Attach_3_-_Drawings.pdf
PDF 6 MB Posted
- Attached to
- BLDG 1440 ROOF MAFB, MT Federal contract opportunity
- Solicitation number
- FA4626-15-R-0009
About this file
Attachment 3-Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Q.docx | DOCX document | |
| q a's.docx | DOCX document | |
| Conformed_copy_of_1440_Roof_Repair.pdf | ||
| Amendment_2_Changes.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| AMENDED_-_075323__-_ethylene-propylene-diene-monomer_(epdm)_roofing.pdf | ||
| Past_Performance_clarification.docx | DOCX document | |
| Amendment_01.pdf | ||
| Pg-43.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| Pg-44.pdf | ||
| Pg-42.pdf | ||
| Meeting_mins_Roof_1440.pdf | ||
| Attach_5-WDOL.pdf | ||
| Attach_4-Schedule_of_Drawings_-_Bid_Doc_1440.pdf | ||
| Attach_6-_Base_Entry_Policy_Letter.pdf | ||
| Attach_1-SPECS.pdf | ||
| Attach_7-_Past_Performance_Questionnaire.pdf | ||
| Attach_2_-_Submittal_Schedule-Repair_Roof_Bldg_1440.pdf | ||
| FA4626-15-R-0009.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE
MASONRY
RIGID INSULATION
(E) Mechanical Curb - Demo or Reset - see M/E sheet
ROOF LEGEND
(E) Mech. unit - Demo or Reset - See M/E sheet
(E) Roof Hatch - Remove & Reset in Place
(E) Mech. Vent Stack To Remain - See M/E sheet
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
NZAS 15-0019
Project No. NZAS-15-0019
/2
/2
:0
:4
P
M
Cov03.03.2015
Author
Checker
Cover
REPAIR ROOF, BUILDING 1440
Designer
REPAIR ROOF, BUILDING 1440
Type B Services | 03.03.2015
A1.4
SECTION NUMBER N
A1.3 View Scale
View Callout
A1.4
A1.4
A4.1 8
A1.4
301D
A
View Callout North Arrow
Exterior Elevation Callout
Exterior Wall Type Symbol
Building Section Callout
Wall Section Callout
Interior Elevation Callout
Detail View Callout
Door Symbol
Window Type Symbol
Interior Wall Type Symbol
Keynote Callout
Level Callout
Floor Level 100'-0"
EW-1
1A
SHEET NUMBER
DIRECTION OF CUT PROJECT NORTH
SECTION NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
DIRECTION OF CUT
DETAIL NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
DIRECTION OF CUT
VIEW NUMBER
SHEET NUMBER
DIRECTION OF VIEW
LEVEL TITLE
LEVEL ELEVATION
SHEET LEGEND
Cover Sheet
Architectural Drawings A1.0 Site Plan
A2.0 Roof Demo Plan
A2.1 Roof Demo Details
A2.2 Reroof Plan
A2.3 Reroof Details
A3.0 Demo Elevations
A3.1 Reroof Elevations
1. CONTRACTOR IS TO VERIFY THE LOCATIONS OF EXISTING ROOFTOP UTILITIES AND OTHER SERVICE CONNECTIONS AND EXISTING SITE CONDITIONS AND FACILITIES PRIOR TO CONSTRUCTION. CONTRACTOR IS
TO NOTIFY CONTRACTING OFFICER WITH ANY DISCREPANCIES.
2. THE SITE AND EXISTING BUILDING WILL REMAIN OCCUPIED AND OPERATIONAL THROUGHOUT THE COURSE OF CONSTRUCTION, CONTRACTOR SHALL MINIMIZE DISRUPTIONS TO PERSONELL, CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY SITE/BUILDING AREA AND ENSURE HAZARDOUS AREAS ARE NOT ACCESSIBLE
TO THE OCCUPANTS.
3. IF WORK WILL DISRUPT A PORTION OF THE EXISTING FACILITY, CONTRACTOR IS RESPONSIBLE FOR
COORDINATING AND COMMUNICATING THE DISRUPTIVE WORK WITH THE CONTRACTING OFFICER.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY FACILITIES DURING CONSTRUCTION. ALL WORK SHALL BE CONFINED TO THE IMMEDIATE AREA SURROUNDING THE CONSTRUCTION SITE, MOBILIZATION/ STORAGE/ PARKING AREAS SHALL BE COORDINATED WITH CONTRACTING OFFICER. CONTRACTOR SHALL RESTORE MOBILIZATION/ STAGING/ STORAGE AREAS TO A LIKE NEW CONDITION UPON COMPLETION OF THE
PROJECT.
5. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE FLAGGING, TEMPORARY FENCING, ETC. REQUIRED FOR A SAFE USE OF THE SITE DURING THE COURSE OF THE PROJECT. THE CONTRACTOR TO PROVIDE ALL SIGNAGE, BARRICADES, FLAGMEN, TEMPORARY FENCING AND SIGNAGE REQUIRED TO PROVIDE SAFE TRAVEL & EXITING
TO THE PUBLIC / STAFF.
6. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PERTINENT PHYSICAL STRUCTURES, INCLUDING TREES, IN THE CONSTRUCTION AREA OF THE SITE AND FOR PROVIDING PROPER PROTECTION OF THESE
ITEMS DURING THE CONSTRUCTION PHASE.
7. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING SOD, LANDSCAPING, SIDEWALKS AND SITE FEATURES ADJACENT TO THE BUILDING THAT ARE NOT BEING DEMOLISHED OR REMOVED FROM DAMAGE DURING THE COURSE OF CONSTRUCTION AND FOR THE REPAIR/ REPLACEMENT OF ANY AND ALL DAMAGED
FEATURES UPON COMPLETION OF THE PROJECT.
8. CONTRACTOR QUALITY CONTROL MANAGER IS RESPONSIBLE FOR ORGANIZING/ COORDINATING ALL NECESSARY ON-SITE INSPECTIONS REQUIRED BY GOVERNMENT PERMITING AGENCIES FOR ALL TRADES
THROUGHOUT CONSTRUCTION.
9. THE CONTRACTORS SHALL BE COGNIZANT OF THE FACT THAT SPECIAL CARE IS REQUIRED DURING THE CONDUCTANCE OF THIS PROJECT. SPECIAL CONSIDERATION SHOULD BE GIVEN TO PROCEDURES WHERE THE EXISTING BUILDING FABRIC IS CUT OR PATCHED, AND PROVISIONS SHALL BE IMPLEMENTED TO PROTECT THOSE AREAS THAT ARE NOT DIRECTLY AFFECTED BY THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL INSPECT THE PROPOSED PROJECT SITE AND CONDITIONS PRIOR TO SUBMISSION OF THEIR PROPOSAL.
THE DRAWINGS ARE REPRESENTATIVE OF THE WORK TO BE CONDUCTED, HOWEVER, NOT ALL CONDITIONS
ARE DETAILED OR REPRESENTED THAT MAY BE NECESSARY TO COMPLETE THE INTENDED WORK.
GENERAL NOTES
SHEET INDEX
N
VICINITY MAP
Great Falls, MT
Malmstrom A.F. Base
N
SITE MAP
Malmstrom A.F. Base
Project Location
PROJECT TEAM
CONTRACTING OFFICER:
United States Air Force Malmstrom Air Force Base Great Falls, Montana
ARCHITECTS:
Schlenker and McKittrick Architects P.C.
2625 Winne Avenue | Suite 1 Helena, MT 59601 P: 406.442.4933 F: 406.442.4936 Jason M. Davis, AIA, NCARB
ENGINEERS:
Mechanical: Design3 Engineering
1211 24th Street West, Suite 7 Billings MT 59102 P: 406.245.5599 F: 406.245.9830 Bob Scott, P.E.
Electrical: Design3 Engineering
P.O. Box 365 Stevensville MT P: 406.777.3166 F: 406.245.9830 Garth Stevens, P.E.
2x TWO-BY LUMBER
A.F.F. ABOVE FINISHED FLOOR
A.I.B. AIR INFILTRATION BARRIER
ACT ACOUSTIC CEILING TILE
ADD./ ALT. ADDITIVE ALTERNATE
AHU AIR HANDLING UNIT
ALUM. ALUMINUM
ARCH. ARCHITECT
ASSEMB. ASSEMBLY
B.O. BOTTOM OF
BLDG. BUILDING
BRD. BOARD
BYND. BEYOND
CLR. CLEAR
CMU CONCRETE MASONRY UNIT
COL(S). COLUMN(S)
COMP. COMPOSITE
CONC. CONCRETE
CONT. CONTINUOUS
CONT. CONTRACTOR
CONST. CONSTRUCTION
TYPICAL ABBREVIATIONS
COORD. COORDINATE
DEF. DEFINITION
DEMO. DEMOLISH
DTL.(S) DETAIL OR DETAILS
(E) EXISTING
E.W. EXTERIOR WALL
ELEC. ELECTRICAL
ELEV. ELEVATION
EQUIP. EQUIPMENT
EXT. EXTERIOR
EXT. EXTRUDED
F.F. FLOOR FINISH
F.F.L. FINISHED FLOOR LEVEL
FT. FOOT
FIN. FINISHED
FOUND. FOUNDATION
FRP FIBERGLASS REINFORCED PANEL
G.A. GYPSUM ASSOCIATION
GWB GYPSUM WALL BOARD
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HR. HOUR
INFIL. INFILTRATION
INSUL. INSULATION OR INSULATED
INT. INTERIOR
LAV. LAVATORY
LOC. LOCATION
MAT. MATERIAL
MECH. MECHANICAL/ MECHANICALLY
MEMB. MEMBRANE
MFR. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
(N) NEW
NEC. NECESSARY
NIC NOT IN CONTRACT
NOM. NOMINAL
O/ OVER
O.C. ON CENTER
PERIM. PERIMETER
P-LAM. PLASTIC LAMINATE
PLYWD. PLYWOOD
PREFIN. PREFINISHED
PRE-MAN. PRE-MANUFACTURED
R/C ROOF/ CEILING
RECOMM. RECOMMENDATIONS
REQ. REQUIRED/REQUIREMENTS
S.C. SOLID CORE
SCHED. SCHEDULE
SHEATH. SHEATHING
SPEC. SPECIFICATION
SQ. SQUARE
STD. STANDARD
STL. STEEL
STRUCT. STRUCTURAL
TEMP. TEMPORARY
TERM. TERMINATION
THROUGH. THROUGHOUT
T.O. TOP OF
TYP. TYPICAL
U.L. UNDERWRITERS LABORATORIES
V.B. VAPOR BARRIER
VERT. VERTICAL
VFY. VERIFY
W/ WITH
WD. WOOD
WIND. WINDOW
WWF WELDED WIRE FABRIC
Mechanical & Electrical Drawings ME1.1 Mechanical & Electrical Demo Plan
HATCH LEGEND
Bid Documents
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
492' - 0"
7'
0"
15' - 0"
BUILDING 1439
BUILDING 1440
C O N
TR
AC
TO
R
AC
C
ESS
70th STREET
88 8
60' - 0"
STAGING
AREA
Keynote Legend - Site
(E) asphalt parking area/circulation around facility
(E) landscaping and sidewalk elements adjacent to facility – protect during course of construction
(E) CMU enclosures – verify location and coordinate protection with Contracting Officer
(E) structure to remain - No work.
