FA4621-13-R-0003 Electrical Handhole Details Drawing
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACTOR TO DETERMINE THICKNESS OF HANDHOLE WALLS, TOP,
FLOOR, SUMP WALLS AND SUMP FLOORS, AND AMOUNT OF
REINFORCEMENT IN ACCORDANCE WITH REQUIREMENTS SHOWN
ON E−5201.
2. "D" = THICKNESS DETERMINED BY CONTRACTOR IN ACCORDANCE WITH
REQUIREMENTS SHOWN ON SHEET E−6001. MINIMUM CONCRETE
THICK−NESS OF HANDHOLE WALLS, TOP, FLOOR, SUMP WALLS AND
SUMP FLOORS IS 8 INCHES.
3. HANDHOLE ENTRY FRAME, ENTRY COVER, PULL−IN IRONS, CABLE
RACKS, SUMP, FRAME SUMP COVER, AND DUCT WINDOW SEALING
SHALL BE AS SPECIFIED OR DETAILED ON THIS SHEET.
4. HANDHOLE FRAME AND LID SHALL BE NEENAH R−3498−R2S (OR EQUAL)
EXTRA HEAVY DUTY DUCTILE IRON FRAME AND SOLID LID WITH SPRING
ASSISTED AND LOCKING DEVICE. LID TO HAVE "AIR FORCE DOG LEG
SAFETY ARM". PROVIDE INFORMATION ON LID:
"AIRFIELD LIGHTING"
"75,000 LB SINGLE WHEEL LOAD RATED"
"INSTALLED: "
* − INSERT YEAR OF INSTALLATION
5. CONTRACTOR SHALL GROUND HANDHOLE FRAME. GROUNDING WIRE
TO BE ATTACHED TO:
1) GROUNDING LUG PROVIDED BY CASTING MANUFACTURER
2) LUG INSTALLED BY CONTRACTOR (CONTRACTOR TO
DRILL, TAP AND INSTALL LUG IN FRAME)
3) CADWELD GROUNDING WIRE TO FRAME. CONTRACTOR TO RUN
GROUNDING WIRE TO AND ATTACHED TO GROUNDING ROD.
6. CONTRACTOR SHALL GROUND ALL METAL COMPONENTS, INCLUDING
CASTINGS AND REINFORCEMENT TO GROUNDING ROD. ATTACH
GROUNDING WIRE TO STEPS AND RACKS IN ACCORDANCE WITH NOTE 5.
ATTACH GROUNDING WIRE TO REINFORCEMENT. ATTACH GROUNDING
WIRE BETWEEN REINFORCEMENT AND GROUNDING ROD. SEAL AROUND
GROUND ROD TO PAVEMENT WATER INTRUSION WITH EXPANSION
GROUT. GROUNDING WIRE TO BE #4 BARE COPPER.
7. CONDUITS TO BE SCHEDULE 40 PVC AND CAST−IN−PLACE WITH CASTING
OF HANDHOLE. SEE DETAIL 2, E−5204.
8. PROVIDE 15", THREADED #6 TIE BARS AND 2−7/8" THREADED PRECAST
CONCRETE INSERTS TO ATTACH CONCRETE ENCASED DUCTS TO
HANDHOLE. ADJUST LOCATION OF TIE BARS AS NECESSARY TO SIZE OF
CONCRETE ENCASED DUCTS. SEE DETAIL E−5204.
9. DRAIN SUMP WITH 4" PVC SUBDRAIN PIPE, SEE E−5204.
10. CABLE SUPPORT SYSTEM SHALL BE CAPABLE OF SUPPORTING 300LB
POINT LOADS. SEE E−5203.
11. PROVIDE WATER PROOFING ON ALL EXTERIOR SURFACES IN CONTACT
WITH SOIL. APPLY AQUAFIN 1−K CEMENTITIONS WATER PROOFING OR
EQUAL.
12. CAST IN PLACE STEPS ARE NOT REQUIRED.
13, LOOP CABLE 360° IN HANDHOLE ON CABLE SUPPORT SYSTEM.
14. PROVIDE HOLE FOR GROUND ROD. GROUND ROD TO BE DRIVEN INTO
THE GROUND AFTER THE MANHOLE HAS BEEN SET IN PLACE SEAL THE
VOID BETWEEN CONCRETE AND GROUND ROD WITH NON−SHRINK
GROUT.
15. EVERY CABLE SHALL BE LABELED WITH A CIRCUIT IDENTIFICATION
TAG WITHIN 2’ OF ENTERING AND 2’ PRIOR TO EXITING A HANDHOLE.
