SOMS_-_CZQZ160053__30_June_16.pdf

PDF 157 KB Posted

Attached to
Chavez CDC Post Inspection ATFP Upgrades Federal contract opportunity
Solicitation number
FA4855-16-B-0021
Issued by
Department of the Air Force Special Operations Command

About this file

Schedule of Material Submittals (SOMS)

View the file

Other files for this federal contract opportunity

Other files attached to Chavez CDC Post Inspection ATFP Upgrades, newest first.
File Type Posted
FA4855-16-B-0021_SF1409.pdf PDF
ChavezATFP_Q As_Part_2.pdf PDF
SOW_Para_3.7_Picture.jpg JPG image
Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf PDF
ChavezAFTP_Questions_and_Answers.pdf PDF
FA4855-16-B-0021-0001_Priority_Changes.pdf PDF
SOW_-_CZQZ160053_CDC_ATFP_Upgrades_-_1_Sep_16.pdf PDF
WD_NM_23.txt TXT text file
SOW_-_CZQZ160053_CDC_ATFP_Upgrades.pdf PDF
EAL_Chavez_ATFP.docx DOCX document
Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf PDF
Specs_-_CZQZ160053_CDC_ATFP_Upgrades_w_options_30_June_16.pdf PDF
SOMS_-_CZQZ160053__30_June_16.pdf PDF
FA4855-16-B-0021 _Chavez_ATFP.pdf PDF
SOW_-_CZQZ160053_CDC_ATFP_Upgrades.pdf PDF
WD_NM_23.txt TXT text file
Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf PDF
Specs_-_CZQZ160053_CDC_ATFP_Upgrades_w_options_30_June_16.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES

FA4855

Chavez CDC Post Chattanooga ATFP Upgrades

01 33 00 SD-01 Preconstruction Submittals

1.7Submittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

01 78 00 SD-03 Product Data

Warranty Management Plan

1.5.3Warranty Tags

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

Instructions

SD-10 Operation and Maintenance

Data

3.3 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2 GRecord Drawings

As-Built Record of Equipment and Materials

Final Approved Shop Drawings

Construction Contract

Specifications

GCertification of EPA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

01 78 23 SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.2.1 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

Receipts

03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

2.3.3Field-Molded Type

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

03 20 00.00 10 SD-01 Preconstruction Submittals

GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

03 20 00.00 10 2.3Reinforcing Steel

1.3.1Qualified Welders

1.3.2Qualification of Steel Bar

Butt-Splicers

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

GForm Removal Schedule

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.7Joint Sealants

2.4.6Joint Filler

2.1Materials for Forms

Recycled Aggregate Materials

2.4.1Cementitious Materials

Vapor Retarder

2.3.3Concrete Curing Materials

2.5Reinforcement

Liquid Chemical Floor Hardener

2.4.5Admixtures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

03 30 00 Mechanical Reinforcing Bar

Connectors

2.2.1Waterstops

SD-05 Design Data

2.3.1 GMix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Ground Granulated Blast-Furnace

Slag

2.4.3Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.4Air Content

3.13.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

1.9Welder Qualifications

Material Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

Liquid Chemical Floor Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

03 30 00 2.3.3Curing Compound

04 20 00 SD-02 Shop Drawings

GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

GConcrete Brick

GDimension Stone Units

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

SD-06 Test Reports

2.2.2.1.3Efflorescence Test

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

04 20 00 2.2.3.2Concrete Masonry Units (CMU)