(E) mechanical equipment – protect as required – coordinate with Contracting Officer
Primary building access to be maintained during course of construction
– coordinate with Contracting Officer
Construction fence – coordinate exact location, distance from building, and access gate locations with Contracting Officer
(N) temporary entrance protection at locations shown – man doors and overhead doors – coordinate locations with Contracting Officer and verify size required - Contractor to submit engineered design of entrance protection structures to Contracting Officer for review prior to fabrication and installation.
60'x60' Contractor staging area
Legend
Indicates location of building access - man or over head doors -verify locations and coord. w/ gate access and entrance protection
- Coordinate with Contracting Officer
(N) temporary construction fence – coordinate exact location, distance from building, and access gate locations with Contracting Officer
10’-0” wide gate access for adjacent overhead door – verify location and coordinate with Contracting Officer
X
General Notes - Site Plan
1.
2.
3.
4.
5.
6.
Project site is to remain in active use throughout conductance of the project - Contractor to provide all temporary security features, fencing, barriers, flagging, signage, etc. as required to ensure the safe use of and circulation around the project site at all times during conductance of the project.
Contractor to coordinate and verify the size and location of the on-site staging area and provide security features, fencing, barriers, flagging, signage, etc. as required.
Project Building to be occupied and in full use during conductance of the project. Contractor to provide and install all necessary entrance protection at entrances indicated - coordinate and verify exact locations and sizes of entrance protection with Contracting Officer and existing conditions. Coordinate with site fencing, gate access, etc. as required.
Contractor to coordinate schedule and activities with Contracting Officer as required to comply with scheduled use and access to the building to reduce the disturbance to the users during the conductance of the project.
Contractor to verify size and locations of and required access to all pertinent site features (utilities, meters, mechanical equipment, fire hydrants, bollards, etc.) in the immediate vicinity of the project building, and within the limits of the temporary construction fence, and maintain required access to and protection of such features during the conductance of the project.
Contractor is responsible for the repair of any site or building features (asphalt, landscaping, bollards, siding, etc.) that are not scheduled to be disturbed during the conductance of the project, and shall repair or restore such disturbed items as required to their original condition.
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:3
P
M
A1.0
NZAS 15-0019
03.03.2015
Author
Checker
Site Plan
REPAIR ROOF, BUILDING 1440
Designer
1" = 40'-0"A1.0
1 Site Plan N N
TRUE PROJECT
Keynote Legend - Roof
(E) Internal gutter to be removed
(E) Internal roof drain to be removed/abandoned - cap internally
(E) Ridge cap to be removed
(E) Roof Ladder to remain
(E) Roof hatch - remove and reset in place
(E) Exhaust Fan - remove and reset in place
(E) Furnace Flue to remain
(E) Metal roofing sytem to be removed
(E) Snow guard system to be removed
1 2
F
A
3 4
B
C
D
E
G
H
7 12
12 13 14 15
J
K
L
M
N
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12"1 1/2" / 12"
/2
/2
/2
1" / 12"
1" / 12"
1" /
2"
1" /
2"
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12" 1 1/2" / 12"
/2
/2
/2
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12"1 1/2" / 12"
/2
/2
/2
MIDDLE ROOF MIDDLE ROOF
MIDDLE ROOF
MIDDLE ROOF
MIDDLE ROOF MIDDLE ROOFLOW ROOF
2 2 2
2 2
1 1
1 1
4 44
HIGH ROOF HIGH ROOF HIGH ROOF
LO
W
RO
O
F
LO
W
R O
O F
HIGH ROOF
HIGH ROOF HIGH ROOF HIGH ROOF HIGH ROOF HIGH ROOF
2 111
1 1
42 1
3 3
4 4
/2
210' - 0"
462' - 0"
210' - 0" 42' - 0" 210' - 0"
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
LOW
LOW
A2.1
A2.1
LOW
LOW
A2.1
A2.1
8 8
8 8 8 8
8 8 8 8
8 8 8
9 9 9
A2.1
A2.1
A2.1
SIM. 4
A2.1
SIM.
A2.1
SIM.
A2.1
SIM. SIM.
A2.1
SIM.
A2.1 LOW
LOW
A2.1
A2.1
SIM.
A2.1
SIM.
A2.1
SIM.
A2.1
SIM.
A2.1
SIM.
A2.1 4
A2.1
LOW
A2.1
LOW
A2.1
A2.1
A2.1
A2.1
SIM. 4
A2.1
SIM.4
A2.1
SIM.
A2.1
SIM.
A2.1
A2.1
A2.1
A2.1
45' - 7 3/8"
A2.1
A2.1 SIM.
PREFIN. MTL. STANDING - SEAM
ROOF PANELS
CLIP SYSTEM FOR ROOF PANELS
RIGID INSULATION- TAPERED, THICKNESS
VARIES
1 1/2" MTL. DECKING
OPEN-WEB STEEL JOIST
General Notes - Demolition & Abatement
Prior to bidding, the contractor shall visit the facility and thoroughly familiarize himself with existing conditions.
