Attach_2_-_Submittal_Schedule-Repair_Roof_Bldg_1440.pdf

PDF 60 KB Posted

Attached to
BLDG 1440 ROOF MAFB, MT
Solicitation number
FA4626-15-R-0009
Issued by

About this file

Attachment 2-Submittal Schedule

View the file

Other files

File Type Posted
Additional_Q.docx DOCX document
q a's.docx DOCX document
Conformed_copy_of_1440_Roof_Repair.pdf PDF
Amendment_2_Changes.pdf PDF
Questions_and_Answers.docx DOCX document
Amendment_01.pdf PDF
AMENDED_-_075323__-_ethylene-propylene-diene-monomer_(epdm)_roofing.pdf PDF
Past_Performance_clarification.docx DOCX document
Questions_and_Answers.docx DOCX document
Pg-44.pdf PDF
Pg-42.pdf PDF
Pg-43.pdf PDF
Meeting_mins_Roof_1440.pdf PDF
Attach_6-_Base_Entry_Policy_Letter.pdf PDF
Attach_5-WDOL.pdf PDF
FA4626-15-R-0009.pdf PDF
Attach_3_-_Drawings.pdf PDF
Attach_4-Schedule_of_Drawings_-_Bid_Doc_1440.pdf PDF
Attach_7-_Past_Performance_Questionnaire.pdf PDF
Attach_1-SPECS.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MALMSTROM AFB, MONTANA FA4626-15-R-0009

AF Form 66 Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-1

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

E C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

ST

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

D

SU

B

M

IS

SI

O

N D

A T

(B Y

C

O N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

IV

IL

N

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

SE

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

L

FI

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

1 01 00 00 - 3.5.2 - Red Lines 4 PTFI

2 01 00 00 - 3.5.2 - As Built Field Data 2 3 PTFA

3 01 00 00 - 3.7 - Operating and Maintenance Instructions 3 3 PTFA

4 01 00 00 - 3.8.1 - Contractor Furnished Equipment List 4 3 PTFA

5 01 00 00 - 3.8.2 - Guarantees 4 10 PTFA

6 01 00 00 - 3.10 - Shop Drawings as Required by Technical Specifications 4 10 PTSA

7 01 00 00 - 3.11 - Start of Work Notification 1 PTSW

8 01 00 00 - 3.12 - Notice of Final Inspection 1 14 PTFI

9 01 00 00 - 3.13 Construction Near Utility Systems (AF Form 103) 1 PTSW

10 01 00 00 - 3.14 - Utility Outage Notices 1 14 PTO

11 01 00 00 - 3.18.2 - Quality Control Plan 4 PTSW

12 01 00 00 - 3.18.4 - Quality Control Records 1 EWD

13 01 00 00 - 3.19 - 1354 Checklist (Property Inventory Checklist) 4 PTFI

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-2

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

14 01 32 01 - 3.3 - Progress Schedule (AF form 3064) 4 PTSW

15 01 00 00 - 3.21 - Nuclear Densometers 4 PTSW

16 13 60 00 - 2.3 & 4.1.1 - Construction Dewatering Permit 4 PTSW

17 13 60 00 - 2.3 & 4.3.1.A - Construction Storm Water Notice of Intent 4 PTSW

18 13 60 00 - 2.3 & 4.3.1.B - Construction Storm Water Polution Prevention Plan 4 PTSW

19 13 60 00 - 2.3 & 4.3.1.1 - Construction Storm Water Notice of Termination 4 PTSW

20 01 36 00 - 2.4 - Demolition Activities Notification 4 PTSW

21 01 36 00 - 8.1.2 - Hazardous Materials Report

EESOH-MIS 3952 4 PTSW

22 01 36 00 - 11.3 - Monthly Report of Solid Waste Disposal and Diversion 4 Monthly

23 01 36 00 - 11.6 - Waste Management Plan 4 PTSW

24 01 36 00 - 12.4 - Recovered Materials Written Determination Form 4 PTSW

25 01 36 00 - 12.5 - Recycled Material Use Report 4 PTSW

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-3

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

26 05 31 00 Steel Decking 4 40 D

PTSW

27 Steel Decking 4

28 Mechanical Fasteners 4

29 Flexible Closure Strips 4

30 Steel Sheet 4

31 Weld Washers 4

32 Repair Paint 4

33 05 50 00 Metal Fabrications 4

34 Steel Framing 4

35 Downspout Supports 4

36 Fasteners 4

37 Shop Primer 4

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-4

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

38 06 10 00 Rough Carpentry 4

39 Wood Products 4

40 Fasteners 4

41 Metal Framing Anchors 4

42 Water-Repellent Preservative 4

43 06 16 00 Sheathing 1 4 40 D

PTSW

44 Wood Panel Products 4

45 Sheathing 4

46 Fasteners 4

47 07 01 50.19 - Preparation for Re-Roofing 4 40 D

PTSW

48 Rigid Insulation 4

49 Plywood 4

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-5

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

50 Re-Cover Board 4

51 07 21 00 - Thermal Insulation 4 40 D

PTSW

52 Extruded Polystyrene Foam-Plastic Board 4

53 Polyisocyanurate Foam-Plastic Board 4

54 Fasteners 4

55 Glass-fiber Insulation 4

56 Spray Polyurethane Foam Insulation 4

57 Bonding Adhesive 4

58 07 25 00 - Weather Barriers 4 4 4 40 D

PTSW

59 Water-Resistive Barrier 4

60 Sealant Tape 4

61 Fasteners 4

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-6

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

62 07 53 23 - EPDM Roofing 4 4 4 4 28 D

PTSW

63 EPDM Membrane and Flashing 4

64 Base Flashings and Terminations 4

65 Tapered Insulation 4

66 Fasteners 4

67 Adhesives and Sealants 4

68 Termination Bars and Fasteners 4

69 Cover Board 4

70 Protection Mat 4

71 Flexible Walkways 4

72 07 71 00 - Roof Specialties 4 28 D

PTSW

73 Copings

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-7

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

74 Roof-edge Specialties

75 Roof-edge Drainage Systems

76 Reglets and Counterflashings

77 Splash Pads

78 Fasteners

79 Sealants

80 07 72 29 - Manufactured Roof Expansion Joints 4

81 Membranes 4

82 Sheet Metal Products 4

83 Ahdesives 4

84 Fasteners 4

85 Mineral Fiber Blankets 4

Bid Doc - Submittal Schedule-Repair Roof Bldg 1440-7/7/2015

01330a-8

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-15-R-0009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

C

O M

M E

N D

A T

IO

N

S M

A N

U

FA

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

T

E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

SU

B M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

NZAS 15-0019 Repair Roof Building 1440

Number of Copies Required

86 Bituminous Coatings 4

87 07 72 53 - Snow Guards 4 4 4 4 4 4

88 07 079200 Joint Sealants 4 28 D

PTSW

89 26 82 13 - Electric Roof and Gutter Heat Trace System 4 4 4 PTSW

AWC = After Work Completed =

PTSW = Prior to Starting Work =

AFA = After Final Acceptance SRO = After Each Occurrence

PTO = Prior to Outage PTFI = Prior to Final Inspection

PTNT = Prior to Notice to Proceed PTFP = Prior to Final Payment

ANTP = After Notice to Proceed PTCW = Prior to Completing Work

EWD = Each work day AF Form 3000 not required AFI = After Final Inspection

PTFA = Prior to Final Acceptance PTSA = Prior To Start of Action

ACA = After Contract Award PSS = Per Submittal Schedule

Schedule of Abbreviations:

BMF Before Material Delivery

SN Advance Notification