AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
a.) To incorporate Attachment 38; Part 2, Attachment A Project-Specif ic General Requirements Dated 1 June 2015 to Sections C and J.
b.) To incorporate Attachment 39; Fire Protection: JBC FD Design Guide to Sections C and J c.) To incorporate question and answ ers posted to FBO.
The proposal due date remains unchanged. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-15-R-0027
X 9B. DATED (SEE ITEM 11)
06-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2015
CODE
628 CONTRACTING SQUADRON
101 E HILL BLVD, B503
JOINT BASE CHARLESTON SC 29404 5021
FA4418 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4418-15-R-0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION C- LIST OF ATTACHMENTS
Attachments- Table of Contents
ATTACHMENTS DESCRIPTION DATE PAGES
1 Table of Contents, Repair Warehouses Bldg. 65, 910 and 3514. 21 Jul 15 1
Part 2, Division 01: Minor Construction Design-Build
2 01 11 00 Summary of Work Jun 15 3 3 01 14 00 Work Restrictions Jun 15 3
4 01 30 00 Administrative Requirements Jun 15 5
01 32 16 00 20 Project Schedule and Progress Documentation
Nov 09 9
6 01 33 00 Submittal Procedures May 11 13 7 01 33 16 Design After Award Jun 15 9
8 01 35 26 Governmental Safety Requirements Jun 15 18
9 01 42 00 Sources for Reference Publications Aug 10 40
10 01 45 00 Quality Control for Minor Construction Jun 15 10
11 01 50 00 Temporary Construction Facilities and Controls Aug 09 9
12 01 50 10 Environmental Apr 15 14 13 01 54 00 Green Procurement Jul 14 5 14 01 57 20 Waste Management Jul 14 6
15 01 57 50 Temporary Environmental Controls Jul 14 19
16 01 78 00 Closeout Submittals Aug 11 11
17 01 78 23 Operation & Maintenance Data Jul 06 10
18 Part 3, SOW/Project Program, Bldg.
65 DKGV 14-2097 1 Jun 15 6
19 Part 3, SOW/Project Program, Bldg.
910 DKGV- 14-2091 1 Jun 15 6
20 Part 3, SOW/Project Program, Bldg. 1 June 15 6
3514: DKGV 14-2074
21 Part 4, Minimum Materials, Engineering & Construction Req. 25 Jun 15 43
22 Part 6, Attachments Table of Contents:
Bldg. 65 N/A 1
23 Part 6, Bldg. 65 Exterior Photo N/A 1 24 Part 6, Bldg. 65 Plans and Elevations 28 Jul 88 1 25 Part 6, Bldg. 65 HAZMAT Survey 12 May 97 6
26 Part 6, Attachments Table of Contents:
Bldg. 910 N/A 1
27 Part 6, Bldg. 910 Existing Drawings 11 Nov 77 1 28 Part 6, Bldg. 910 HAZMAT Survey 6 June 97 7 29 Part 6, Bldg. 910 Photographs N/A 1
30 Part 6, Attachments Table of Contents:
Bldg. 3514 N/A 1
31 Part 6, Bldg. 3514 Photographs N/A 1 32 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 33 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 34 Part 6, Bldg. 3514 HAZMAT Survey 2 Oct 96 4
35 Part 6, Bldg. 3514 NPTU Special Conditions Feb 10 13
36 Green Procurement Determination Form
06 Jul 15 2
38 Part 2, Attachment A: Project-Specific General Requirements
1 June 15 3
39 Fire Protection: JBC FD Design Guide No date 17
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
Attachments- Table of Contents
ATTACHMENTS DESCRIPTION DATE PAGES
1 Table of Contents, Repair Warehouses Bldg. 65, 910 and 3514. 21 Jul 15 1
Part 2, Division 01: Minor Construction Design-Build
2 01 11 00 Summary of Work Jun 15 3 3 01 14 00 Work Restrictions Jun 15 3
4 01 30 00 Administrative Requirements Jun 15 5
5 01 32 16 00 20 Project Schedule Nov 09 9 and Progress Documentation
6 01 33 00 Submittal Procedures May 11 13 7 01 33 16 Design After Award Jun 15 9
8 01 35 26 Governmental Safety Requirements Jun 15 18
9 01 42 00 Sources for Reference Publications Aug 10 40
10 01 45 00 Quality Control for Minor Construction Jun 15 10
11 01 50 00 Temporary Construction Facilities and Controls Aug 09 9
12 01 50 10 Environmental Apr 15 14 13 01 54 00 Green Procurement Jul 14 5 14 01 57 20 Waste Management Jul 14 6
15 01 57 50 Temporary Environmental Controls Jul 14 19
16 01 78 00 Closeout Submittals Aug 11 11
17 01 78 23 Operation & Maintenance Data Jul 06 10
18 Part 3, SOW/Project Program, Bldg.
65 DKGV 14-2097 1 Jun 15 6
19 Part 3, SOW/Project Program, Bldg.
910 DKGV- 14-2091 1 Jun 15 6
20 Part 3, SOW/Project Program, Bldg.
3514: DKGV 14-2074 1 June 15 6
21 Part 4, Minimum Materials, Engineering & Construction Req. 25 Jun 15 43
22 Part 6, Attachments Table of Contents:
Bldg. 65 N/A 1
23 Part 6, Bldg. 65 Exterior Photo N/A 1 24 Part 6, Bldg. 65 Plans and Elevations 28 Jul 88 1 25 Part 6, Bldg. 65 HAZMAT Survey 12 May 97 6
26 Part 6, Attachments Table of Contents:
Bldg. 910 N/A 1
27 Part 6, Bldg. 910 Existing Drawings 11 Nov 77 1 28 Part 6, Bldg. 910 HAZMAT Survey 6 June 97 7 29 Part 6, Bldg. 910 Photographs N/A 1
30 Part 6, Attachments Table of Contents:
Bldg. 3514 N/A 1
31 Part 6, Bldg. 3514 Photographs N/A 1 32 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 33 Part 6, Bldg. 3514 Existing Drawings 3 March 97 1 34 Part 6, Bldg. 3514 HAZMAT Survey 2 Oct 96 4 35 Part 6, Bldg. 3514 NPTU Special Feb 10 13
Conditions
36 Green Procurement Determination Form
06 Jul 15 2
37 Wage Determination (Berkeley County)
22 May 15 5
38 Part 2, Attachment A: Project-Specific General Requirements
1 June 15 3
39 Fire Protection: JBC FD Design Guide No date 17
(End of Summary of Changes)
File details come from the government source that posted it. Updated .