The contractor shall provide all demolition incidental to or required for new and renovation construction whether or not it is specifically noted, including, but not limited to, all other work that might reasonably be required to be removed in preparation for specified finishes. Demolition shall be performed in a manner that will not damage any services indicated to remain. Services shall be patched if necessary to provide a suitable sub-strata for new finishes.
Remove all items shown as "dashed".
Debris shall be promptly removed from the building and the site and disposed of in a legal manner. Surfaces in the construction area shall be maintained in a broom clean condition at the end of each work day.
Security must be maintained at all times. Review security procedures with the owner prior to the start of work.
The contractor shall maintain and adhere to all current life-safety and interim life-safety rules and regulations throughout the construction of this project.
The contractor shall patch and/or repair any and all surfaces damaged or removed during demolition to match existing surfaces unless surfaces are to receive new finishes or unless noted otherwise.
Contractor shall inspect existing conditions prior to work. Prior to substantial completion the contractor will repair or clean damaged or dirty surfaces adjacent to project work areas (caused by construction activities) to match original condition.
Lightning protection system shall be removed in its entirety
Contractor shall provide a water tight roof condition @ the end of each work period - See spec.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
General Notes - Demo Roof Plan
1.
2.
3.
4.
See this sheet for existing Roof Assembly.
In addition to mechanical items shown on this drawing, see Mechanical drawing to verify locations, types, sizes and quantities of mechanical roof penetrations/items.
All required plumbing demo shal be preformed by a qualified plumber.
All required electrical demo shall be preformed by a qualified electrician.
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:3
P
M
A2.0
NZAS 15-0019
03.03.2015
KC
JD
Roof Demo Plan
REPAIR ROOF, BUILDING 1440
PR
N
1/16" = 1'-0"A2.0
1 Roof Demo Plan
1 1/2" = 1'-0"A2.0
2 Building 1440- Exsisting Roof Assembly
PLAN
REMOVE (E) PREFIN. MTL. ROOF
PANEL SYSTEM - (E) ROOF
INSULATION TO REMAIN - INSPECT
FOR CONDITION/DAMAGE AND
REPLACE AS REQUIRED
REMOVE (E) PREFIN. MTL.
CAP FLASHING, CLEATS, AND
FASTENERS
REMOVE (E) MEMBRANE LINED
MTL. GUTTER SYSTEM
REMOVE (E) INTERNAL DRAIN
REMOVE (E) RIGID INSULATION
REMOVE (E) MTL. GIRT & BATT INSUL.
CAP (E) DRAIN LINE IN
PLACE TYP.
REMOVE (E) DRAIN LINE AS REQ.
(E) MTL. DECKING TO REMAIN
- INSPECT FOR DAMAGE,
REPAIR AS REQ.
(E) STEEL BUILDING
STRUCTURE TO REMAIN
(E) WALL SYSTEM TO REMAIN -
PREFIN. MTL. WALL PANELS
O/MTL. STUDS & BATT INSUL.
(E) BENT MTL.
PLATES TO REMAIN
CUT (E) WALL PANELS AS REQ. TO
CLEAR (N) CURB - VERIFY
(E) STEEL BUILDING
STRUCTURE TO
REMAIN
(E) WALL SYSTEM TO REMAIN -
PREFIN. MTL. WALL PANELS O/MTL.
STUDS & BATT INSUL.
(E) BENT MTL. PLATES TO
REMAIN
(E) 3/4" EXTERIOR
PLYWD. TO REMAIN
REMOVE (E) APPLIED MEMBRANE
FLASHINGS
REMOVE (E) PREFIN. MTL. FLASHINGS
REMOVE (E) PREFIN. MTL. CAP
FLASHING, CLEATS, AND
FASTENERS
(E) 8" CHANNEL TO REMAIN
REMOVE (E) TREATED 2X NAILER
REMOVE (E) PREFIN. MTL.
ROOF PANEL SYSTEM - (E)
ROOF INSUL. TO REMAIN -
INSPECT FOR
CONDITION/DAMAGE AND
REPLACE AS REQ.
REMOVE (E) PREFIN. MTL. ROOF
PANEL SYSTEM - (E) ROOF
INSULATION TO REMAIN - INSPECT
FOR CONDITION/DAMAGE AND
REPLACE AS REQUIRED
REMOVE (E) PREFIN. MTL.
CAP FLASHING, CLEATS, AND
FASTENERS
REMOVE (E) MEMBRANE LINED
MTL. GUTTER SYSTEM
REMOVE (E) INTERNAL DRAIN
REMOVE (E) RIGID INSULATION
REMOVE (E) MTL. GIRT
CAP (E) DRAIN LINE IN
PLACE TYP.
REMOVE (E) DRAIN LINE AS REQ.
(E) MTL. DECKING TO REMAIN
- INSPECT FOR DAMAGE,
REPAIR AS REQ.
(E) STEEL BUILDING
STRUCTURE TO REMAIN
(E) WALL SYSTEM TO REMAIN -
PREFIN. MTL. WALL PANELS
O/MTL. STUDS & BATT INSUL.
(E) BENT MTL.
PLATES TO REMAIN
CUT (E) WALL PANELS DOWN
2" MIN. TO CLEAR (N) CURB
(E) STEEL BUILDING
STRUCTURE TO REMAIN
(E) PREFIN. MTL.WALL
PANELS TO REMAIN
REMOVE (E) FOAM CLOSURES
WHERE PRESENT
REMOVE (E) PREFIN. MTL.
