Question #1: Please confirm that ALL interior paint scopes exclude any door or window frames, ceilings, floors, or areas requiring ladder/scaffold work.

Answer: All door or window frames, ceilings, floors, or areas requiring ladder/scaffold work are exclude from painting.

Question #2: Please confirm that the project scope is exclusively for painting, striping, and signage as indicated and that drywall repair is excluded. If this is to be included, can we add this as an itemized cost on a price per square foot basis or similar.

Answer: Drywall repair is included only for small repairs i.e. nail marks, small scratches not greater than 1 inch.

Question #3: Please confirm that the exterior walkway paint line items under work orders 3541439, 3541420, and 3541408 require no special floor preparation and that a light sweeping is adequate prior to priming and painting. If alternatives are desired, please specify.

Answer: Confirmed. Clean existing lines per manufacturer instructions and paint.

Question #4: Please define the surface preparation desired on the Aircraft line work orders.

Answer: Clean existing lines per manufacturer instructions and paint.

Question #5: Please confirm that the government will be responsible for moving all furniture, lights, wall fixtures, and signage so that contractors are able to work directly in the areas without delay.

Answer: Confirmed. All movable furniture, signs, lights, wall fixtures will be removed by the government. All permanent furniture, signs, lights, wall fixtures will be taped over.