Attachment_38-_Part_2 _Attachment_A _Project-Specific_General_Requirements.pdf

PDF 151 KB Posted

Attached to
Repair Warehouses, Bldgs. 65, 910 and 3514
Solicitation number
FA4418-15-R-0027
Issued by

About this file

Attachment 38 Part 2 Attachment A Project-Specific General Requirements Dated 1 June 2015.

View the file

Other files

File Type Posted
Amendment_003.doc DOC document
Clarification_of_Q A.pdf PDF
QA_RFP06.docx DOCX document
Addendum_001.pdf PDF
15-R-0027-0001.pdf PDF
Attachment_39-_FIRE_PROTECTION_JBC_FD_Design_Guide.pdf PDF
QA_round_two.docx DOCX document
Site_Visit_Attendance.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attach_33_existing_drawings-_floor_plan.PDF PDF
Attach_22_Bldg._65_Attachments.pdf PDF
Attach_18_part_4_Bldg._65_SOW.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
WDOL.docx DOCX document
Attach_19_Part_3_Bldg._910_SOW.pdf PDF
GPDF_Form_for_WS_3514_910_65.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attach_32_Existing_Drawings-_elevation.PDF PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attach_27_Bldg._910_Existing_Drawings.PDF PDF
Attch_04_01_30_00_ADMINISTRATIVE_REQUIREMENTS.pdf PDF
Attach_26_Part_6_Bldg._910_attachments.pdf PDF
Attach_34_HAZMAT_Survey_1996.PDF PDF
Attach_23_Bldg._65_exterior_photo.jpg JPG image
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attach_29_Photographs.jpg JPG image
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attach_25_HAZMAT_Survey.PDF PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attach_31_Photographs.jpg JPG image
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
FA4418-15-R-0027.doc DOC document
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attach_28_Bldg._910_HAZMAT_Survey_1997.PDF PDF
Attach_35_NPTU_Special_Considerations.pdf PDF
Atch_21 _Part_4_Minimum_Materials_Warehouse_Repair.pdf PDF
Attach_30_Part_6_Attachments.pdf PDF
Attach_24_Bldg._65_Plan_and_Elevations.PDF PDF
Attach_20_Part_3_bldg._3514_SOW.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 38 Consolidated Projects for WS-3514, 910 & 65 DKGV 14: 2074, 2091 & 2097 Weapons Station JBC 6/1/15

Part 2, Attachment A - Page 1 of 3

Part 2, Attachment A

Project-Specific General Requirements

The following requirements are project specific and may either supplement and/or modify those requirements contained in the body of Part 2, General Requirements, for Small Projects. Paragraph numbers in Part 2 correspond to paragraph numbers used in Part 2, Attachment A.

Paragraph 3 POST AWARD KICKOFF MEETING (PAK)

TBD

Paragraph 4 DESIGN

Submit design drawings or sketches, calculations and manufacturer’s data to demonstrate compliance with contract requirements.

Provide hard & electronic copies of design submittal package to the following reviewers 1 week prior to the review meeting:

Deliverable CE CS

Design Development (35% & 65%)

Half-size Drawings or Sketches 2 1

Full Size Drawings 2 1

Specifications and Manuf. Cut Sheets 2 1

Design/Construction Schedule 2 1

Design Analysis/Calculations 2 1

CD’s / Electronic Copies 2 1

Final Designs (95 &100%)

Half-size Drawings or Sketches 3 1

Full Size Drawings 3 1

Specifications and Manuf. Cut Sheets 3 1

Design/Construction Schedule 3 1

Design Analysis/Calculations 3 1

CD’s / Electronic Copies 3 1

1. The final design submittal must be professionally signed and sealed by the DOR and forwarded to the Contracting Officer prior to the start of construction. Separated final design packages will only be considered for Government review and approval during the Post Award Kick-off Meeting

2. Construction submittals are to be Contractor-approved, except those listed below:

a. DOR Approval required for:

1) Fire Protection related submittals

2) Earthwork and Geotechnical submittals

Part 2, Attachment A - Page 2 of 3

3) All components of the roof and exterior wall.