FLASHINGS
REMOVE (E) PREFIN.
MTL.JOINT COVERS
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) PLYWD. SHEATHING O/MTL.
STUDS, W/BATT INSUL. TO REMAIN
REMOVE (E) FOAM CLOSURES
WHERE PRESENT
REMOVE (E) PREFIN.
MTL.RIDGE CAP
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO
REMAIN
(E) MTL. GIRTS TO REMAIN
REMOVE (E) INSULATION
(E) MTL. BUILDING
FRAME TO REMAIN
(E) PREFIN. MTL.WALL
PANELS TO REMAIN
REMOVE (E) FOAM CLOSURES
WHERE PRESENT
REMOVE (E) PREFIN. MTL.
FLASHINGS
REMOVE (E) PREFIN.
MTL.JOINT COVERS
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) PLYWD. SHEATHING
O/MTL. STUDS, W/BATT
INSUL. TO REMAIN
(E) MTL. BUILDING
FRAME TO REMAIN
(E) MTL. BUILDING
FRAME TO REMAIN
(E) PREFIN. MTL.WALL
PANELS TO REMAIN
REMOVE (E) FOAM CLOSURES
WHERE PRESENT
REMOVE (E) PREFIN. MTL.
FLASHINGS
REMOVE (E) FLEXIBLE
JOINT COVERS
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) PLYWD. SHEATHING O/MTL.
STUDS, W/BATT INSUL. TO REMAIN
(E) MTL.CHANNEL TO
REMAIN
REMOVE (E) PREFIN. MTL.
FLASHINGS - VERIFY
(E) MTL. BUILDING
FRAME TO REMAIN
(E) PREFIN. MTL.WALL
PANELS TO REMAIN
REMOVE (E) FOAM
CLOSURES TYP.
REMOVE (E) PREFIN. MTL. RAKE
FLASHINGS & CLEATS
(E) MTL. BENT PLATES TO
REMAIN
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) MTL. STUDS, W/BATT
INSUL. TO REMAIN
REMOVE (E) FOAM CLOSURES
WHERE PRESENT
REMOVE (E) EXPANSION
JOINT & FLASHING
REMOVE (E) PREFIN.
MTL. ROOF PANELS
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO
REMAIN
(E) MTL. GIRTS TO REMAIN
REMOVE (E) INSULATION
REMOVE (E) PREFIN. MTL.
RIDGE CAP
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:3
P
M
A2.1
NZAS 15-0019
03.03.2015
Author
Checker
Roof Demo Details
REPAIR ROOF, BUILDING 1440
Designer
1 1/2" = 1'-0"A2.1
1 Internal Roof Gutter Demo Detail 1 1/2" = 1'-0"A2.1
2 Roof Parapet Demo Detail 1 1/2" = 1'-0"A2.1
3 Upper Internal Gutter Demo Detail 1 1/2" = 1'-0"A2.1
4 Roof to Wall Demo Detail
3" = 1'-0"A2.1
7 Roof Ridge Demo Detail 1 1/2" = 1'-0"A2.1
6 Roof to Wall Demo Detail at Tailhouse 1 1/2" = 1'-0"A2.1
5 Expansion Joint at Wall Demo Detail 1 1/2" = 1'-0"A2.1
8 Roof Rake Demo Detail
3" = 1'-0"A2.1
9 Roof Ridge Demo Detail
1 2
F F
A A
3 4
B B
C C
D D
E E
G G
H H
7 12
12 13 14 15
J J
K K
L L
M M
N N
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12"1 1/2" / 12"
/2
/2
/2
1" / 12"
1" / 12"
1" /
2"
1" /
2"
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12" 1 1/2" / 12"
/2
/2
/2
1 1/2" / 12"1 1/2" / 12"
1 1/2" / 12"1 1/2" / 12"
/2
/2
/2
HIGH ROOF
HIGH ROOF
HIGH ROOF
MIDDLE ROOF
MIDDLE ROOF MIDDLE ROOF
LOW ROOF
1 1
1 1
4 44
HIGH ROOF
HIGH ROOF HIGH ROOF
LO
W
RO
O
F
LO
W
R O
O F
HIGH ROOF
HIGH ROOF HIGH ROOF
HIGH ROOF
HIGH ROOF HIGH ROOF
1 1
4 1
3 3
4 4
A2.3
A2.3
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
TYP
A2.3
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
LOW
A2.3
LOW
A2.3
SIM.
LOW
A2.3
LOW
A2.3
A2.3
SIM.
LOW
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
TYP
TYP
2 2
2 2 2 2
2 2
2 2 2
A2.3
A2.3
SIM. SIM.
A2.3
SIM.
A2.3SIM.
A2.3SIM.
A2.3
SIM.
A2.3
SIM.
A2.3
SIM.
A2.3
SIM.
A2.3
A2.3
A2.3
A2.3
SIM.
A2.3
A2.3
A2.3
SIM.
A2.3
A2.3
A2.3
LOW
A2.3
A2.3
A2.3
A2.3
SIM.
A2.3
SIM.
A2.3
SIM.
2 2
A2.3
A2.3
A2.3
SIM.
A2.3
SIM.
A2.3
SIM. SIM.
SIM.
A2.3
SIM.
A2.3 SIM.
A2.3
A2.3SIM.
A2.3SIM.
A2.3SIM.
A2.3 SIM.
A2.3 SIM.