Concrete Brick

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

Take-Back Program

05 50 13 SD-02 Shop Drawings

2.4 GStructural Steel Door Frames

GAccess Doors and Panels

GCover Plates and Frames

GExpansion Joint Covers

GFloor Gratings and Roof

Walkways

GWheel Guards

GWindow[ And Door] Guards

GAngles and Plates

GRoof Hatch

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

05 50 13 Access Doors and Panels

Cover Plates and Frames

Control-Joint Covers

Expansion Joint Covers

Floor Gratings and Roof

Walkways

2.4Structural Steel Door Frames

Wheel Guards

Window[ and Door] Guards

Roof Hatch

SD-04 Samples

Expansion Joint Covers

Control-Joint Covers

05 72 00 SD-01 Preconstruction Submittals

1.3.3 GExisting Conditions

SD-02 Shop Drawings

1.3.1 GOrnamental Metal Items

2.1 GInstallation Drawings

2.1 GShop and Field Connections

2.1 GConstruction Details

SD-03 Product Data

2.2 GMaterials

2.3Fabrication

1.3.1 GOrnamental Metal Items

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

05 72 00 1.3.1 GManufacturer's Standard Color

Charts

1.3.1Shop Paint

1.3.1 GFinish Paint

Aluminum Finishes

2.2Anchorage Devices and

Fasteners

Architectural Metal Items

SD-06 Test Reports

Welding Tests

SD-07 Certificates

Welding Procedures

1.3.1Ornamental Metal Items

GWelder Qualifications

SD-08 Manufacturer’s Instructions

3.3Cleaning Materials

3.3Preventative Maintenance and

Inspection

3.4 GMaintenance Instructions

3.3 GApplication Methods

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.11 GKeying System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

08 71 00 2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

28 31 76 SD-02 Shop Drawings

2.1.2 GNameplates

2.17.9 GInstructions

3.2.1 GWiring Diagrams

1.2.1 GSystem Layout

2.3 GSystem Operation

2.22 GNotification Appliances

2.18 GAmplifiers

SD-03 Product Data

1.6 GTechnical Data And Computer

Software

2.16 GFire Alarm Control Unit and Mass

Notification Control Unit (FMCP)

2.19 GLCD, LED Display Unit (VDU)

3.2.2 GTerminal Cabinets

2.21 GManual Stations

2.25 GTransmitters

2.15.1 GBatteries

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

28 31 76 2.15.2 GBattery Chargers

2.10 GSmoke Sensors

2.11 GHeat Detectors

2.22 GNotification Appliances

2.7 GAddressable Interface Devices

2.18 GAmplifiers

2.18 GTone Generators

2.18 GDigitalized Voice Generators

2.17 GRemote Fire Alarm/Mass

Notification Control Units

2.25.1 GRadio Transmitter and Interface

Panels

2.25.2 GDigital Alarm Communicator

Transmitter (DACT)

1.4.4 GLocal Operating Console (LOC)

SD-05 Design Data

2.15.1.2 GBattery Power

2.15.2 GBattery Chargers

SD-06 Test Reports

3.7Field Quality Control

3.7.1 GTesting Procedures

2.10.6 GSmoke Sensor Testing

SD-07 Certificates

1.7.1.4Installer

3.7.2.2Formal Inspection and Tests

3.7.2.3Final Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

28 31 76 SD-09 Manufacturer’s Field

Reports

2.3 GSystem Operation

1.7.2.2Fire Alarm/Mass Notification

System

SD-10 Operation and Maintenance

Data

3.10 GOperation and Maintenance

(O&M) Instructions

3.8 GInstruction of Government

Employees

SD-11 Closeout Submittals

3.7.2.4As-Built Drawings

31 00 00 SD-03 Product Data

3.7Utilization of Excavated Materials

Shoulder Construction

SD-06 Test Reports

Testing

SD-07 Certificates

Testing

32 11 24 SD-03 Product Data

2.1.1Aggregates

SD-06 Test Reports

3.6.2.1Gradation

3.6.2.1Gradation

2.1.1Bearing ratio

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

32 11 24 2.1.1Liquid limit

2.1.1Plasticity index

2.1.1Percentage of wear

3.6.2.3Density

3.6.2.3Density

3.6.2.2Smoothness

3.6.2.5Thickness

32 31 13 SD-02 Shop Drawings

1.3Fence Assembly

Location of Corner, End, and Pull

Posts

1.3Erection/Installation Drawings

SD-03 Product Data

1.3 GFence Assembly

2.2Zinc Coating

2.3 GFabric

2.10Stretcher Bars

2.15 GConcrete

SD-04 Samples

2.3Fabric

Posts

Braces

2.5Line Posts

2.9Tension Wire

2.10Stretcher Bars

2.14Wire Ties

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES

Chavez CDC Post Chattanooga ATFP Upgrades

32 31 13 SD-07 Certificates

1.5.2Certificates of Compliance

SD-08 Manufacturer’s Instructions

1.3 GFence Assembly

1.3Hardware Assembly

1.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .