Atch_10_-_E-5302-E-5302_Duct_Band_and_Counterpoise_Construction_Details.pdf
PDF 417 KB Posted
- Attached to
- Repair (Sus) Airfield Lighting System (South)
- Solicitation number
- FA4621-13-R-0003
About this file
FA4621-13-R-0003 Duct Bank and Counterpoise Drawing
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIVE SOIL COMPACTED
TO 95% DENSITY OR
NEW PAVEMENT
B
B
N.T.S.
SECTION B−B
4" NON−PERFORATED PVC PIPE AND
FITTINGS WHERE SHOWN ON PLANS.
SEE E−6101 FOR SCHEDULE.
UNDISTURBED EARTH
BURIAL DEPTH AS REQUIRED
TO DRAIN.
FINISHED GRADE
#4 BARE COPPER
COUNTERPOISE
3"
MINIMUM DEPTH:
2−WAY DUCTS − 29 INCHES
ALL OTHER DUCTS − 24 INCHES
INTERMEDIATE SPACER
BASE SPACER
USE SIDE FORMS
WHERE NECESSARY
WARNING TAPE
CONCRETE
ENCASED DUCT
BANK. SEE NOTE 2.
4" X 10’ COPPER
CLAD GROUND
ROD
BOND COUNDERPOISE TO
GROUND ROD USING ONE SHOT
EXOTHERMIC WELD
12"
MIN.
N.T.S.
30" #4 TIE BAR. MINIMUM 4 PER COLD JOINT
EMBEDDED IN WET CONCRETE. (TYP)
15"
2.25"
2.25"
SEE E−5301 FOR DUCT
BANK CONFIGURATIONS
#4 TIE BARS WHERE
NEEDED. SEE COLD
JOINT DETAIL THIS
SHEET.
2.25"
2.25"
4’−0"
MAX
2" NOMINAL CONDUIT
SUPPORT AS NEEDED TO KEEP
TIE BAR HORIZONTAL. (TYP)
1. FOR NON−METALLIC CONDUITS, TERMINATE WITH PLASTIC COUPLINGS SET FLUSH WITH
END OF CONCRETE ENVELOPE AND INSTALL PLASTIC PLUGS.
2. CONCRETE FOR CONCRETE ENCASED DUCT SHALL CONTAIN A RED DYE TO IDENTIFY
DUCT AS AIRFIELD ELECTRICAL DUCT BANK.
3. INSTALL COUNTERPOISE WITH ALL DUCT BANK AND CONDUIT.
4. DO NOT CONNECT COUNTERPOISE TO LIGHT BASES OR MANHOLES/HANDHOLES
GROUNDING COMPONENTS. LOOP COUNTERPOISE AROUND ALL MANHOLES.
5. PROVIDE GROUND RODS SPACED MAX. 1,000−FT.
6. WHEN UNDER PAVEMENT PLACE COUNTERPOISE ON NEXT−TO−LAST LIFT OF COMPACTED
BASE MATERIAL.
7. SEE SHEET E−5301 FOR RE−INFORCEMENT DETAILS.
8. PLACE EACH SERIES CIRCUIT IN ITS OWN 2 INCH CONCRETE ENCASED PVC CONDUIT. USE
#6 AWG, 5KV, FAA L−824 CONDUCTORS AND ONE #6 AWG, THWN GREEN INSULATED
GROUND PER CIRCUIT.
9. DO NOT BACKFILL OVER COUNTERPOISE BEFORE COR HAS TESTED EXOTHERMIC WELDS
WITH A HAMMER AND VISUALLY INSPECTED COUNTERPOISE.
3’ − 8’
3"
MIN.
1"
MIN.
BACKFILL WITH SUBDRAIN
BEDDING MATERIAL
(33 46 16)
D U
C T
B A
N K
A N
D C
O U
N T
E R
P O
IS
E
C O
N S
T R
U C
T
IO
N D
E T
A
IL
S
A B C D E F G H I
D e s ig n b y:
D w n b y:
P a g e
S iz e
C M
T P
R O
JE
C
T
P lo t D a te
P ro je c t D a te
C h k b y:
D E
S C
R
IP
T
IO
N A
P P
R O
V E
D
A t
F u ll S iz e
S h e e t 2
"x
P R
O J E
C T
N U
M B
E R
Sheet of
Dwg. No.
C o p yr ig h t
C M
T
In c.
c
C O
N S
U
LT
IN
G
E N
G
IN
E E
R S
C R
A W
F O
R D
, M U
R P
H Y
T
IL
LY
, I N
C
W . W
A S
H
IN
G T
O N
S T
R E
E T
S P
R
IN
G F
IE
LD
, I L
(2
)7
-8 w w w .c m te ng r.
co m
D A
T E
YT C
BILI MO
M
MO
I A
R D
AN
P lo t B y:
−J u l−
:3
T o m M e m m in g e r
P lo t S c a le
:2
R E
V
IS
IO
N
VOL. 1 of 1
A p p ro ve d
THOMAS
MEMMINGER
062−053744
STA
TE OF ILLINO
IS
P R
Q E
−0 P
R E
P A
IR
S
O U
T H
D U
C T
B A
N K
PRQE 05−0101P2
E−5302
M C
C O
N N
E L
L A
F B
K
A N
S A
S
D
C
IV
IL
E
N G
IN
E
E R
IN
G
S Q
U A
D R
O N
A
IR
M O
B
IL
IT
Y
C O
M M
A N
D
D E
P A
R T
M E
N T
O F
T H
E A
IR
F
O R
C E
−M A
R −2
A
JG
C M
T
A
JG
−0
E −5
T M
DC 1
D E
S
IG
N C
H A
N G
E
−J
U L −1
T
M
DC01 23-JUL-13
FA4621-13-R-0003 Duct Bank and Counterpoise Attachment 10
File details come from the government source that posted it. Updated .