A2.3
A2.3
/8
210' - 3 5/8" 41' - 8 3/8" 210' - 3 5/8"
/8
/2
9' - 8 1/4"
10' - 0 1/2"
/8
"4
/4
47' - 8"
A2.3 SIM.9
9 9
99 999 9
101010101010
10 10 10 10 10 10
10 10
10 101010101010
10 10
(N) 90-MIL FULLY ADHEARED EPDM MEMBRANE
SYSTEM
(E) 6" RIGID INSULATION - ADD: REPLACE IF REQ. -
VERIFY
(E) VAPOR BARRIER
(E) 1 1/2" MTL. DECKING - ADD:
PAINT/REPAIR AS REQ - VERIFY
(E) OPEN-WEB STEEL JOIST
(N) 1/2" MIN. GLASS-FIBER RECOVERY BOARD
FASTENERS PER RECOVERY BOARD MFR.
Keynote Legend - Reroof Plan
(N) Prefin. mtl. gutters - See general note #4 this sheet
(N) Single-ply roof membrane system - Typ. all roof surfaces
(E) Roof ridge typ.
(E) Roof Ladder to remain
(E) Roof hatch - remove and reset in place - Clean & paint
(E) Exhaust Fan - remove and reset in place
(E) Furnace Flue to remain
(N) Snow guard system - See general note #1 this sheet.
(N) Walk pads
(N) Prefin. mtl. downspouts - See general note #5 this sheet.
General Notes: Reroof Plan
Contractor to provide design & installation of complete snow guard system per mfr details - see spec. Verify with Contracting Officer
All required plumbing work shall be preformed by a qualified plumber.
All required electrical work shall be preformed by a qualified electrician.
Gutter mfr. to provide proper sizing and attachment of complete gutter system. Verify with Contracting Officer. See spec.
Gutter mfr. to provide proper sizing and attachment of downspouts for gutter system. Locations shown on this plan are approximate. Verify downspout locations and discharge locations with Contracting Officer.
See spec.
1.
2.
3.
4.
5.
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:3
P
M
A2.2
NZAS 15-0019
03.03.2015
Author
Checker
Reroof Plan
REPAIR ROOF, BUILDING 1440
Designer
1/16" = 1'-0"A2.2
1 Reroof Plan
RC-1
Roof Assembly RC-1
(E) WALL SYSTEM TO REMAIN - PREFIN.
MTL. WALL PANELS O/ MTL. STUDS &
FULL BATT INSUL.
CAP (E) DRAIN LINES IN PLACE
TYP.
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) TREATED 2X6 CURB WALL W/STUDS @
24" O.C. BEVEL TOP PLATE TO MATCH
ROOF SLOPE
(N) 1/2" ROOF RECOVERY BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) MTL. GIRTS TO REMAIN
(N) FULL THICK BATT INSUL. INFILL
ANCHOR (N) CURB WALL TO
(E) MTL. PLATE @ 48" O.C.
RC-1
(N) FULLY ADHERED MEMBRANE
FLASHING & SEALANT PER
ROOFING MFR.
(N) HEAVY DUTY GUTTER SYSTEM
WITH SUPPORT BRACKETS ANCHOR
INTO (N) TOP PLATE. SEE SPEC.
(N) ROOF INSUL. TO MATCH (E) AS REQ.
(N) PANEL CLOSURE
A2.3
(E) MTL. ROOF DECK TO
REMAIN
WRAP MEMBRANE O/ (N) CONST. PER
MEMBRANE MFR.
(N) PREFIN. MTL. PARAPET CAP W/
CONT. CLEAT
(N) 3/4" TREATED PLYWOOD
(N) 1/2" TREATED PLYWOOD
(E) STEEL CHANNEL TO REMAIN
EXTEND (N) MEMBRANE UP WALL PER
MEMBRANE MFR. O/ (E) PLYWD.
(N) CONT. MTL. PLATE AND FASTENERS W/
SEALANT STRIP PER MEMBRANE MFR.
(E) ROOF INSUL. TO REMAIN
(E) PLYWD. SHEATHING- VERIFY
(E) MTL. WALL PANELS TO REMAIN
RC-1
(N) PANEL CLOSURE
(E) WALL SYSTEM TO REMAIN
- PREFIN. MTL. WALL PANELS
O/ MTL. STUDS & FULL BATT
INSUL.
A2.3
(E) WALL SYSTEM TO REMAIN - PREFIN.
MTL. WALL PANELS O/ MTL. STUDS &
FULL BATT INSUL.
CAP (E) DRAIN LINE IN PLACE TYP.
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) 1/2" ROOF RECOVERY BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) MTL. GIRTS TO REMAIN
ANCHOR (N) CURB WALL TO
(E) MTL. PLATE @ 48" O.C.
(N) FULLY ADHERED MEMBRANE
FLASHING & SEALANT PER
ROOFING MFR.
(N) HEAVY DUTY GUTTER SYSTEM
WITH SUPPORT BRACKETS ANCHOR
INTO (N) TOP PLATE TYP. SEE SPEC.
(N) ROOF INSUL. TO MATCH (E) AS REQ.
(N) TREATED 2X6 CURB WALL
W/STUDS @ 24" O.C. BEVEL TOP
PLATE TO MATCH ROOF SLOPE
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) 1/2" ROOF RECOVERY BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO
REMAIN
(E) MTL. GIRTS TO REMAIN
(E) WALL STRUCTURE & BATT INSUL. TO
REMAIN
(N) SELF- ADHERED PANEL CLOSURES
(N) PREFIN. MTL. FLASHING
(N) MEMBRANE WALL FLASHING AND SEALANT
ON (E) PLYWOOD PER MEMBRANE MFR.
