SOMS_-_CZQZ160053__30_June_16.pdf
PDF 157 KB Posted
- Attached to
- Chavez CDC Post Inspection ATFP Upgrades Federal contract opportunity
- Solicitation number
- FA4855-16-B-0021
About this file
Schedule of Material Submittals (SOMS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0021_SF1409.pdf | ||
| ChavezATFP_Q As_Part_2.pdf | ||
| SOW_Para_3.7_Picture.jpg | JPG image | |
| Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf | ||
| ChavezAFTP_Questions_and_Answers.pdf | ||
| FA4855-16-B-0021-0001_Priority_Changes.pdf | ||
| SOW_-_CZQZ160053_CDC_ATFP_Upgrades_-_1_Sep_16.pdf | ||
| WD_NM_23.txt | TXT text file | |
| SOW_-_CZQZ160053_CDC_ATFP_Upgrades.pdf | ||
| EAL_Chavez_ATFP.docx | DOCX document | |
| Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf | ||
| Specs_-_CZQZ160053_CDC_ATFP_Upgrades_w_options_30_June_16.pdf | ||
| SOMS_-_CZQZ160053__30_June_16.pdf | ||
| FA4855-16-B-0021 _Chavez_ATFP.pdf | ||
| SOW_-_CZQZ160053_CDC_ATFP_Upgrades.pdf | ||
| WD_NM_23.txt | TXT text file | |
| Drawings_-_CZQZ16-0053_Chavez_CDC_ATFP_Upgrades.pdf | ||
| Specs_-_CZQZ160053_CDC_ATFP_Upgrades_w_options_30_June_16.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES
FA4855
Chavez CDC Post Chattanooga ATFP Upgrades
01 33 00 SD-01 Preconstruction Submittals
1.7Submittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
1.6Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
01 78 00 SD-03 Product Data
Warranty Management Plan
1.5.3Warranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
As-Built Record of Equipment and Materials
Final Approved Shop Drawings
Construction Contract
Specifications
GCertification of EPA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
01 78 23 SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.2.1 GDeconstruction Plan
1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
Receipts
03 15 00.00 10 SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
2.3.3Field-Molded Type
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
03 20 00.00 10 SD-01 Preconstruction Submittals
GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
03 20 00.00 10 2.3Reinforcing Steel
1.3.1Qualified Welders
1.3.2Qualification of Steel Bar
Butt-Splicers
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
GForm Removal Schedule
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.7Joint Sealants
2.4.6Joint Filler
2.1Materials for Forms
Recycled Aggregate Materials
2.4.1Cementitious Materials
Vapor Retarder
2.3.3Concrete Curing Materials
2.5Reinforcement
Liquid Chemical Floor Hardener
2.4.5Admixtures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
03 30 00 Mechanical Reinforcing Bar
Connectors
2.2.1Waterstops
SD-05 Design Data
2.3.1 GMix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Ground Granulated Blast-Furnace
Slag
2.4.3Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.4Air Content
3.13.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
1.9Welder Qualifications
Material Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
Liquid Chemical Floor Hardener
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
03 30 00 2.3.3Curing Compound
04 20 00 SD-02 Shop Drawings
GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
GConcrete Brick
GDimension Stone Units
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
04 20 00 2.2.3.2Concrete Masonry Units (CMU)
Concrete Brick
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
Take-Back Program
05 50 13 SD-02 Shop Drawings
2.4 GStructural Steel Door Frames
GAccess Doors and Panels
GCover Plates and Frames
GExpansion Joint Covers
GFloor Gratings and Roof
Walkways
GWheel Guards
GWindow[ And Door] Guards
GAngles and Plates
GRoof Hatch
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
05 50 13 Access Doors and Panels
