Attach_35_NPTU_Special_Considerations.pdf

PDF 588 KB Posted

Attached to
Repair Warehouses, Bldgs. 65, 910 and 3514
Solicitation number
FA4418-15-R-0027
Issued by

About this file

NPTU Special Considerations

View the file

Other files

File Type Posted
Amendment_003.doc DOC document
Clarification_of_Q A.pdf PDF
QA_RFP06.docx DOCX document
Addendum_001.pdf PDF
15-R-0027-0001.pdf PDF
Attachment_38-_Part_2 _Attachment_A _Project-Specific_General_Requirements.pdf PDF
Attachment_39-_FIRE_PROTECTION_JBC_FD_Design_Guide.pdf PDF
QA_round_two.docx DOCX document
Site_Visit_Attendance.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attach_33_existing_drawings-_floor_plan.PDF PDF
Attach_22_Bldg._65_Attachments.pdf PDF
Attach_18_part_4_Bldg._65_SOW.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
WDOL.docx DOCX document
Attach_19_Part_3_Bldg._910_SOW.pdf PDF
GPDF_Form_for_WS_3514_910_65.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attach_32_Existing_Drawings-_elevation.PDF PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attach_27_Bldg._910_Existing_Drawings.PDF PDF
Attch_04_01_30_00_ADMINISTRATIVE_REQUIREMENTS.pdf PDF
Attach_26_Part_6_Bldg._910_attachments.pdf PDF
Attach_34_HAZMAT_Survey_1996.PDF PDF
Attach_23_Bldg._65_exterior_photo.jpg JPG image
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attach_29_Photographs.jpg JPG image
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attach_25_HAZMAT_Survey.PDF PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attach_31_Photographs.jpg JPG image
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
FA4418-15-R-0027.doc DOC document
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attach_28_Bldg._910_HAZMAT_Survey_1997.PDF PDF
Atch_21 _Part_4_Minimum_Materials_Warehouse_Repair.pdf PDF
Attach_30_Part_6_Attachments.pdf PDF
Attach_24_Bldg._65_Plan_and_Elevations.PDF PDF
Attach_20_Part_3_bldg._3514_SOW.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NUCLEAR POWER TRAINING UNIT (NPTU)

Charleston, SC

GENERAL CONTRACTOR SPECIAL CONDITIONS

(Please read this document in its entirety. For questions, please call the NPTU Operations Officer at: 843-863-5582)

A. WQRKSITE

The site of the work is Nuclear Power Training Unit (NPTU). Charleston, located in Goose Creek, South carolina. Facilities at NPTU include several buildings, as well as two nuclear powered moored training ships (MTS) and multiple service barges.

B. WORKING HOURS

Normal working hours at NPTU are 7:30am to 5:00pm, Monday through Friday, exclusive of the holidays listed below. If necessary, work under this contract may be performed outside normal working hours, but must be coordinated with NPTU at least 24 hours in advance.

NPTU-Qb8erved Holidays:

New Years Day Martin Luther King, Jr. Day President's Day Memorial Day Independence Day Labor Day

C. SITE ACCEU AND SECURITY

Columbus Day Veterans Day Thanksgiving Day Day after Thanksgiving Christmas Eve Christmas Day

NPTU is a secure facility and, as such, has its own security force and access requirements in addition to WPNSTA Charleston. Delays due to non-compliance with NPTU's personnel and vehicle access requirements shall be the responsibility of the Contractor.

In order to be placed on NPTU's authorized access list, all Contractor personnel requiring access to NPTU must submit a visit request at least five working days prior to arriving at NPTU. The visit request may be faxed to the NPTU Administrations Department at (843) 863-5994. The request must be on company letterhead, be signed by a supervisor, and include the following information for each individual requiring access:

1. Full Name

2. Social Security Number

3. Date and Place of Birth

4. Company Name and Location

5. Reason for Visit

6. Dates and Length of Visit

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

1 FEBRUARY 2010

Enclosure (1)

7. Type of Clearance (if any)

8. Citizenship Status

9. NPTU Point of Contact

The Contractor's main personnel entrance and exit will be via the quarterdeck, or main entrance, of the Training Support Building (TSB). Prior to entry each day, visitor and Contractor personnel must present an acceptable form of identification. Approved forms of identification include state or government issued identification cards containing a picture (such as a driver's license, military ID, or DOE standard badge). This identification card will be exchanged at the quarterdeck for a NPTU access badge, which must remain readily visible on the upper torso at all times when within the NPTU perimeter. The use of a NPTU access badge by anyone other than the intended user is strictly prohibited.