REMOVE (E) MTL. LOWER WALL PANEL
AS REQUIRED TO EXTEND (N) MEMBRANE
UP BEHIND (E) MTL. WALL PANEL 12" MIN.
ON (E) PLYWOOD PER MEMBRANE MFR.
PROVIDE (N) PLYWOOD AS REQ.
(N) CONT. MTL. PLATE, FASTENERS
AND SEALANT PER MEMBRANE MFR.
RC-1
M
IN
M
IN
TERMINATE MEMBRANE AS REQ. BY
MEMBRANE MFR.
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) TREATED 2X6 CURB WALL
W/STUDS @ 24" O.C. BEVEL TOP
PLATE TO MATCH ROOF SLOPE
(N) 1/2" ROOF RECOVERY BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) MTL. GIRTS TO REMAIN
BATT INSUL. INFILL
ANCHOR (N) CURB WALL TO
(E) MTL. PLATE @ 48" O.C.
RC-1
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) 1/2" ROOF RECOVERY
BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO
REMAIN
(E) MTL. GIRTS TO REMAIN
(E) WALL STRUCTURE & BATT INSUL. TO
REMAIN
(E) MTL. WALL PANELS TO REMAIN
(N) SELF- ADHERED PANEL CLOSURES
(N) PREFIN. MTL. FLASHING
(N) MEMBRANE WALL FLASHING AND
SEALANT PER MEMBRANE MFR.
REMOVE (E) MTL. LOWER WALL PANEL
AS REQUIRED TO EXTEND (N) MEMBRANE
UP BEHIND (E) MTL. WALL PANEL 12" MIN.
ON (E) PLYWOOD PER MEMBRANE MFR.
(N) CONT. MTL. PLATE, FASTENERS
AND SEALANT PER MEMBRANE MFR. RC-1
M
IN
M
IN
RC-1
(E) MTL. WALL PANELS TO REMAIN
(N) SELF- ADHERED PANEL CLOSURES
(N) PREFIN. MTL. FLASHING
(N) TERM BAR, FASTENERS AND SEALANT PER
MEMBRANE MFR.
EXTEND (N) MEMBRANE UP PLYWOOD PER
MEMBRANE MFR.
(N) COMPRESSIBLE TUBE FILLER, VERIFY
(N) CONT. MTL. PLATE, SEALANT STRIP, PER
MEMBRANE MFR.
(E) ROOF INSUL. TO REMAIN
(N) FASTENERS TO (E) DECK PER
MEMBRANE MFR.
(E) MTL. DECKING
(E) COMPRESSIBLE FILLER TO REMAIN
(N) 12" EPDM FLASHING
M
IN
CONT. SEALANT BEAD (TYP.)
PER MEMBRANE MFR.
FLASHING MEMBRANE AND SEALANT
LAYERS PER MEMBRANE MFG.
1/2" RECOVERY BOARD
WRAP MEMRBANE DOWN FACE OF
(N) NAILERS PER MFR.
(N) PREFIN. MTL. RAKE FLASHING
W/ CONT. CLEATS INTO (E) WALL
PANELS AS REQ.
(N) 2X6 @ 24" O.C. W/ BATT INSUL.
ANCHOR TO ROOF DECKING @ 24"
O.C. MIN.
(E) MTL. WALL PANELS TO REMAIN
(E) MTL. DECKING
(E) ROOF INSUL.
RC-1
(N) FULLY ADHERED ROOFING
MEMBRANE
(N) TREATED 2X4 CURB WALL
W/STUDS @ 24" O.C.
(N) 1/2" ROOF RECOVERY BOARD
(E) ROOF INSUL. TO REMAIN
(E) MTL. DECKING TO REMAIN
(E) MTL. GIRTS TO REMAIN
(N) FULL THICK BATT INSUL. INFILL
ANCHOR (N) CURB WALL TO
(E) MTL. PLATE @ 48" O.C.
QUICKSEAM RPF STRIP
2" MTL. PLATE W/ FASTENER @
12" O.C. MAX.
COMPRESSIBLE TUBE - DIA. TO
EXCEED RIDGE OPENING BY 50% MIN.
(E) MECH. CURB TO REMAIN- TYP.
WRAP (N) MEMBRANE UP (E) PARAPET
WALL W/ ADHESIVE PER MEMBRANE
MFR. & DOWN INSIDE FACE 3" MIN.
(N) CONT. MTL. PLATE AND FASTENERS
PER ROOF MEMBRANE MFR.
(N) MEMBRANE FLASHING, SEALANTS,
AND PRIMER STRIP PER ROOF
MEMBRANE MFR.
RC-1
(N) PLYWD. AS REQ.
(N) PLYWD. AS REQ.
(E) ROOF HATCH FLASHING -
REMOVE & PAINT
(N) CONT. MTL. PLATE AND
FASTENERS PER MFR.
(N) EPDM MEMBRANE ROOF
SYSTEM
RC-1
(E) STRUCT. TO REMAIN
(E) INSUL. TO REMAIN
(N) RECOVERY BOARD
(N) MEMBRANE FLASHING, SEALANTS
& PRIMER STRIP PER MFR.
(N) TERM BAR & SEALANT PER MFR.
(E) ROOF HATCH COVER -
REMOVE & PAINT
EPDM FLASHING
M
IN
(N) GUTTER SYSTEM - SEE
SPEC. - CONSTRUCT AND
ANCHOR PER SMACNA
(N) SELF-ADHEARING
FOAM PANEL CLOSURE
(E) MTL. WALL PANEL TO
REMAIN
(E) WALL SYSTEM TO
REMAIN - PREFIN. MTL.
