-0"

1" MAX.

3'-6"

6"

E Q

E Q

G R A D E

(S E E

C

IV

IL

'-0"

D O W E

LS

O .C

(A

LT

E R N A

TE

S

ID

E S

C O N C F O O

TI

N G

(3

C O N T.

C .M .U W A

LL

R E

IN

F w

O .C V E R T.

G R O U T

C E

LL

S

S O

LI

D

A T R E

IN

F

T.

O P A V E M E N T

1'-0"8"'-0"

'-8"

F

C E

C .M .U

S P

LI

T F A C E

C .M .U

F

C E

C .M .U

B O N D

B E A M

AS

C A S T S

TO

N E

C A P w

D R

IP

S

S H

IM

A S

R E Q 'D

S .S A N C H O R

(S E A L A T

P E N E

TR

A

TI

O N S

IN

F

LA

S H

IN

G A N C H O R

B Y

C A S T S

TO

N E

M A N U F

C .M .U

B O N D

B E A M

S .S F

LA

S H

IN

G

2 1/2"1 1/2"

C .M .U R E

IN

F

D R

IP

IN

C A S T

S

TO

N E

TY

P

S C A

LE

A S

P

IP

E

B O

LL

A R D

D E

TA

IL

S C A

LE

A S

S E C

TI

O N

S C A

LE

A S

C A S T S

TO

N E

D E

TA

IL

File details come from the government source that posted it. Updated .