Most Contractor personnel will be issued an "E" badge, indicating that a NPTU escort is required. The personnel being escorted are required to remain in the escort's line of sight at all times. The escort will typically be provided by Deck Division, and problems obtaining an escort may be reported to the Deck Division Officer at (843) 764-2060. The Contractor's identification cards will be returned when the access badge is surrendered prior to leaving

NPTU.

Required Basic Indoctrination Process Before Entering Site

An indoctrination session lasting approximately 30 to 45 minutes will be required for all Contractor personnel performing work under contract at NPTU. This session consists of training and video presentations to familiarize personnel with NPTU emergency signals, basic radiological control and security information, and safety compliance requirements.

Each individual receiving the indoctrination shall acknowledge participation by individually signing an attendance log maintained by NPTU and will be issued a card to serve as proof of indoctrination. The indoctrination shall be valid for a period of one year.

The NPTU smoking policy is summarized as follows:

1. Smoking is not permitted in any NPTU buildings, barges, or on-site trailers, whether owned by NPTU or the Contractor.

2. Smoking is permitted only in designated outdoor smoking areas.

Vehicle Access Requirements:

Parking is available in the westernmost parking lot from the Training Support Building.

Arrangements for vehicular access to the site or temporary parking for loading or unloading equipment or supplies may be arranged through the Deck Division Officer by calling (843) 764-2060. Vehicles or other large equipment and materials will enter and exit via NPTU's southwest security gate.

Vehicles entering or leaving the NPTU fenced perimeter are subject to inspection for the prohibited items listed in section D below, as well as to prevent loss of NPTU property, to ensure proper material movement documentation, and to limit the transport of hazmat, leaking gasoline, diesel, oil, anti-freeze or any other hazardous or potentially hazardous fluids.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

2 FEBRUARY 2010

D. PROHIIIJED ARTICLES AND CONTRABAND MATERIAL

Prohibited Articles: The following items are prohibited anywhere on NPTU property, which includes the parking lot:

a. Explosives and incendiaries

b. Firearms, ammunition, and other dangerous weapons

c. Illegal drugs

d. Any other item which is considered illegal or in violation of federal, state, or local law

Contraband Material: Personal Electronic Devices (PEDs) are prohibited inside of NPTU's security enclosure. PEDs include all forms of the following:

a. Cell phones

b. Personal Digital Assistants

c. Digital Photo Frames

d. iPods and MP3 players

e. Pagers

f. Pocket/Handheld PCs

g. Advanced Programmable Calculators

h. Flash Media

i. Jump Drives

j. Shirt-pocket sized computing devices.

The following items are prohibited at NPTU unless prior authorization is granted:

a. Cameras and film (unless accompanied by a camera pass)

b. Alcoholic beverages

c. Personal HAZMAT items (bug spray, lotion, or pressurized containers)

d. Radioactive materials not included in NPTU's Radioactive Materials Accounting System

e. Classified material (excluding NOFORN material, and unless in possession of a courier card for classified material)

f. Radio transmitters and receivers

g. Personnel monitoring devices (unless issued by NPTU)

h. Optical and magnetic media (COs, DVDs, floppy disks, digital tape, etc.)

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

3 FEBRUARY 2010

i. Any other item which is considered illegal or in violation of federal, state, or local law

All vehicles and hand-carried items are subject to inspection prior to site entry.

E. REQUIREMENTS FOR SUCCESSFUL COMPLETION OF WORK AT NPTU

NPTU is a nuclear facility with a fast operation tempo and high standard of excellence for the execution of work. Although NPTU abides by and enforces the same federally mandated General Industry standards that apply to government and private sector work, these standards are strictly enforced by NPTU. Furthermore, these federally mandated General Industry standards are implemented through unique work controls that both keep personnel safe and meet the needs of this site. The following processes and requirements muat be complied with, without exception, in order to ensure the successful completion of work at NPTU.

h CONDUCT FORMAL PRE-EXECUTION MEETING

All Contractor quality control and safety supervisors with intent to supervise work at NPTU will attend a formal pre-execution meeting at NPTU with FEAD representatives and NPTU Operations Department management.

