Atch 2 General Decision Number.doc

DOC document 42 KB Posted

Attached to
Demolish Family Housing Units
Solicitation number
FA4809-08-R-0005
Issued by

About this file

General Decision Attachment 2 Sollicitation FA4809-08-R-0005 Demolish Military Family Housing Units Project VKAG 07-5012PQ/P2

View the file

Other files

File Type Posted
Amendment 0004.doc DOC document
Question and Answers for FA480908R0005.doc DOC document
Amendment 0003 dated 15 May 08.doc DOC document
Atch 3 revised PP Questionairre 1 May 08.doc DOC document
Assessment Atch 1 to Specifications.pdf PDF
Amendment 0002 dated 01 May 08.doc DOC document
SV_Sign_.pdf PDF
Amendment 0001.doc DOC document
Atch 3 PP Questionairre.doc DOC document
Atch 5 Sh 12 of 14 VKAG 07-5012P1 A-10 EM-4 DEMOLITION ELEVATION PLAN —
Atch 5 Sh 7 of 14 VKAG 07-5012P1 A-5 EM-2 DEMOLITION PLAN —
Atch 7 Schedule of Mat Subs.xls XLS spreadsheet
Atch 6 Sh 5 of 6 VKAG 07-5012P2 A-3 3 BEDROOM DEMOLITION PLAN —
Atch 6 Sh 6 of 6 VKAG 07-5012P2 A-4 3 BEDROOM DEMOLITION ELEVATIONS —
Atch 5 Sh 3 of 14 VKAG 07-5012P1 A-1 2 BEDROOM DEMOLITION PLAN —
Atch 5 Drawing Sh 2 of 14 P1 C1.pdf PDF
Atch 5 Sh 6 of 14 VKAG 07-5012P1 A-4 3 BEDROOM DEMOLITION ELEVATIONS —
Cover Sheet and Instructions for RFP .doc DOC document
Atch 5 Drawing Sh 1 of 14 Loc Plan.pdf PDF
Atch 6 Sh 2 of 6 VKAG 07-5012P2 C-1 Layout1 —
Atch 5 Sh 8 of 14 VKAG 07-5012P1 A-6 EM-2 DEMOLITION ELEVATION PLAN —
Atch 6 Sh 1 of 6 VKAG 07-5012P2 G-1 LOCATION PLAN —
Atch 5 Drawing Sh 9 of 14 VKAG 07-5012P1 A-7 EM-3 DEMOLITION PLAN —
VKAG Atch 6 Sh 4 of 6 07-5012P2 A-2 2 BEDROOM DEMOLITION ELEVATIONS —
Atch 5 Sh 4 of 14 VKAG 07-5012P1 A-2 2 BEDROOM DEMOLITION ELEVATIONS —
Atch 5 Sh 13 of 14 VKAG 07-5012P1 A-11 EM-4A DEMOLITION PLAN —
Atch 5 Drawing Sh 11 of 14 VKAG 07-5012P1 A-9 EM-4 DEMOLITION PLAN —
Atch 5 Sh 5 of 14 VKAG 07-5012P1 A-3 3 BEDROOM DEMOLITION PLAN —
Atch 6 Sh 3 of 6 VKAG 07-5012P2 A-1 2 BEDROOM DEMOLITION PLAN —
Atch 5 Sh 14 of 14 VKAG 07 5012P1 A-12 EM-4A DEMOLITION ELEVATION PLAN —
Atch 5 Drawing Sh 10 of 14 P1 A-8 EM-3 DEMOLITION ELEVATION PLAN —
Atch 1 Specifications.doc DOC document
FA4809-08-R-0005.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP NO.: FA4809-08-R-0005

Attachment 2

General Decision Number: NC080022 02/08/2008 NC22

Superseded General Decision Number: NC20070022

State: North Carolina

Construction Type: Residential

Counties: Edgecombe, Greene, Halifax, Johnston, Lenoir, Nash, Pitt, Wayne and Wilson Counties in North Carolina.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date

0 02/08/2008

* SUNC1983-007 09/01/1983

Rates Fringes

Bricklayer.......................$ 7.18

Carpenter........................$ 6.00

Carpet Installers & Soft

Floor Layers.....................$ 7.41

Cement Mason.....................$ 6.11

Drywall Finisher.................$ 7.11

Drywall Hanger...................$ 6.92

Electrician......................$ 6.31

Glazier..........................$ 6.91

Insulation Installer.............$ 5.85

Laborers:

Asphalt Raker...............$ 5.85

Mason Tender................$ 5.85

Pipelayer...................$ 5.85

Unskilled...................$ 5.85

Painter..........................$ 6.00

Plumbers and Pipefitters.........$ 6.82

Power equipment operators:

Backhoe.....................$ 5.97

Bulldozer...................$ 6.11

Distributor.................$ 5.85

Dragline....................$ 5.85

Forklift....................$ 5.85

Loader......................$ 5.91

Motor Grader................$ 7.00

Roller......................$ 5.85

Roofer...........................$ 6.34

Sheet metal worker...............$ 5.85

Tile Setter......................$ 6.85

Truck Driver.....................$ 5.85

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION