Attachment I - Statement of Work Dated 7 January 2020.pdf

PDF 48 KB Posted

Attached to
Travis AFB Various Base Paint Projects
Solicitation number
FA442720R0009
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 Jan 2020

STATEMENT OF WORK

PAINT SIGN STRIPING

GENERAL DESCRIPTION:

The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line item task listing description, and in accordance with (IAW) the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards. Point of contact for this project will be provided at the time of award.

DESCRIPTION OF WORK: FY20 O&M Paint sign & striping projects

Project No.

W/O # BLDG Description

4585774

Interior paint, 150SF

5304410

Interior paint, 750SF

6046107

Interior paint, 1550SF

3541439

Interior paint,1800SF

3541420

3541408

3867923

Interior paint, 2SF

6497094

Interior paint, 35SF

5430682

8 inch Aircraft lines, 2143LF

4046826

Interior paint, 5400SF

4434501 574 Interior paint,1620SF

3434310

Interior paint,900SF

5656150 381

Interior paint,1600SF

6070584

Restripe, 75 parking spots,1350LF

5863497

Restripe, 33 parking spots,375LF

5916772

Interior paint,16SF

5983407

Interior paint,3624SF

6835746

Interior paint,725SF

5135060

Interior paint,10SF

5361717

Interior paint,12SF

5491384

Interior paint,150SF

22 5255021

Interior paint,15SF

5584514

Interior paint,160SF

5581144

Interior paint,160SF

4620295

Interior paint,175SF

4530961 410

Interior paint,175SF

5490919 181

Interior paint,1SF

5195580 176

5189613 176

5440378 660

Interior paint,20SF

5389858 434

Interior paint,20SF

6352957 1355

Interior paint,21SF

5107519 187

Interior paint,22SF

4510907 7763

Interior paint,250SF

5641204 1308

Interior paint,2SF

5454098 409

Interior paint,2SF

5448854 1314

Interior paint,3SF

5450994 380

Interior paint,3SF

6873290 861

Interior paint,432SF

5228757

176 Interior paint, 42SF

41 3966434 381 Interior paint 8624SF

42 3136313 934 Interior paint 280SF

43 2194053 249 Interior paint, 8SF

44 3136160 249 Interior paint, 8SF

45 5491336 1309 Interior paint, 45SF

46 5434355 241 Interior paint, 60SF

47 5383002 664 Interior paint, 3600SF

48 5202621 170 Interior paint, 140SF

49 5143080 214 Interior paint, 384SF

50 5255364 381 Interior paint, 350SF

51 4381417 205 Interior paint, 45SF

52 5155660 381 Interior paint, 150SF

53 5562189 1 Interior paint, 5700SF

54 6304556

SITE

VISIT

Make/Install 142 bldg number signs.

Consolidated

55 4666426

SITE

VISIT

Make/Install 9 desig.

smoking signs, lodging

56 6229145 1354 Make/Install 1 room sign, bldg 1354

57 5890428 130 &

Make/Install 2 bldg signs. Bldg 130 & 934

58 6207240 2010

Make/Install 1 fuel tank area sign. Bldg 2010

59 5345855 7690

Make/Install 1 bldg sign.

Bldg 7690

60 6020550 80&251

Make/Install 2 D2 signs.

Bldg 80&251

6771546

905 Interior paint, 4300SF

4116218

648 Interior paint, 460SF

5260704

1351 Interior paint, 4SF

5277309

1351 Interior paint, 4SF

5491227

1314 Interior paint, 6SF

5499344

1314 Interior paint, 6SF

4932319

1355 Interior paint, 6SF

5228757

442 Interior paint, 70SF

4340270

39 Interior paint, 720SF

70 3581146

1178 Interior paint, 75SF

5298749

10 Interior paint, 75SF

72 5314660

185 Interior paint, 8SF

4917767

1348 Interior paint, 7218SF

6707656

570 Interior paint, 15133SF

6707669

571 Interior paint, 9109SF

76 5486184 440 Interior paint, 42 SF

77 5484894 440 Interior paint,42 SF

78 5481132 1353 Interior paint, 8SF

79 5255364 993 Interior paint, 72 SF

80 5491336 14 Interior paint, 50 SF

ADDITIONAL REQUIREMENTS:

1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.

2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.

3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.

4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.

5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.

6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.

7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.

8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit

9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.

10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.

PERIOD OF PERFORMANCE:

All work orders will be completed in sixty days (60) days after receipt NTP.

File details come from the government source that posted it. Updated .