SEE CABLE IDENTIFICATION DETAIL E−5001.
NOTES
3/4"x10" COPPERCLAD
GROUND ROD
12" DEEP LAYER OF FREE DRAINING
GRAVEL FILL ON UNDISTURBED
SOIL COMPACTED TO 95%
A−A 4’x4’ HANDHOLE ELEVATION N.T.S.
A
2" ISOLATION JOINT 4" 3,500 PSI PCC1’
A A
4’x4’ HANDHOLE PLAN N.T.S.
PVC CONDUIT. NUMBER VARIES.
SEE NOTE 7.
4" SUMP FRAME AND
COVER. SEE E−5204.
3/4"x10 FT COPPERCLAD
GROUND ROD
CABLE SUPPORT SYSTEM.
SEE NOTE 10.
4’
6"
3’
3’
4’+2d
M
IN
" 6
M
IN
6" MIN.
HANDHOLE FRAME
AND LID. SEE NOTE 4.
GRADE 1
4" / FT
GRADE 14" / FT
REFERENCE POINT
SHOWN IN TABLE
SCORED OR SAWCUT
CONTRACTOR JOINT (TYP.)
d
1/2" ISOLATION JOINT
SEE NOTE #9
d d
DUCT BANK TIE
BAR INSERT (TYP).
SEE NOTE 8.
KEYED INTERFACE WITHIN 6" MINIMUM
OF THE BOTTOM OF MANHOLE ROOF.
USE 2 RINGS OF SEALING MASTIC.
CABLE SUPPORT BRACKET.
TYPICAL OF 4. SEE E−5203.
DUCT BANK CONFIGURATIONS. SEE E−5301.
AT HANDHOLE ENTRY, SPACING BETWEEN 2"
CONDUITS MAY SHRINK TO MINIMUM OF 4"
CENTER TO CENTER.
#4 BARE COPPER GROUND
SEE NOTES 5 & 6
SLOPE FLOOR TO
DRAIN 14"/FT
PROPERLY GLUE
ALL JOINTS
CONNECT 4" PVC DRAIN TO
ELECTRICAL DRAINAGE SYSTEM
SEAL AROUND GROUND ROD
WITH NON−SHRINK GROUT
BACKFILL IN MAX. 6" LIFTS
TO 90% MAX. DENSITY
4" BASE COURSE AGG.
4" 95% MINIMUM
SUBGRADE COMPACTION
2" AFTER COMPACTION
AND SEEDING
8"
MIN.
M
IN
BOND GROUND TO FRAME AND COVER
E L
E C
T R
IC
A
L H
A N
D H
O L
E D
E T
A
IL
S
A B C D E F G H I
D e s ig n b y:
D w n b y:
P a g e
S iz e
C M
T P
R O
JE
C
T
P lo t D a te
P ro je c t D a te
C h k b y:
D E
S C
R
IP
T
IO
N A
P P
R O
V E
D
A t
F u ll S iz e
S h e e t 2
"x
P R
O J E
C T
N U
M B
E R
Sheet of
Dwg. No.
C o p yr ig h t
C M
T
In c.
c
C O
N S
U
LT
IN
G
E N
G
IN
E E
R S
C R
A W
F O
R D
, M U
R P
H Y
T
IL
LY
, I N
C
W . W
A S
H
IN
G T
O N
S T
R E
E T
S P
R
IN
G F
IE
LD
, I L
(2
)7
-8 w w w .c m te ng r.
co m
D A
T E
YT C
BILI MO
M
MO
I A
R D
AN
P lo t B y:
−J u l−
:3
T o m M e m m in g e r
P lo t S c a le
:2
R E
V
IS
IO
N
VOL. 1 of 1
A p p ro ve d
THOMAS
MEMMINGER
062−053744
STA
TE OF ILLIN
O
IS
P R
Q E
−0 P
R E
P A
IR
S
O U
T H
D U
C T
B A
N K
PRQE 05−0101P2
E−5202
M C
C O
N N
E L
L A
F B
K
A N
S A
S
D
C
IV
IL
E
N G
IN
E
E R
IN
G
S Q
U A
D R
O N
A
IR
M O
B
IL
IT
Y
C O
M M
A N
D
D E
P A
R T
M E
N T
O F
T H
E A
IR
F
O R
C E
−M A
R −2
A
JG
C M
T
A
JG
−0
E −5
T M
D E
S
IG
N C
H A
N G
E
−J
U L −1
T
M
DC01 23-JUL-13
DC 1
DC 1
DC 1
FA4621-13-R-0003 Electrical Handhold Details Attachment 9