The meeting shall consist of:

1. An in-depth discussion and dissection of the contractor's NPTU specific risk hazard assessment and mitigation strategy, taking into account all requirements described in section (E) of this document.

2. A discussion of lessons learned with other contractors.

3. A walkthrough of the work-site.

4. A review of the NPTU Specific Contractor Specifications.

5. A discussion that a violation of any approved safety plan will likely result in a formal Letter of Concern issued by the FEAD, as described in section (E) of this document.

6. A discussion of the expectation that the Contractor's executive, line supervisors and production personnel understand the NPTU safety and performance standards.

To successfully complete this meeting, Contractors must:

1. Provide a Plan of Action document that both includes a detailed procedure for the work about to be conducted and outlines expected dates and/or times for the following:

a. Performance of procedure steps.

b. Interruption of services (as governed by section E.ll.9).

c. Use of energy isolations (as governed by section E.ll.7).

d. Required NPTU support (as governed by section E.ll.6).

e. Mitigation of safety hazards (as governed by section E. Ill).

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

4 FEBRUARY 2010

Enclosure {1)

II. MEET SCHEDULING REQUIREMENTS

1. The Contractor shall notify NPTU a minimum of 5 working days in advance of initiating on-site work. All work shall be coordinated and accomplished in an expeditions manner.

2. At a minimum of 2 working days prior to commencing work, the Contractor will be required to meet with the NPTU Work Control Officer (WCO). This meeting is to ensure that NPTU fully understands the scope of intended work, the work is properly scheduled in the Site's formal Plan of the Day, and that all de-conflictions are properly made on behalf of the Contractor, therefore allowing work to occur.

3. Prior to commencing work, the Contractor will meet with the WCO and together they will verify that the contractor and NPTU have completed all preparatory documentation and that the work is planned properly. The WCO will then authorize the work via an Operations Department Work Authorization Form (ODWAF).

4. Before work is initiated each day, the contractor shall inform the WCO or other designated NPTU representative as to which Contractor personnel are on site and what work is planned for the day. Therefore, before commencing work each day, whether inside or outside of the perimeter fence, all Contractor personnel (including sub-contractor personnel) shall report to the NPTU WCO. Exceptions to this requirement will only be permitted if the day's work was specifically reviewed by the WCO the day before. In these cases, the Contractor shall report daily to the NPTU WCO at a convenient time and prior to beginning any new work that was not specifically reviewed on the prior day. However, if the work is defined as High Risk per section E. Ill, the Contractor must meet with the NPTU WCO or his alternate each day prior to the commencement of work.

5. NPTU SUPPORT: Any evolution deemed to require support from NPTU will have a minimum 2 working day notification prior to its initiation. This requirement may be longer pending on the complexity of the request. It is vital for the Contractor to identify all evolutions requiring NPTU support during the Pre-Execution Meeting.

6. ENERGY ISOLATIONS: Any and all evolutions requiring the use of energy isolation shall have a minimum 2 working day notification and commencement of their approval process prior to their initiation. This requirement may be longer pending on the complexity of the request. It is vital for the Contractor to identify all evolutions requiring energy isolations during the Pre-Execution Meeting. Additionally all Energy Isolations must be approved by the WCO prior to the commencement of work.

Requirements for Energy Isolation vary depending on system and location at NPTU.

7. EQUIPMENT: The Contractor will be permitted to operate equipment at the NPTU site only when the equipment has been isolated such that its operation can not in any way impact the facility, system or NPTU employees and the system has been turned over to the vendor for repair, maintenance, or reconstruction. Should situations occur where such isolation can not occur then the following will apply:

a. The Contractor will verify that operation of the equipment will have no impact on the site's operation or that the impact is acceptable with the respective NPTU area manager.

b. The equipment will be operated for the Contractor by a qualified NPTU employee or the Contractor will be permitted to operate the equipment under the direct observation of a qualified NPTU em~loyM.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

5 FEBRUARY 2010

8. HIGH RISK WORK: Any evolution deemed to invoke High Risk Work Controls, as defined in section E. Ill, must have a High Risk Work Plan approved through NPTU prior to commencement of work. Besides the daily requirement to meet with the WCO or his alternate prior to commencement of work each day where High Risk Work will occur, the Contractor's High Risk Work Plan, once approved, must be submitted at a minimum 5 working days before work is allowed to occur.