WALL PANELS O/ MTL.
STUDS & FULL BATT INSUL.
APPROPRIATE FASTENER
TREATED WD. NAILER
1/4" 1"
CONT. SEALANT BEAD
HOT DIPPED GALV. ROOF NAILS
@ 4" O.C. MAX.- STAGGERED 1/2"
90 MIL. EPDM MEMBRANE
CONT. SEALANT BEAD
M
IN
FIELD VERIFY
WALL ASSEMBLY MAY
VARY - FIELD VERIFY ALL
DIMENSIONS BEFORE
FABRICATION
WRAP MEMBRANE UP
& OVER PARAPED
WALL PER MFR.
(N) CONT. CLEAT -
FASTEN @ 6" O.C. MAX.
(N) PREFIN. MTL. PARAPET
CAP - SEE SPEC.
(N) SLOPED WD. BLOCKING
EXPOSED FASTENER
@ 12" O.C.
M
IN
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:4
P
M
A2.3
NZAS 15-0019
03.03.2015
Author
Checker
Reroof Details
REPAIR ROOF, BUILDING 1440
Designer
1 1/2" = 1'-0"A2.3
1 Typ. Roof Edge & Gutter Detail 1 1/2" = 1'-0"A2.3
2 Roof Parapet Detail 1 1/2" = 1'-0"A2.3
3 High Roof Edge Detail 1 1/2" = 1'-0"A2.3
4 Typ. Roof to Wall Detail
3" = 1'-0"A2.3
7 New Ridge Detail @ High Roof 1 1/2" = 1'-0"A2.3
6 Typ. Roof to Wall @ Tail House 1 1/2" = 1'-0"A2.3
5 Typ. Roof to Wall Expansion Joint Detail 1 1/2" = 1'-0"A2.3
8 New Detail @ Roof Rake Edge
3" = 1'-0"A2.3
9 Ridge @ Expansion Joint Detail 1 1/2" = 1'-0"A2.3
10 Mechanical Curb Detail 1 1/2" = 1'-0"A2.3
11 Roof Hatch Curb Detail 3" = 1'-0"A2.3
12 Roof Edge Detail 3" = 1'-0"A2.3
13 Roof Parapet Detail
First Floor 100' - 0"
15611 712161722 18
A2.3
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
3 3
1 1 1 1 1 1 1
111111
First Floor 100' - 0"
FA B C D E G H K L M N
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
1 1 1 1
22 2 2
3 3
First Floor 100' - 0"
F ABCDEGHKLMN
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
2 222
First Floor 100' - 0"
1 2 10 11 12 13 21 22
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
3 4
Keynote Legend - Demo Elevations
Remove (E) roof edge flashing.
Remove (E) metal roof panels.
(E) metal wall panels to remain
(E) roof ladder to remain
(E) sliding doors to remain
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:4
P
M
A3.0
NZAS 15-0019
03.03.2015
KC
JD
Demo Elevations
REPAIR ROOF, BUILDING 1440
PR
1" = 20'-0"A3.0
1 East Demolition Elevation
1" = 20'-0"A3.0
3 South Demolition Elevation
1" = 20'-0"A3.0
4 North Demolition Elevation
1" = 20'-0"A3.0
2 West Demolition Elevation
First Floor 100' - 0"
FA B C D E G H K L M N
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
6 1 1 6
22 2 2
3 3
6 6
First Floor 100' - 0"
15611 712161722 18
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
3 3
1 1 1 1 1 1 1
111111
First Floor 100' - 0"
1 2 10 11 12 13 21 22
A2.3
A2.3
A2.3
A2.3
A2.1
A2.1
A2.3
A2.3
A2.3
3 4
First Floor 100' - 0"
F ABCDEGHKLMN
A2.3
A2.3
A2.3
A2.3
A2.1
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.3
A2.1
A2.3
2 222
66 666
Keynote Legend - (N) Exterior Elevations
(N) roof edge flashing. See spec.
(N) EPDM single-ply roof membrane. See spec.
(E) metal wall panels to remain
(E) roof ladder to remain
(E) sliding doors to remain
(N) Gutters & downspouts. Contractor to provide proper sizing and attachment of complete system. See Reroof Plan (A2.2) and spec.
P lo t D a te
OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE
BASE CIVIL ENGINEER
CHIEF ENGINEER
PROJECT ENGINEER
CE OPERATIONS
FIRE CHIEF
ENVIRONMENTAL ENG.
COMMUNICATIONS
USING AGENCY
BIO-ENVIRONMENTAL
SAFETY
AT/RPEC REP
REV. DATE DESCRIPTION DRAWN APPR'D
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
PROJECT NUMBERS
ACAD DRAWING NUMBER
RECORD FILE NUMBER
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
copyright 2014 SMA, P.C.
AS SHOWN
BID DOCUMENTS
/2
/2
:0
:4
P
M
A3.1
NZAS 15-0019
03.03.2015
Author
Checker
Reroof Elevations
REPAIR ROOF, BUILDING 1440
Designer
1" = 20'-0"A3.1
1 South Re-Roof Elevation
1" = 20'-0"A3.1
2 East Re-Roof Elevation
1" = 20'-0"A3.1
3 West Re-Roof Elevation
1" = 20'-0"A3.1
4 North Re-Roof Elevation
File details come from the government source that posted it. Updated .