Questions_and_Answers.docx

DOCX document 14 KB Posted

Attached to
BLDG 1440 ROOF MAFB, MT Federal contract opportunity
Solicitation number
FA4626-15-R-0009
Issued by
Department of the Air Force Global Strike Command

About this file

Q A's- more to follow

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 1440 ROOF MAFB, MT, newest first.
File Type Posted
Additional_Q.docx DOCX document
q a's.docx DOCX document
Conformed_copy_of_1440_Roof_Repair.pdf PDF
Amendment_2_Changes.pdf PDF
Questions_and_Answers.docx DOCX document
Past_Performance_clarification.docx DOCX document
AMENDED_-_075323__-_ethylene-propylene-diene-monomer_(epdm)_roofing.pdf PDF
Amendment_01.pdf PDF
Pg-43.pdf PDF
Pg-44.pdf PDF
Pg-42.pdf PDF
Meeting_mins_Roof_1440.pdf PDF
Attach_5-WDOL.pdf PDF
Attach_1-SPECS.pdf PDF
Attach_7-_Past_Performance_Questionnaire.pdf PDF
Attach_4-Schedule_of_Drawings_-_Bid_Doc_1440.pdf PDF
Attach_6-_Base_Entry_Policy_Letter.pdf PDF
Attach_2_-_Submittal_Schedule-Repair_Roof_Bldg_1440.pdf PDF
FA4626-15-R-0009.pdf PDF
Attach_3_-_Drawings.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. On the Roof Mechanical/Electrical Demolition Plan under the electrical work notes #7 it states “ disconnect and remove all lightning protection down conductors.” According to the elevation demolition drawings provided it notes that the existing wall panels are to remain. Please confirm that this is correct and they indeed want the existing exposed down leads removed. If they want the existing lightning protection system down leads removed who is removing this material? Would your customer like us to provide a pricing for the removal of the existing down leads along with the existing system on the roof or is a separate party removing this material?

2. With this being an existing building and I’m assuming the existing landscape around the building is complete with concrete/asphalt etc. Would they like us to tie in to the existing grounding from the old system or would they like us to include provisions to install a new grounding system ( ground ring, ground rods etc.).

Answer: No new lightning protection work is required for this project. Existing lightning protection system will be removed to the extent possible without removing the existing wall panels (in accordance with the demolition notes

3. Can the roofing be substituted with Duralap PVC roofing. This was used on the recent roof project Bldg. 500

Answer: No. The project has to be constructed, as designed, with an EPDM membrane.

4. Can the roof construction be phased into one section at a time?

Answer: Yes, up to the offeror.

5. Does the entire fence need to be constructed as shown in the plans?

Answer: No, fencing can be phased in coordination with the construction.