9. INTERRUPTION OF SERVICES: The Contractor shall notify NPTU and obtain approval from the NPTU Operations Officer a minimum of 2 working days prior to the disconnection or interruption of any mechanical, electrical or plumbing services.

NPTU will disconnect services where required. Connections to existing services shall be accomplished in the shortest possible time with no unnecessary delays. Upon completion of work, any service, utility, or item of equipment so disconnected or interrupted shall be restored to its original operating conditions unless the statement of work called for to be eliminated.

Fire Protection System Outage:

a. Work shall be planned, scheduled, and performed in such a manner that the NPTU fire protection system is completely operational during construction, except for scheduled outages during the work day, including provisions for the temporary restoration of the system to service at the end of each work day during installation, unless otherwise specified.

b. The Contractor shall notify NPTU 48 hours prior to the deactivation of any fire protection system. The Contractor shall perform all work possible before deactivating the system. When ready to deactivate the system, the Contractor shall notify the WCO to obtain the necessary services for deactivating the system.

10. HOT WORK: Any work requiring welding, cutting, or brazing not defined as High Risk Work requires WCO approval prior to commencement of work.

Ill. MEET SAFETY REQUIREMENTS

1. As part of the Contractor's hazard analysis and safety plan the Contractor shall submit a safety surveillance schedule to be completed by Contractor supervisors for the duration of work at NPTU.

2. NPTU's Environmental, Safety, and Health (ESH} Department shall brief contractors needing to utilize Navy tagouts or OSHA lockouts. The brief shall address:

a. Appearance of danger and caution tags.

b. Equivalence of Navy tagouts and OSHA lockouts.

c. Need for NPTU and contractors to hang their own respective tags and locks.

d. Requirements for working on a tagged-out system.

3. In addition to OSHA and EM-385 requirements all Contractors must work in accordance with the NPTU High Risk program, when applicable.

High Risk Work is defined as work that presents a significant risk of causing personal injury or a fatality if performed improperly. It is standard operating procedure to avoid High Risk Work. Task completion is not to be accomplished at the risk of personnel safety. With any

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

6 FEBRUARY 2010

Enclosure {1)

A given task it is not acceptable to perform High Risk Work for convenience or ease of work.

In situations in which the only way to perform work is' to perform High Risk Work, the risk will be evaluated and mitigated utilizing a formal process.

The following are items deemed High Risk Work by NPTU local instruction:

a. Work on energized electrical equipment greater than 50 volts.

1. This is specific to energized systems that have unguarded conductors.

2. This does not apply to qualified electricians obtaining voltage measurements utilizing test jacks and equipment designed for that purpose.

3. If accurate system drawings do not exist, all voltage measurements will be completed as high risk work.

WARNING!

Three phase power distribution panels in the TSB contain Edison Circuits (multi-wire branch circuits). Un-valldated circuits sharing a common neutral require laolatton of the entire panel in order to Isolate a single piece of A equipment; otherwise the work Is considered High Risk Work. NPTU Operations' Deck Division Operating Procedure Alpha (DDOP-A) lists the appropriate validation procedure.

WARNING I

b. Elevated work, defined as work on a surface greater than or equal to 6 feet above the next lower working surface when a fall hazard exists. Items that do not fall under high risk work controls with regards to elevated work are as follows:

1. Work on roofs or other elevated surfaces where OSHA-approved physical barriers or administrative controls prevent fall hazard.

2. Work from ladders, unless the ladder raises the worker above a physical barrier .used to mitigate a fall hazard or the worker must extend laterally such that the middle of their body will extend beyond the ladder rails.

3. Work from aerial lifts, provided the worker maintains both feet on the working platform and wears a personal fall arrest system.

4. Work from a mobile scaffold, provided the worker maintains both feet on the platform floor.

5. Work on standard scaffolding, provided the scaffolding is erected per manufacturer's instructions and meets guardrail requirements.

Additionally the worker must maintain both feet on the platform.

6. Work conducted over water where it is highly unlikely that a solid surface will be struck in the event of a fall into that body of water.

7. Inspection, investigation, or assessment of workplace conditions if not associated with ongoing work, as excluded under the 29 CFR 1926.500

(a) scope and application section of the Subpart M Fall Protection regulation.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

7 FEBRUARY 2010

c. Building demolition and renovation.

This will include any remodeling that would include the removal of walls, ceilings, or floors that include a load-bearing wall.

d. Complex welding and burning operations.

