Architect_Clarification_on_A3.7.docx

DOCX document 13 KB Posted

Attached to
Repair 307th BW AMXS B6825 Federal contract opportunity
Solicitation number
FA4608-16-R-0011
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair 307th BW AMXS B6825, newest first.
File Type Posted
A3.7.pdf PDF
CD_No1-Model.pdf PDF
Question_Set_5 _1_June_2016_(Final).docx DOCX document
A3.15_Enlarged_Elevator_Plans_Penthouse_Detail.pdf PDF
Question_Set_4 _24_May_2016.docx DOCX document
Amendment_0003.pdf PDF
Revised_Specs.pdf PDF
Question_Set_3 _17_May_2016.docx DOCX document
Question_Set_2 _10_May_2016.docx DOCX document
Site_Visit_Sign_In_Sheet.pdf PDF
Amendment_0002.pdf PDF
Question_Set_1_2_May_2016.docx DOCX document
Drawings_PDF.zip ZIP file
Attachment_8_-_Revised_PPQ_Cover_Letter.pdf PDF
Attachment_1-Specifications.pdf PDF
Attachment_5-_Insurance.pdf PDF
Amendment_0001_Attachment_8_Revised.pdf PDF
Attachment_2-Drawings.pdf PDF
FA4608-16-R-0011.pdf PDF
Attachment_11-Bid_Schedule.xls XLS spreadsheet
Attachment_9-_Special_Contract_Requirements.pdf PDF
Attachment_8_-_PPQ_Cover_Letter.pdf PDF
Attachment_4_-_AF66.pdf PDF
Amendment_0001.pdf PDF
Attachment_7_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6-Wage_Determinations.pdf PDF
Attachment_3-_Environmental_Req'ts_(Oct_15).pdf PDF
Attachment_10_-_Subcontractor_Consent_Form.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Architect Clarification on A3.7 Question: Referencing Sheet A3.7 (attached), please confirm the assumption that the only Work the Contractor is supposed to perform in the illustrated newly added area is the removal and replacement of one exterior door.

Answer: Scope of work in AGE Building actually includes TWO items:

1. Install one new door in exterior wall as shown in plan.

2. Install one new drinking fountain - same type as already specified for other areas in this project.

NOTE: Plan indicates to install new water fountain near new door. Relocate water fountain to be installed just outside the Men and Women Restroom where the common plumbing chase wall is.