QA_round_two.docx

DOCX document 22 KB Posted

Attached to
Repair Warehouses, Bldgs. 65, 910 and 3514
Solicitation number
FA4418-15-R-0027
Issued by

About this file

Question and Answers posted 1 September 2015.

View the file

Other files

File Type Posted
Amendment_003.doc DOC document
Clarification_of_Q A.pdf PDF
QA_RFP06.docx DOCX document
Addendum_001.pdf PDF
15-R-0027-0001.pdf PDF
Attachment_38-_Part_2 _Attachment_A _Project-Specific_General_Requirements.pdf PDF
Attachment_39-_FIRE_PROTECTION_JBC_FD_Design_Guide.pdf PDF
Site_Visit_Attendance.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attach_33_existing_drawings-_floor_plan.PDF PDF
Attach_22_Bldg._65_Attachments.pdf PDF
Attach_18_part_4_Bldg._65_SOW.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
WDOL.docx DOCX document
Attach_19_Part_3_Bldg._910_SOW.pdf PDF
GPDF_Form_for_WS_3514_910_65.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attach_32_Existing_Drawings-_elevation.PDF PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attach_27_Bldg._910_Existing_Drawings.PDF PDF
Attch_04_01_30_00_ADMINISTRATIVE_REQUIREMENTS.pdf PDF
Attach_26_Part_6_Bldg._910_attachments.pdf PDF
Attach_34_HAZMAT_Survey_1996.PDF PDF
Attach_23_Bldg._65_exterior_photo.jpg JPG image
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attach_29_Photographs.jpg JPG image
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attach_25_HAZMAT_Survey.PDF PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attach_31_Photographs.jpg JPG image
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
FA4418-15-R-0027.doc DOC document
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attach_28_Bldg._910_HAZMAT_Survey_1997.PDF PDF
Attach_35_NPTU_Special_Considerations.pdf PDF
Atch_21 _Part_4_Minimum_Materials_Warehouse_Repair.pdf PDF
Attach_30_Part_6_Attachments.pdf PDF
Attach_24_Bldg._65_Plan_and_Elevations.PDF PDF
Attach_20_Part_3_bldg._3514_SOW.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Combined RFP for WS-3514, 910 and 65. 8/31/15 Question and Answer Round 2 Bldg 65

08 Openings Item #1 states to remove existing and #2 states to Install existing windows and vents; 6.0 B2010 states new louvers and B2020 states provide new windows. Which is correct?

PM RESPONSE: #2 “Install existing windows and vents” shall be changed to “Install NEW windows and vents”

Item #3 states to leave existing rolling doors; 6.0 B2030 states to provide new OVHD and Roll up doors. Which is correct?

PM RESPONSE: Item #3 which states “leave existing rolling doors” is correct. B2030 states “Provide new solid door assemblies” which is referring to any personnel doors that may exist and provides a requirement for overhead doors in the event they had not been removed from the scope.

23 HVAC

Item #2 states to install elec. Unit heaters with 109.7 MBH each; 6.0 D30 states to install elec unit heater with 570 MBU each. Which is correct and what is MBU?

PM RESPONSE: Item #2 states which “install elec. unit heaters with 109.7 MBH each” is correct. Remove the D30 HVAC requirement for “570 MBU” and replace with “109.7 MBU”.

26 Electrical Item #1 states to replace existing interior lighting and bath; 6.0 D5020 states not used, yet D50 states electrical design shall comply with criteria in UFC. Which is correct? What is to be designed that needs to comply with UFC other than mech. If no lights are replaced and all other electrical (D items) are to remain or not used?

PM RESPONSE: 26 Electrical: “Replace existing interior lighting in warehouse area and bathroom with energy efficient T8 light fixtures.” is correct.

Bldg 910 01 Gen Conditions Item b. states Storefront to stay and be protected; 6.0 B2020 states storefronts shall match existing implying they are to be replaced. Which is correct?

PM RESPONSE: “Item b. Store front to stay intact, protect from damage for the duration of the project” is correct.

09 Finishes Item a. states to paint bath walls and ceiling; 6.0 C3010 states UNO all interior wall partitions shall be painted. Are they any other walls and ceiling to be painted other than the bath walls and ceilings?

