Question #1: Item 9 - Will a map outlining the areas requiring striping be provided?
Answer: Yes, area map will be provided with outlines of the areas requested for striping.
Question #2: Item 10 - Will a map outlining the areas to be painted be provided? Also will this project require night or weekend work?
Answer: Yes, area map will be provided with outlines of the areas requested for striping. Bldg 434 is the Fitness Center thus after hours or weekends are preferred.
Question #3: Item 12- Same questions as item 10
Answer: Item 12 is interior paint. A floor plan can be provided upon request.
Question #4: Item 55 - Will this item require installing the standard 2"x2" dark bronze anodized aluminum posts for the signs to be attached to?
Answer: Bldg. number signs are attached to the bldg. Does not require any post.
Question #5: Item 60 - For the standard 42"x 30" .080 aluminum D2 signs are they one panel each sign or two as is usual? Will standard 3"x3" dark bronze anodized aluminum frames be required for either?
Answer: Two sided sign with frame/post.