This will include welding, burning, cutting, grinding, or brazing operations when work is conducted in areas other than approved "Hot Work Areas" and at least one of the following statements is true:

1. Personal Protective Equipment, such as Anti-C clothing, Tyvek coveralls, or similar materials, are worn, or

2. Respiratory protection is worn that obscures the worker's vision, or

3. The worker's escape route is hampered such that timely escape is not possible.

e. Lifting and handling operations, when the lift is "complex" and not performed by an organization that has fully implemented NAVFAC P-307, Management of Weight Handling Equipment, or NAVSEA 989-030-7000, lifting Standard. A "complex" lift is defined as a lift that involves one or more of the following:

1. Highly hazardous materials.

2. Lifting of materials that, if uncontrollably released, would pose serious safety and health, environmental, or property damage consequences, i.e.

extremely flammable or toxic materials.

3. Larger and complex geometric shapes.

4. Lifts of personnel.

5. Lifts exceeding 80% of the certified capacity of the crane's hoist, except during load testing.

6. Multiple cranes or multiple hook lifts on the same load.

7. Lifts involving non-routine operations, difficult operations, sensitive equipment, or unusual safety risks, e.g. lifts in the vicinity of overhead transmission lines and over occupied buildings where a load drop endangers the safety of those occupants.

f. Work on high energy systems, as defined by the following:

1. Where an unexpected energization, start up, or energy release could cause injury.

2. When the system cannot be deenergized due to stored or potential energy that cannot be dissipated or neutralized.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

8 FEBRUARY 2010

3. When the system cannot be locked or tagged out using standard lockout and tagout procedures.

g. Excavations.

Work that includes digging with power equipment to a depth greater than 8 inches or that might contact underground utilities or when an employee must enter an excavation 5 feet or more in depth.

h. Confined Space Entry.

Work where an employee must enter a Permit-Required Confined Space.

i. Diving Operations.

All diving operations except when performed for search, rescue, or related public safety purposes, or when performed by Department of Navy Divers.

j. Blasting.

Utilization of explosives for demolition or excavation.

k. Lasers, non-ionizing radiation.

Use of Class 3b or 4 lasers when not governed by documented and approved standard operating procedures, or where increased risk for eye or skin contact exists, or when modifications of the laser's design have been made for work.

I. Use of temporary building structural support systems or critical building erection event.

Use of bracing during construction, i.e. "tilt-up construction."

m. Potentially immediate dangerous to life and health atmospheres.

Work that may activate chemical deluge systems.

The contractor must perform hazard analysis and risk mitigation on any item deemed high risk prior to the commencement of work. The hazard analysis and risk mitigation will be performed utilizing a high risk supplemental safety plan and daily pre-work meetings for all personnel involved. Pre-work meetings will also be held as work conditions change or the scope of work has been altered in any way. At a minimum, the high risk supplemental safety plan will include the following:

a. Work Scope: A description of the work to be performed, including specific work elements and the sequence of work.

b. Hazard Assessment and Mitigation Strategy. A work assessment shall be conducted and the hazards identified. All hazards identified and the mitigating actions shall be specified in the work document. Mitigation strategy will be performed utilizing the following hierarchy.

1. Eliminate the hazard where feasible and appropriate.

2. Utilize engineering controls where feasible and appropriate.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

9 FEBRUARY 2010

3. Apply administrative controls that limit workers exposures.

4. Use Personal Protective Equipment (PPE).

c. Unique Worker Knowledge and Skills. Required worker competency to perform high risk work shall be specified.

d. Rescue or Medical Notification Provisions. The means to rescue an individual in case of emergency or the means to notify emergency or medical responders shall be included.

e. Stop Work Conditions. Predetermined conditions that warrant stopping work to assess the adequacy of the work document.

f. Certification of Review. The contractor shall submit the High Risk technical work document to NPTU, for review and approval, 10 days prior to commencing the High Risk work.

g. Engineering Calculations. When required to verify structural component and system strength requirements, all relevant supporting engineering documentation shall be readily available.

h. Work Permit and Plan. For high risk work evolutions that require a work permit and plan, the associated permit and plan shall be included in the work document and verified complete by a certification signature. Examples of these evolutions would include, but are not limited to: electrical work, confined space entry, and welding or burning operations.

IV. MEET RAQIOLOGICAL REQUIREMENTS

NPTU is a Navy training facility, a portion of which involves the use and management of radioactive material. As a result, certain special requirements are associated with working in such an environment.