Cover Plates and Frames
Control-Joint Covers
Expansion Joint Covers
Floor Gratings and Roof
Walkways
2.4Structural Steel Door Frames
Wheel Guards
Window[ and Door] Guards
Roof Hatch
SD-04 Samples
Expansion Joint Covers
Control-Joint Covers
05 72 00 SD-01 Preconstruction Submittals
1.3.3 GExisting Conditions
SD-02 Shop Drawings
1.3.1 GOrnamental Metal Items
2.1 GInstallation Drawings
2.1 GShop and Field Connections
2.1 GConstruction Details
SD-03 Product Data
2.2 GMaterials
2.3Fabrication
1.3.1 GOrnamental Metal Items
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
05 72 00 1.3.1 GManufacturer's Standard Color
Charts
1.3.1Shop Paint
1.3.1 GFinish Paint
Aluminum Finishes
2.2Anchorage Devices and
Fasteners
Architectural Metal Items
SD-06 Test Reports
Welding Tests
SD-07 Certificates
Welding Procedures
1.3.1Ornamental Metal Items
GWelder Qualifications
SD-08 Manufacturer’s Instructions
3.3Cleaning Materials
3.3Preventative Maintenance and
Inspection
3.4 GMaintenance Instructions
3.3 GApplication Methods
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.11 GKeying System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
08 71 00 2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
28 31 76 SD-02 Shop Drawings
2.1.2 GNameplates
2.17.9 GInstructions
3.2.1 GWiring Diagrams
1.2.1 GSystem Layout
2.3 GSystem Operation
2.22 GNotification Appliances
2.18 GAmplifiers
SD-03 Product Data
1.6 GTechnical Data And Computer
Software
2.16 GFire Alarm Control Unit and Mass
Notification Control Unit (FMCP)
2.19 GLCD, LED Display Unit (VDU)
3.2.2 GTerminal Cabinets
2.21 GManual Stations
2.25 GTransmitters
2.15.1 GBatteries
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
28 31 76 2.15.2 GBattery Chargers
2.10 GSmoke Sensors
2.11 GHeat Detectors
2.22 GNotification Appliances
2.7 GAddressable Interface Devices
2.18 GAmplifiers
2.18 GTone Generators
2.18 GDigitalized Voice Generators
2.17 GRemote Fire Alarm/Mass
Notification Control Units
2.25.1 GRadio Transmitter and Interface
Panels
2.25.2 GDigital Alarm Communicator
Transmitter (DACT)
1.4.4 GLocal Operating Console (LOC)
SD-05 Design Data
2.15.1.2 GBattery Power
2.15.2 GBattery Chargers
SD-06 Test Reports
3.7Field Quality Control
3.7.1 GTesting Procedures
2.10.6 GSmoke Sensor Testing
SD-07 Certificates
1.7.1.4Installer
3.7.2.2Formal Inspection and Tests
3.7.2.3Final Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
28 31 76 SD-09 Manufacturer’s Field
Reports
2.3 GSystem Operation
1.7.2.2Fire Alarm/Mass Notification
System
SD-10 Operation and Maintenance
Data
3.10 GOperation and Maintenance
(O&M) Instructions
3.8 GInstruction of Government
Employees
SD-11 Closeout Submittals
3.7.2.4As-Built Drawings
31 00 00 SD-03 Product Data
3.7Utilization of Excavated Materials
Shoulder Construction
SD-06 Test Reports
Testing
SD-07 Certificates
Testing
32 11 24 SD-03 Product Data
2.1.1Aggregates
SD-06 Test Reports
3.6.2.1Gradation
3.6.2.1Gradation
2.1.1Bearing ratio
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
32 11 24 2.1.1Liquid limit
2.1.1Plasticity index
2.1.1Percentage of wear
3.6.2.3Density
3.6.2.3Density
3.6.2.2Smoothness
3.6.2.5Thickness
32 31 13 SD-02 Shop Drawings
1.3Fence Assembly
Location of Corner, End, and Pull
Posts
1.3Erection/Installation Drawings
SD-03 Product Data
1.3 GFence Assembly
2.2Zinc Coating
2.3 GFabric
2.10Stretcher Bars
2.15 GConcrete
SD-04 Samples
2.3Fabric
Posts
Braces
2.5Line Posts
2.9Tension Wire
2.10Stretcher Bars
2.14Wire Ties
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES
Chavez CDC Post Chattanooga ATFP Upgrades
32 31 13 SD-07 Certificates
1.5.2Certificates of Compliance
SD-08 Manufacturer’s Instructions
1.3 GFence Assembly
1.3Hardware Assembly
1.3Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .