CLIN 0007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 0007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
0007AField Electrical Engineer (PE)$ - 0xLabor Hour33.00=$ - 0
0007BSubstation Maintenance Electrician$ - 0xLabor Hour263.00=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

0007D Government-Provided Estimated Cost for Material $ 10,000.00 (Block E)

Total Proposed Price for CLIN 0007 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0007.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR).

&"-,Bold"&14Price Breakdown Sheet CLIN X007 Repairs

25 Sep 2013 - 24 Sep 2014 (Base Period) CLIN 0007 Repairs

Price Breakdown Sheet

FA4610-11-R-0037

Attachment 3

CLIN 1007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 1007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
1007AField Electrical Engineer (PE)$ - 0xLabor Hour33.00=$ - 0
1007BSubstation Maintenance Electrician$ - 0xLabor Hour263.00=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

1007D Government-Provided Estimated Cost for Material $ 10,000.00 (Block E)

Total Proposed Price for CLIN 1007 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1007.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown Sheet CLIN 1007 Repairs

25 Sep 2014 - 24 Sep 2015 (OY1) CLIN 1007 Repairs

Price Breakdown Sheet

CLIN 2007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 2007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
2007AField Electrical Engineer (PE)$ - 0xLabor Hour33.00=$ - 0
2007BSubstation Maintenance Electrician$ - 0xLabor Hour263.00=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

2007D Government-Provided Estimated Cost for Material $ 10,000.00 (Block E)

Total Proposed Price for CLIN 2007 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2007.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown Sheet CLIN 2007 Repairs

25 Sep 2015 - 24 Sep 2016 (OY2) CLIN 2007 Repairs

Price Breakdown Sheet

CLIN 3007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 3007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
3007AField Electrical Engineer (PE)$ - 0xLabor Hour33.00=$ - 0
3007BSubstation Maintenance Electrician$ - 0xLabor Hour263.00=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

3007D Government-Provided Estimated Cost for Material $ 10,000.00 (Block E)

Total Proposed Price for CLIN 3007 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3007.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown Sheet CLIN 3007 Repairs

25 Sep 2016 - 24 Sep 2017 (OY3) CLIN 3007 Repairs

Price Breakdown Sheet

CLIN 4007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 4007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
4007AField Electrical Engineer (PE)$ - 0xLabor Hour33.00=$ - 0
4007BSubstation Maintenance Electrician$ - 0xLabor Hour263.00=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

4007D Government-Provided Estimated Cost for Material $ 10,000.00 (Block E)

Total Proposed Price for CLIN 4007 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4007.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown Sheet CLIN 4007 Repairs

25 Sep 2017 - 24 Sep 2018 (OY4) CLIN 4007 Repairs

Price Breakdown Sheet

CLIN 5007 Repairs Substation Maintenance

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 3 - Price Breakdown Sheet.
CLIN 5007 Repairs: Proposed Firm Fixed-Price Labor Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
5007AField Electrical Engineer (PE)$ - 0xLabor Hour16.50=$ - 0
5007BSubstation Maintenance Electrician$ - 0xLabor Hour131.50=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

5007D Government-Provided Estimated Cost for Material $ 5,000.00 (Block E)

Total Proposed Price for CLIN 5007 (Sum of Blocks D + E = F) $5,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 5007.
Prices for labor rates in CLIN 5007 MUST be the same as the hourly rates in CLIN 4007 in Option Year 4.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown Sheet CLIN 5007 Repairs

25 Sep 2018 - 24 Mar 2019 (6-Month Extension) CLIN 5007 Repairs

Price Breakdown Sheet

File details come from the government source that posted it. Updated .