FA4418-15-R-0027-0001

View the file

Other files

File Type Posted
Amendment_003.doc DOC document
Clarification_of_Q A.pdf PDF
QA_RFP06.docx DOCX document
Addendum_001.pdf PDF
Attachment_38-_Part_2 _Attachment_A _Project-Specific_General_Requirements.pdf PDF
Attachment_39-_FIRE_PROTECTION_JBC_FD_Design_Guide.pdf PDF
QA_round_two.docx DOCX document
Site_Visit_Attendance.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attach_33_existing_drawings-_floor_plan.PDF PDF
Attach_22_Bldg._65_Attachments.pdf PDF
Attach_18_part_4_Bldg._65_SOW.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
WDOL.docx DOCX document
Attach_19_Part_3_Bldg._910_SOW.pdf PDF
GPDF_Form_for_WS_3514_910_65.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attach_32_Existing_Drawings-_elevation.PDF PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attach_27_Bldg._910_Existing_Drawings.PDF PDF
Attch_04_01_30_00_ADMINISTRATIVE_REQUIREMENTS.pdf PDF
Attach_26_Part_6_Bldg._910_attachments.pdf PDF
Attach_34_HAZMAT_Survey_1996.PDF PDF
Attach_23_Bldg._65_exterior_photo.jpg JPG image
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attach_29_Photographs.jpg JPG image
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attach_25_HAZMAT_Survey.PDF PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attach_31_Photographs.jpg JPG image
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
FA4418-15-R-0027.doc DOC document
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attach_28_Bldg._910_HAZMAT_Survey_1997.PDF PDF
Attach_35_NPTU_Special_Considerations.pdf PDF
Atch_21 _Part_4_Minimum_Materials_Warehouse_Repair.pdf PDF
Attach_30_Part_6_Attachments.pdf PDF
Attach_24_Bldg._65_Plan_and_Elevations.PDF PDF
Attach_20_Part_3_bldg._3514_SOW.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

a.) To incorporate Attachment 38; Part 2, Attachment A Project-Specif ic General Requirements Dated 1 June 2015 to Sections C and J.

b.) To incorporate Attachment 39; Fire Protection: JBC FD Design Guide to Sections C and J c.) To incorporate question and answ ers posted to FBO.

The proposal due date remains unchanged. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-15-R-0027

X 9B. DATED (SEE ITEM 11)

06-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2015

CODE

628 CONTRACTING SQUADRON

101 E HILL BLVD, B503

JOINT BASE CHARLESTON SC 29404 5021

FA4418 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4418-15-R-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C- LIST OF ATTACHMENTS

Attachments- Table of Contents

ATTACHMENTS DESCRIPTION DATE PAGES

1 Table of Contents, Repair Warehouses Bldg. 65, 910 and 3514. 21 Jul 15 1

Part 2, Division 01: Minor Construction Design-Build

2 01 11 00 Summary of Work Jun 15 3 3 01 14 00 Work Restrictions Jun 15 3

4 01 30 00 Administrative Requirements Jun 15 5

01 32 16 00 20 Project Schedule and Progress Documentation

Nov 09 9

6 01 33 00 Submittal Procedures May 11 13 7 01 33 16 Design After Award Jun 15 9

8 01 35 26 Governmental Safety Requirements Jun 15 18

9 01 42 00 Sources for Reference Publications Aug 10 40

10 01 45 00 Quality Control for Minor Construction Jun 15 10

11 01 50 00 Temporary Construction Facilities and Controls Aug 09 9

12 01 50 10 Environmental Apr 15 14 13 01 54 00 Green Procurement Jul 14 5 14 01 57 20 Waste Management Jul 14 6

15 01 57 50 Temporary Environmental Controls Jul 14 19

16 01 78 00 Closeout Submittals Aug 11 11

17 01 78 23 Operation & Maintenance Data Jul 06 10

18 Part 3, SOW/Project Program, Bldg.

65 DKGV 14-2097 1 Jun 15 6

19 Part 3, SOW/Project Program, Bldg.

910 DKGV- 14-2091 1 Jun 15 6

20 Part 3, SOW/Project Program, Bldg. 1 June 15 6

3514: DKGV 14-2074

21 Part 4, Minimum Materials, Engineering & Construction Req. 25 Jun 15 43

22 Part 6, Attachments Table of Contents:

Bldg. 65 N/A 1

23 Part 6, Bldg. 65 Exterior Photo N/A 1 24 Part 6, Bldg. 65 Plans and Elevations 28 Jul 88 1 25 Part 6, Bldg. 65 HAZMAT Survey 12 May 97 6

