Question 1: Do the dimensions provided for each building represent the square feet of the floor (of the room(s)) or the square feet of the surface to paint?

Answer: The square footage is the size of the area that requires paint.

Question 2: Number 2 on the “statement of work” states that, “Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work”. Are those “working drawings” being provided to the contractors from the Government, or is the contractor responsible for those “drawings”? If the government is providing the drawings, will they be made available before, or at, the bid walk?

Answer: The Govt. can provide bldg. plans, but it’s the contractor’s responsibility by utilizing the site visit.

Question 3: Number 7 on the “statement of work” states that, “All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.” Is it safe to assume that you only requesting that we “finish” items that were previously painted and/or stained and exclude pre-finished items? Are there items that involve staining or re-staining?

Answer: YES, (“only requesting that we “finish” items that were previously painted and/or stained and exclude pre-finished items”), additional staining or re staining will be added in a modification as needed.

Question 4: Are the finishing colors/stains in all of the buildings to match what currently exists?

Answer: Yes, unless requested by the end user and approved by CE.

Question 5: May you please provide the dimensions/designs of the signs that are required for the sign install.

Answer: Facility number signs: 8” x 16” Measurements and dimensions are too much to list for directional signs(D2) and building signs(B3) please refer to UFC 3-120-01

Question 6: Can you provide us with a link or a copy of the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14?

Answer: This file is too large and will be provided via DoD SAFE to each requesting party.

Please provide instructions when ready to post this notice.

Question 7: Referencing the Statement of Work...Project Number 9, Work Order number 5430682, in Bldg 1175....Can you tell me if that Striping for Aircraft Lines will be Re Striping existing markings, or if it will be New Layout?"

Answer: The markings already exist just faded.