PM RESPONSE: No other walls to be painted unless replaced or damaged during demolition.

13 Special PEMB Item b. states to repair insulation behind metal panels as needed; 6.0 B2010 Vapor Retarder, Air Barrier and Insulation states to provide continuous insulation imply all insulation to be replace. Which is correct?

PM RESPONSE: “Repair insulation behind metal panels as needed where damaged and/or deteriorated…” is correct.

22 Plumbing

6.0 D2010 states to replace elec water cooler but no water cooler is included in 1.0 work description. Is there a water cooler to be replaced?

PM RESPONSE: “Replace electric water cooler” is correct.

26 Electrical Items a. and b. state to replace interior lighting in warehouse, bath, display and office areas with T8 (fluorescent) fixtures. 6.0 D5020 states to provide complete lighting system, including exit & emergency, fluorescent and HID, to include switches and automatic controls and replace all receptacles. Are we to replace just the items in 1.0 or all items in 6.0?

PM RESPONSE: Both statements are correct. Replace all items in 1.0 and 6.0.

27 Communications There is no mention of Communication in 1.0; However in 6.0 D5030 it states to see cable management policy. Is there any intent to provide any Communications not identified in 1.0?

PM RESPONSE: The cable management policy is a generic Base wide policy provided as a reference if needed. No communication work is anticipated unless wires removed or damaged in the renovation process.

Bldg 3514 26 Electrical Item 4 states to rewire Fire Alarms; 6.0 D40 states not used. Is any Fire Alarm work required?

PM RESPONSE: Both are correct. Replace fire alarm wires.

Item 5 states to replace interior lighting with T8 fixtures; 6.0 D5020 states to provide complete lighting system, including exit & emergency. Exit and Emergency are typically LED. Are Exit and Emergency lights to be replaced?

PM RESPONSE: Yes, replace all lights including existing exit and emergency lights.

NEW QUESTIONS RECEIVED 8/31/15

Bldg 65 During the site visit a shed roof side building containing an old unused boiler near the paint booth was observed. Is this structure and/or equipment part of any scope regarding this solicitation and/or the Seed Project?

PM RESPONSE: Only the single roof is to be replaced. No other work required in the shed.

Bldg 910 10 Specialty: Item b. states to provide new ADA compliant toilet grab bar, mirror, TP and paper towel dispenser. During the site visit it was noted that this toilet room is not ADA accessible. Is there any requirement to modify this toilet room so that it is ADA accessible?

PM RESPONSE: Yes, modifications will be needed as the pilaster in corner interferes with the clear space required around the toilet. To be ADA compliant the toilet will need to be moved approx. 16” further away from the outside wall and the sink will need to move approx. 30” in the same direction. A partition will also need to be constructed flush with the corner pilaster to mount the ADA grab bars.

21 Fire Suppression: During the site visit our engineer indicated that he was told that the base utilized a proprietary fire alarm system/manufacturer but that source was not identified. To ensure we provide pricing for the system required please provide name of proprietary system/manufacturer.

PM RESPONSE: Proprietary system is not required. However, compatibility with existing Monaco D-21 System is required. Reference Attached JBC FD Design Guide for more detailed information about the existing system.

Bldg 3514 07 Roofing: 6.0 B3010 states to provide new felt and ice and water shield. We assume per industry standard that the entire roof will receive felt, However, it does not specify the area to be covered with either the felt or the ice and water shield. Per industry standard ice and water shield is typically applied to the roof peak, valleys and the outer edges. There would be a significant price difference if ice and water shield were required for the entire roof surface. Where specifically is the ice and water shield to be used?

PM RESPONSE: DOR shall determine required location of ice and water shield.

08 Openings: 1.0 states to remove rust, prime and paint/caulk (11) steel windows; 6.0 B2020 states to repair existing windows and that glazing shall be clear glass; Per the drawings provided and confirmed at the site visit, these openings are not windows but rather Access Hatches without any glass and some in really rough shape. Is there any requirement for glass to be used in these openings? To what level of repair are we to bring these to especially those that are in really rough shape?

PM RESPONSE: No glass is required unless replacing existing glass. Openings shall keep water from entering building or structure. Components shall be refinished to maximize life cycle of building.