4) All components of the interior doors, hardware, cabinets, fireproofing/firestopping, railings, paint, finish materials/colors.

5) HVAC Testing, Adjusting, and balancing.

6) Furnishings, fixtures, and equipment packages

b. Government Approval required for:

1) All Finish Material Color Samples

3. Submit the following construction submittals, approved by the DOR, to the Government for surveillance:

a. Submit fire protection related submittals pertaining to spray-applied fire proofing and fire stopping, exterior fire alarm reporting systems, interior fire alarm & detection systems, and fire suppression systems including fire pumps and standpipe systems.

b. Submit roofing submittals pertaining to materials and systems used to make up the roof system.

c. Submit HVAC Testing, Adjusting, and Balancing required submittals.

d. Submit telecommunications shop drawings for coordination with the NMCI Contractor.

e. Submit Performance Verification and Acceptance Testing required by IBC or this RFP.

f. Submit all Interim Special Inspection Reports on a bi-weekly basis until work requiring special inspections is complete. Submit all Structural Observation Reports and the Final Report of IBC Special Inspections.

g. For any pre-engineered buildings, submit shop drawings showing engineering data and complete building drawings, signed and sealed by a registered professional engineer.

Paragraph 5 FIRE PROTECTION AND LIFE SAFETY REQUIREMENTS

No additional requirements

Paragraph 6 QUALITY CONTROL

The Superintendent may not serve also as the Quality Control Manager on this project.

Special inspection, testing, approvals, certifications, observations and quality assurance plans as prescribed in Chapter 17 of the IBC are required.

Paragraph 7 SUBMITTAL PROCESSING

SUBMITTAL/BENCHMARK DURATION BENCHMARK RECEIVED STATUS

1 Quality Control Plan

2 Material Safety Data Sheets

3 Design/Construction Schedule

4 Waste Management Plan

5 Safety and Health Plan

6 Schedule of Prices

8 Record Drawings

9 Operation and Maintenance Information

10 Licenses and Permits

Part 2, Attachment A - Page 3 of 3

11 Badge Requests

12 Statement of Acknowledgement SF 1413

13 Demolition and Work Plan

14 Design Development Docs

15 Final Design Docs

16 Submittal Register

17 Waste Management Opportunity Assessment Form

18 Performance/Payment Bonds

19 Environmental Protection Plan

20 Certificates of Insurance

21 DD Form 1354

Paragraph 15 INVOICES

All invoices submitted through WAWF.

Paragraph 21 ENVIRONMENTAL CONTROLS AND PROTECTION

Attached Division 1 Specifications shall apply:

01 50 10 ENVIRONMENTAL

01 57 50 TEMPORARY ENVIRONMENTAL CONTROLS

Paragraph 22 WASTE MANAGEMENT

Attached Division 1 Specification shall apply: 01 57 20 WASTE MANAGEMENT

Paragraph 23 RECORD DRAWINGS AND OPERATION & MAINTENANCE (O&M) DATA

Attached Division 1 Specifications shall apply:

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

Paragraph 26 WORK HOURS, ACCESS AND PASSES

Attached Division 1 Specification shall apply: 01 14 00 WORK RESTRICTIONS

Paragraph 27 SECURITY REQUIREMENTS

See Part 6 Attachments

Paragraph 34 SAFETY AND OCCUPATIONAL HEALTH

Attached Division 1 Specification shall apply:

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

Sub-Paragraph f., Safety and Health Officer (SSHO) The Site Safety and Health Officer may not serve also as the Superintendent.

Sub-Paragraph h., Hot Work Obtain services from a NFPA Certified Marine Chemist for “HOT WORK” within or around flammable materials (such as fuel systems, welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, manholes, and vaults) that have the potential for flammable or explosive atmospheres.

**End of PART 2 Attachment A**

File details come from the government source that posted it. Updated .