12-R-0004 _A2 _Painting _Exhibit_A_Pricing_Schedule.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Base Widw Corrosion Control Painting Federal contract opportunity
Solicitation number
FA4610-12-R-0004
Issued by
Department of the Air Force Space Command

About this file

Attachment 2 12-R-0004 Painting Exhibit A Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Base Widw Corrosion Control Painting, newest first.
File Type Posted
FA4610-12-R-0004_Conformed_Copy.pdf PDF
FA4610-12-R-0004-0002 _Paint.pdf PDF
12-R-0004 _Corrosion-Paint _Q-n-A.docx DOCX document
12-R-0004_Painting_Presentation_(4_Jun_14).pdf PDF
12-R-0004_Minutes.pdf PDF
FA4610-12-R-0004-0001 _Paint.pdf PDF
12-R-0004 _A6 _Facility_excellence.pdf PDF
12-R-0004 _A5 _Task_Ordr_Work_Sheet.xlsx XLSX spreadsheet
12-R-0004 _A1 _Painting_SOW.doc DOC document
FA4610-11-R-0004 _Paint.pdf PDF
12-R-0004 _A4 _CA140023.doc DOC document
12-R-0004 _A7 _Demo_SOO.docx DOCX document
12-R-0004 _A3_VAFB_Environmental_Compliance_Requirements.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Period

SUBLINE ITEMTASKESTIMATED WORKLOADUNIT OF MEASUREUNIT PRICEESTIMATED AMOUNT
0001AAExterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1880,000SF
0001ABSecond coat of finish, exterior. Par: 1.2.9.270,000SF
0001ACContaminant testing and reports. Par: 1.2.9.340EA
0001ADPower wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4437,870SF
0001AEPower wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.53,600SF
0001AFWet scraping. Par: 1.2.9.62,020SF
0001AGPower tooling. Par: 1.2.9.743,500SF
0001AHExterior bond prep. Par: 1.2.9.8120,550SF
0001AJRust inhibiting primer. Par: 1.2.9.910,200SF
0001AKBlock sealing. Par: 1.2.1016,000SF
0001ALElastomeric coating Par: 1.2.119,000SF
0001AMCoating, Rust Bond FC: 1.2.13.355,000SF
0001ANCoating, Carbomastic 15: 1.2.13.255,000SF
0001AOCoating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.355,000SF
0001APAbrasive blast cleaning: Par 1.2.1439,303SF
0001AQStucco repair. Par: 1.2.1540EA
0001ARBasewide traffic striping. Par: 1.3.1200,000LF
0001ASParking lot striping. Par: 1.3.220,000LF
0001ATDirectional arrows. Par: 1.3.350EA
0001AUHandicapped parking. Par: 1.3.430EA
0001AVOther traffic markings. Par: 1.3.515,000SF
0001AWStriping and marking of airfields & helipads. Par: 1.3.612,000SF
0001AXInterior protective coating, one coat of finish. Par: 1.4.360,000SF
0001AYHospital interior, one coat of finish. Par: 1.4.41,000SF
0001AZBed and tape drywall surfaces. Par: 1.4.53,000SF
0001BAApply texture, hand or machine. Par: 1.4.610,000SF
0001BBPrime interior walls. Par: 1.4.760,000SF
0001BCPatch holes in drywall up to one square foot each in size. Par: 1.4.8160EA
0001BDWallpaper removal. Par: 1.4.91,400SF
0001BEEpoxy coating. Par: 1.5.110,000SF
0001BFUrethane coating: Par. 1.5.210,000SF
0001BGNonskid coating. Par: 1.5.33,000SF
0001BHConcrete floor layout and painting. Par: 1.5.4600LF
0001BJWork other than normal duty hours: Par. 1.64,000SF
0001BKNon priced items: Para. 1.710,000SF
Basic Period Estimated Total$ - 0

&"Times New Roman,Regular"FA4610-12-R-0004 Attachment 2 Exhibet A, Pricing Schedule