The Contractor shall not use any radioactive sources or X-ray generating equipment at NPTU unless specifically approved by NPTU Radiological Controls.

The Contractor shall not use the colors yellow or magenta (purple) to color code or identify its tools since yellow and magenta are normally used at NPTU to color code tools for radiological reasons. Also, yellow-colored plastic and yellow tarps are prohibited. Any deviations, such as Contractor-supplied yellow or magenta stock, must be approved by NPTU Radiological Controls.

NPTU will provide an indoctrination on radiological warning signs as discussed in Section E above. Any questions regarding radiological controls should be addressed to NPTU Radiological Controls Department.

V. MAINTAIN CONTROL OF MATERIALS

1. Absolutely no materials shall be used on-site that contain asbestos without prior NPTU approval.

2. Disposal of any materials containing asbestos, PCBs, RCRA, etc. must be coordinated with and approved by NPTU Environmental, Safety, and Health.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

10 FEBRUARY 2010

VI. MEET ENVIRONMENTAL REQUIREMENTS

Performance of all work at the NPTU Site shall be in strict compliance with federal, state, and local environmental control regulations. Significant environmental control requirements are highlighted in this section for information; however, this emphasis does not exempt the Contractor from adherence to all environmental regulations.

The Contractor shall submit for approval a list of all liquids {cutting oils, fluids, acids, bases, cleaning solvents and solutions, thinners, etc.), gases and aerosols, and easily divisible solid chemicals that the Contractor will use on-site in performance of this contract. The maximum amount of each liquid, gas, aerosol, and easily divisible solid chemical that will be on-site on any given day, the estimated total amount of each product that will be consumed, and the container size of each product shall be specified. Listed materials shall not be brought on-site until they are approved. A Material Safety Data Sheet {MSDS) shall be provided for information for each substance on the list.

The Contractor shall submit for approval a list of all wastes {solid, liquid, gaseous or mixture thereof) that will be generated during the contract, including all of the wastes that will be generated from using the substances listed above. Under no circumstances shall a waste be generated until the waste is approved by NPTU.

The Contractor is responsible to avoid the discharge {spill, release, etc.) of hazardous materials and hazardous wastes to the environment. NPTU shall be notified immediately of any inadvertent discharge of hazardous material or hazardous waste to the environment.

The Contractor shall be responsible, at no cost to NPTU, for all necessary cleanup and disposal of discharges. In the event that NPTU elects to conduct the cleanup, NPTU reserves the right to charge the Contractor the reasonable cost for cleanup and disposal of materials.

VII. UNDERSTAND FAILURE TO COMPLY/ CRITIQUE MEETINGS

In the event that any Contractor personnel are involved in a violation of a technical specification, or any safety, security, environmental, or radiological requirements, NPTU reserves the right to stop work and wait for NAVFAC support to resolve issue at no additional cost to NPTU. Violation of any approved safety plan will likely result in a formal Letter of Concern issued by the NAVFAC office. In the event of a violation for which NPTU determines a critique meeting will be held the Contractor's supervisor and all involved personnel may be required to attend the critique meeting and implement reasonable corrective action(s}. Typically, the Contractor will be required to suspend work until the critique meeting is convened and the corrective actions are complete. Suspending work, attending the critique meeting, and implementing corrective actions will be completed by the Contractor at no additional cost to NPTU.

F. SPECIFICATIONS AND CONTRACT DRAWINGS

The Contractor shall keep a copy of the latest revision of the contract drawings and specifications at the work site. Anything mentioned in the specifications and not shown on the drawings, or shown on the contract drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, t~e matter shall be promptly submitted to NPTU. When practical, NPTU shall make a determination in writing within 24 hours. Any adjustment by the Contractor without such a determination shall be at the Contractors own risk and expense.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

11 FEBRUARY 2010

G. AS-BUlL T RECORDS

Upon completion of the contract work, the Contractor shall furnish NPTU at least one complete set of contract drawing prints revised to reflect "as-built" conditions. All changes from the contract drawings are to be so noted.