26 Part 6, Attachments Table of Contents:

Bldg. 910 N/A 1

27 Part 6, Bldg. 910 Existing Drawings 11 Nov 77 1 28 Part 6, Bldg. 910 HAZMAT Survey 6 June 97 7 29 Part 6, Bldg. 910 Photographs N/A 1

30 Part 6, Attachments Table of Contents:

Bldg. 3514 N/A 1

31 Part 6, Bldg. 3514 Photographs N/A 1 32 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 33 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 34 Part 6, Bldg. 3514 HAZMAT Survey 2 Oct 96 4

35 Part 6, Bldg. 3514 NPTU Special Conditions Feb 10 13

36 Green Procurement Determination Form

06 Jul 15 2

38 Part 2, Attachment A: Project-Specific General Requirements

1 June 15 3

39 Fire Protection: JBC FD Design Guide No date 17

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

Attachments- Table of Contents

ATTACHMENTS DESCRIPTION DATE PAGES

1 Table of Contents, Repair Warehouses Bldg. 65, 910 and 3514. 21 Jul 15 1

Part 2, Division 01: Minor Construction Design-Build

2 01 11 00 Summary of Work Jun 15 3 3 01 14 00 Work Restrictions Jun 15 3

4 01 30 00 Administrative Requirements Jun 15 5

5 01 32 16 00 20 Project Schedule Nov 09 9 and Progress Documentation

6 01 33 00 Submittal Procedures May 11 13 7 01 33 16 Design After Award Jun 15 9

8 01 35 26 Governmental Safety Requirements Jun 15 18

9 01 42 00 Sources for Reference Publications Aug 10 40

10 01 45 00 Quality Control for Minor Construction Jun 15 10

11 01 50 00 Temporary Construction Facilities and Controls Aug 09 9

12 01 50 10 Environmental Apr 15 14 13 01 54 00 Green Procurement Jul 14 5 14 01 57 20 Waste Management Jul 14 6

15 01 57 50 Temporary Environmental Controls Jul 14 19

16 01 78 00 Closeout Submittals Aug 11 11

17 01 78 23 Operation & Maintenance Data Jul 06 10

18 Part 3, SOW/Project Program, Bldg.

65 DKGV 14-2097 1 Jun 15 6

19 Part 3, SOW/Project Program, Bldg.

910 DKGV- 14-2091 1 Jun 15 6

20 Part 3, SOW/Project Program, Bldg.

3514: DKGV 14-2074 1 June 15 6

21 Part 4, Minimum Materials, Engineering & Construction Req. 25 Jun 15 43

22 Part 6, Attachments Table of Contents:

Bldg. 65 N/A 1

23 Part 6, Bldg. 65 Exterior Photo N/A 1 24 Part 6, Bldg. 65 Plans and Elevations 28 Jul 88 1 25 Part 6, Bldg. 65 HAZMAT Survey 12 May 97 6

26 Part 6, Attachments Table of Contents:

Bldg. 910 N/A 1

27 Part 6, Bldg. 910 Existing Drawings 11 Nov 77 1 28 Part 6, Bldg. 910 HAZMAT Survey 6 June 97 7 29 Part 6, Bldg. 910 Photographs N/A 1

30 Part 6, Attachments Table of Contents:

Bldg. 3514 N/A 1

31 Part 6, Bldg. 3514 Photographs N/A 1 32 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 33 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 34 Part 6, Bldg. 3514 HAZMAT Survey 2 Oct 96 4 35 Part 6, Bldg. 3514 NPTU Special Feb 10 13

Conditions

36 Green Procurement Determination Form

06 Jul 15 2

37 Wage Determination (Berkeley County)

22 May 15 5

38 Part 2, Attachment A: Project-Specific General Requirements

1 June 15 3

39 Fire Protection: JBC FD Design Guide No date 17

(End of Summary of Changes)