Seymour Johnson AFB B4916 Questions 1 of 2

1. What AF requirement does this area need to meet? Open storage secret.

2. Is there conduit present from the IDS/ACS/Camera locations back to the ACS V5 Panel location? If not, will this need to be installed by contractor? Not present, contractor will need to install.

3. Is there conduit present from the ACS V5 panel location to the GFE switch location? If not, will this need to be installed by contractor? Not present, contractor will need to install.

4. Is there conduit present form the Vindicator Badge Manger (VBM) and Video Management Systems (VMS) to the GFE switch location? If not, will this need to be installed by contractor? Not present, contractor will need to install.

5. Are rooms W128A and W131 false ceiling locations, if so what are the heights of these ceilings? The simulator in W131 is 15ft tall and the ceiling is 29ft 5in. The simulator in W128A is 25ft tall and the ceiling is 47ft 2in. Both ceilings are open to the rafters.

6. What are the ceiling heights and type of ceilings for all remaining PIR locations? Drop ceilings which are 10ft high.

7. Is there generator or UPS support for this installation? No. An 8 hour battery back-up for the V5 is needed in the V5 enclosure.

8. For the VBM, to what level of design is required for the area badges? Please elaborate question.

9. Do the BMS box tampers need to be on their own alarm inputs or can they be installed using multi-state resistors for their tamper annunciations? No specified requirement.

10. For the VMS, does this need to be a system that is also on the Approved List? If so, can you provide the most recent government approved equipment list documentation? List provided.

11. This addition is to install the STC40 rated door not the bring the walls of the area or around the replacement door location to meet the same STC40 rating, correct? Correct.

12. File labeled ‘JA Bldg 4916 IDS Redacted’, the quantities identified in this document for the description of the supplies/services required do not seem to match that of what is described in the Statement of Work (SOW). Refer to the SOW, J&A does not govern the requirement.

13. SOW section 3 Description, states that the contractor is to install two (2) STC-40 rated doors at the desired locations (W116 and X136). However it reads as if we are only to ensure that door W116 has an X-10 lock, shouldn’t both of these doors have an X-10 lock? Yes, the existing door at W136 currently has a X-10 lock.