Option 1

SUBLINE ITEMTASKESTIMATED WORKLOADUNIT OF MEASUREUNIT PRICEESTIMATED AMOUNT
1001AAExterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1760,000.00SF
1001ABSecond coat of finish, exterior. Par: 1.2.9.230,000.00SF
1001ACContaminant testing and reports. Par: 1.2.9.320EA
1001ADPower wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4437,870.00SF
1001AEPower wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.53,600.00SF
1001AFWet scraping. Par: 1.2.9.61,600.00SF
1001AGPower tooling. Par: 1.2.9.78,000.00SF
1001AHExterior bond prep. Par: 1.2.9.8100,000.00SF
1001AJRust inhibiting primer. Par: 1.2.9.96,000.00SF
1001AKBlock sealing. Par: 1.2.1016,000.00SF
1001ALElastomeric coating Par: 1.2.118,000.00SF
1001AMCoating, Rust Bond FC: 1.2.13.151,200.00SF
1001ANCoating, Carbomastic 15: 1.2.13.251,200.00SF
1001AOCoating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.351,200.00SF
1001APAbrasive blast cleaning: Par 1.2.1439,303.00SF
1001AQStucco repair. Par: 1.2.1540EA
1001ARBasewide traffic striping. Par: 1.3.1130,944.00LF
1001ASParking lot striping. Par: 1.3.26,000.00LF
1001ATDirectional arrows. Par: 1.3.322EA
1001AUHandicapped parking. Par: 1.3.48EA
1001AVOther traffic markings. Par: 1.3.57,000.00SF
1001AWStriping and marking of airfields & helipads. Par: 1.3.612,000.00SF
1001AXInterior protective coating, one coat of finish. Par: 1.4.356,484.00SF
1001AYHospital interior, one coat of finish. Par: 1.4.41,000.00SF
1001AZBed and tape drywall surfaces. Par: 1.4.51,304.00SF
1001BAApply texture, hand or machine. Par: 1.4.64,691.00SF
1001BBPrime interior walls. Par: 1.4.741,948.00SF
1001BCPatch holes in drywall up to one square foot each in size. Par: 1.4.8160EA
1001BDWallpaper removal. Par: 1.4.92,723.00SF
1001BEEpoxy coating. Par: 1.5.17,000.00SF
1001BFUrethane coating: Par. 1.5.27,000.00SF
1001BGNonskid coating. Par: 1.5.33,000.00SF
1001BHConcrete floor layout and painting. Par: 1.5.4600.00LF
1001BJWork other than normal duty hours: Par. 1.63,400.00SF
1001BKNon priced items: Para. 1.77,000.00SF
Estimated Total$ - 0

&"Times New Roman,Regular"FA4610-12-R-0004

Option 2

SUBLINE ITEMTASKESTIMATED WORKLOADUNIT OF MEASUREUNIT PRICEESTIMATED AMOUNT
2001AAExterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1760,000.00SF
2001ABSecond coat of finish, exterior. Par: 1.2.9.230,000.00SF
2001ACContaminant testing and reports. Par: 1.2.9.320EA
2001ADPower wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4437,870.00SF
2001AEPower wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.53,600.00SF
2001AFWet scraping. Par: 1.2.9.61,600.00SF
2001AGPower tooling. Par: 1.2.9.78,000.00SF
2001AHExterior bond prep. Par: 1.2.9.8100,000.00SF
2001AJRust inhibiting primer. Par: 1.2.9.96,000.00SF
2001AKBlock sealing. Par: 1.2.1016,000.00SF
2001ALElastomeric coating Par: 1.2.118,000.00SF
2001AMCoating, Rust Bond FC: 1.2.13.151,200.00SF
2001ANCoating, Carbomastic 15: 1.2.13.251,200.00SF
2001AOCoating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.351,200.00SF
2001APAbrasive blast cleaning: Par 1.2.1439,303.00SF
2001AQStucco repair. Par: 1.2.1540EA
2001ARBasewide traffic striping. Par: 1.3.1130,944.00LF
2001ASParking lot striping. Par: 1.3.26,000.00LF
2001ATDirectional arrows. Par: 1.3.322EA
2001AUHandicapped parking. Par: 1.3.48EA
2001AVOther traffic markings. Par: 1.3.57,000.00SF
2001AWStriping and marking of airfields & helipads. Par: 1.3.612,000.00SF
2001AXInterior protective coating, one coat of finish. Par: 1.4.356,484.00SF
2001AYHospital interior, one coat of finish. Par: 1.4.41,000.00SF
2001AZBed and tape drywall surfaces. Par: 1.4.51,304.00SF
2001BAApply texture, hand or machine. Par: 1.4.64,691.00SF
2001BBPrime interior walls. Par: 1.4.741,948.00SF
2001BCPatch holes in drywall up to one square foot each in size. Par: 1.4.8160EA
2001BDWallpaper removal. Par: 1.4.92,723.00SF
2001BEEpoxy coating. Par: 1.5.17,000.00SF
2001BFUrethane coating: Par. 1.5.27,000.00SF
2001BGNonskid coating. Par: 1.5.33,000.00SF
2001BHConcrete floor layout and painting. Par: 1.5.4600.00LF
2001BJWork other than normal duty hours: Par. 1.63,400.00SF
2001BKNon priced items: Para. 1.77,000.00SF
Estimated Total$ - 0