Attachment_7_K7-VAFB_Specific_Requirements.docx

DOCX document 67 KB Posted

Attached to
Replace Feeder K7 - Phase II Federal contract opportunity
Solicitation number
FA4610-15-R-0005
Issued by
Department of the Air Force Space Command

About this file

VAFB Specific Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Replace Feeder K7 - Phase II, newest first.
File Type Posted
Attachment_2_Revised_SOW_Replace_Feeder_K7-14_Apr.docx DOCX document
FA4610-15-R-0005_Conformed_Through_Amendment_0005.pdf PDF
FA4610-15-R-0005-0005.pdf PDF
FA4610-15-R-0005_Conformed_Through_Amendment_0004.pdf PDF
FA4610-15-R-0005-0004.pdf PDF
FA4610-15-R-0005-0003.pdf PDF
FA4610-15-R-0005-0002.pdf PDF
Q A's.pdf PDF
FA4610-15-R-0005-0001.pdf PDF
Site_Visit_Sign-In.pdf PDF
Attachment_9_No_Dig_Example_Letter.pdf PDF
Attachment_1_DB_Wage_Determination.docx DOCX document
Attachment_4_K7-Phases.jpg JPG image
Attachment_5_K7-Project_Specific_Environmental_Requirements.docx DOCX document
Attachment_10_Environmental_Specs_Oct2014.doc DOC document
Attachment_8_Lompoc_Gate_Procedures.pdf PDF
Attachment_2_SOW_Replace_Feeder_K7-31_Jul.pdf PDF
FA4610-15-R-0005.pdf PDF
Attachment_6_SYBCI_Monitoring_Contract_2010-06.doc DOC document
Attachment_3_K-7_FINAL_Drawings_1881.pdf PDF
Attachment_11_AvianProtectionPlanGuidelines.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4610-15-R-0005

Attachment 7

3.0 Vandenberg AFB Specific Requirements

3.1 Power Outages

Scheduled power outages shall be minimized and performed on weekends, if necessary, to avoid interruption to Stakeholder personnel facilities and/or launch operations. A minimum of 21 days advanced notice of planned power outages is required. Power outages shall be minimized in all cases and limited to initial disconnections and final connections.

3.1 Stakeholder Requirements

The Contractor shall coordinate with all stakeholders during design and construction. Roadways on South Base are utilized for transportation of oversized vehicles. Setback distances of proposed circuits may vary depending on Stakeholder requirements, including but not limited to crossings of Coast Road must either be underground or at least 93.6 feet high from the road in order to clear the highest payload. Proposed circuit alignments must be a minimum of 10-feet away from the edge of the road at any height.

3.2 Under-build Requirements

Under-built lines are not desired by Base Personnel. If any changes in alignment are necessary during construction, under-built lines shall be avoided.

3.3 “No Dig” Requirement The Contractor shall estimate and account for, as applicable, in the construction schedule “no dig” periods associated with launch activities. Contractor shall assume 7 calendar days per launch and 1 launch per month, totaling 84 calendar days per year. See ”No dig” example letter shown in this attachment.

3.4 Lompoc Gate Procedures

Construction vehicles are required to enter through the Lompoc Gate only, including access to South Base. See Lompoc Gate procedure requirements shown in this attachment.

3.5 Pole Nomenclature Requirement

Poles shall be physically labeled and annotated on drawings using Vandenberg’s nomenclature system. See example below.