Each print shall be signed by the Contractor to certify it accurately represents the completed work. The Contractor shall maintain as-built records (prints) onsite and available for NPTU inspection on a daily basis

H. TEMPORARY SERVICES

In most circumstances, NPTU is able to provide a connection point for temporary electricity, water, sewer and low pressure compressed air. The contractor must submit a request to utilize these temporary services. This request should include the size and type of fittings, the length of cables or hoses, and, for electrical connections, the voltage and current required. Normal temporary power furnished by N PTU is limited to 1 00 amps at 480 volts AC. Depending on the size and complexity of the construction project, a larger service can be provided but may be at the expense of the Contractor. Any further service requirements must be submitted to NPTU at least 10 days prior to commencing work.

All other required services, unless otherwise noted in the contract documents, including, but not limited to, high pressure compressed air, welding, and material handling equipment shall be furnished by the Contractor.

I. MEDICAL EMERGENCIES AND WORK RELATED INJURIES

NPTU maintains and operates a medical facility during normal working hours, Monday through Friday except on Site holidays. The clinic is staffed by Navy Hospital Corpsmen and one Navy doctor. Navy Hospital Corpsmen are authorized to provide emergency medical care to civilians. Emergency medical assistance will be provided by NPTU Medical for serious injury or illness, if requested. A "serious injury or illness" is defined as a condition requiring immediate medical attention. Treatment of minor injuries requiring first aid or follow-up care after emergency medical attention is provided shall be by the Contractor or Contractor's medical provider. Report all work related injuries or illnesses to your manager and the NPTU representative. This includes reporting any "minor" electrical shock.

There will be no cost to the Contractor for emergency medical services. However, the Contractor shall be responsible for providing any additional medical services as warranted.

Should a serious accident occur, immediately notify NPTU Security. Subsequently, notify Contractor management and the WCO. Ensure the integrity of the accident scene is maintained to the greatest extent practical, until NPTU can conduct a complete investigation and NPTU management releases the accident scene.

When using external phone systems, such as cell phones, users should call the site number (843) 863-3095 to report emergencies.

J. INCLEMENT WEATHER PLAN

In the event of severe inclement weather, such as a hurricane or tropical storm, work at NPTU shall be suspended a minimum of 96 hours prior to the storm's projected landfall.

The Contractor is expected to have all vehicles, tools, and equipment removed from NPTU 96 hours prior to the storm's projected landfall. Resumption of Contractor work will be

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

12 FEBRUARY 2010

dependent on the severity of the storm's damage. Contractors should not expect to return until at least 96 hours after the threat of severe weather has passed.

K. CONTBACTQR RESPONSE DURING SITE EMERGENCIES

All Contractor personnel shall become familiar with the worksite. Specifically all Contractor personnel should know the building or barge number and name, specific room number, nearest fire extinguisher and emergency exit, and evacuation plan for the worksite.

If an emergency occurs, Contractor personnel shall heed site announcements and evacuate the affected area. The Contractor's on-site supervisor should account for all Contractor personnel at NPTU and report missing personnel to the WCO.

L. PHOTOGRAPHY

The Contractor shall not engage in photography in any way on the Site, without permission and direction in writing from NPTU. Any camera approved for use on site must display a NPTU or WPNSTA Charleston camera pass.

NPTU may utilize photography, including time lapse video taping, for historical documentation of construction features and general construction progress. Photography activities will be planned and coordinated so that there will be no interference with the Contractor's execution of the work.

M. TELEPHQNE SERVICE

Business phone calls specifically relative to the Contractor's work at NPTU may be made using the NPTU phone system.

N. FOOD SERVICE AND EATING IN INQUSTRIAL AREAS

Contractor personnel are permitted to use the Subway restaurant and dining area located at NPTU and vending machines on site during scheduled operating hours. Both food purchased in Subway and food brought from off-site are allowed in the Subway seating area. Contractor personnel will not be permitted to use Subway if shoes or clothing are soiled with mud, tar, asphalt or other such materials.

Consumption of food is prohibited inside industrial areas. Beverages may be consumed in industrial areas provided bottles or cups are capped or covered. Disposable drinking cups with water coolers are to be kept enclosed and sanitary and are to be disposed of after each use.

0. SANITATION

Sanitary facilities in NPTU buildings and barges shall be available for Contractor use.

NPTU will not provide temporary facilities for remote or waterborne projects. Temporary facilities, if deemed necessary, shall be the responsibility of the Contractor.

Contractor personnel shall not use changing or bathing facilities at NPTU without specific permission from the WCO.

NPTU GENERAL CONTRACTOR

SPECIAL CONDITIONS

13 FEBRUARY 2010