Attachment__4_-_Material_Submittal_(AF_Form_66)_dated_12_Aug_2015.pdf

PDF 586 KB Posted

Attached to
Repair HVAC, Training Support Facility, Bldg. 2314 (NPTU) Federal contract opportunity
Solicitation number
FA4418-15-R-0021
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 4 - Material Submittal (AF Form 66) dated 12 Aug 2015 for solicitation FA4418-15-R-0021

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE Repair HVAC System, SOLICITATION/CONTRACT NO.

DKGV 11-2314 Traininig Support Building 2314, NPTU

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM. CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S D

-0

P R

E -C

O N

S

TR

U C

TI

O

N

S D

-0

C E

R

TI

FI

C

AT

E

O F

C O

M P

LI

A

N C

E

S D

-0

S H

O P

D R

AW

IN

G S

S D

-0

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

S D

-0

M

FG

'S

IN

S

TR

U C

TI

O

N S

M

FG

'S W

A R

R A

N

TY

S D

-0

P R

O D

U C

T D

AT

A

D E

S

IG

N D

AT

A

S D

-1

O P

E R

AT

IIO

N

M A

IN

TE

N A

N C

E

S D

-1

C

LO

S E

O U

T D

O C

U M

E N

TS

R E

P O

R

TS

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CON-

TRACTOR

RESUBMITTAL

FINAL

APPROVAL REMARKS

APPROVED DIS-

APPROVED

1 01 30 00 1.2 Admin Req'ts 5

01 32 17.00 Network Analysis Schedules

(NAS)

5 5

3 01 33 00 1.2 Submittal Procedures 5

4 01 35 26 1.3 Govt. Safety Req. 5 5 5

5 01 45 00 1.2 Construction Quality Control 5 5 2

6 01 50 00 1.3 Temp. Const. Fac. & Con. 5

7 01 50 10 1.2 Environmental (JBC-ABW) 5 5 2

8 01 54 00 1.3 Green Procurement (JBC-ABW) 5 5 2

9 01 57 20 1.3 Waste Management 5

10 01 57 50 1.3 Temp. Environmental Controls 5 5 2 5

11 01 78 00 1.1 Closeout Submittals 5 5 5 2

12 02 41 00 1.5 Demolition and Deconstruction 5 5 2

13 07 84 00 Firestopping 5 5 5 5

14 09 51 00 1.3 Acoustical Ceilings 5 5 2 2 5

15 09 90 00 1.2 Paints & Coatings 5 5 2 5 5 5

23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems

5 5 5 5 5 5

NO. OF COPIES REQUIRED

Attachment #4 FA4418-15-R-0021

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE Repair HVAC System, SOLICITATION/CONTRACT NO.

DKGV 11-2314 Traininig Support Building 2314, NPTU

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM. CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S D

-0

P R

E -C

O N

S

TR

U C

TI

O

N

S D

-0

C E

R

TI

FI

C

AT

E

O F

C O

M P

LI

A

N

-0

S H

O P

D R

AW

IN

G S

S D

-0

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

S D

-0

M

FG

'S

IN

S

TR

U C

TI

O

N S

M

FG

'S W

A R

R A

N

TY

S D

-0

P R

O D

U C

T D

AT

A

D E

S

IG

N D

AT

A

S D

-1

O P

E R

AT

IIO

N

M A

IN

TE

N A

N C

E

S D

-1

C

LO

S E

O U

T D

O C

U M

E N

TS

R E

P O

R

TS

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CON-

TRACTOR

RESUBMITTAL

FINAL

APPROVAL REMARKS

APPROVED DIS-

APPROVED

NO. OF COPIES REQUIRED

17 23 03 00.00 1.3 Mechanical Materials & Methods 5 5 5

18 23 05 15 1.3 Common Piping for HVAC 5 5 5 2 5 5 5 5

23 05 48.00 40 1.3 Vibration & Seismic Controls for HVAC Piping

5 5 5

23 05 93 1.4 Testing, Adjusting, & Balancing for HVAC

5 5 5 5 5

23 07 00 Thermal Insulation for Mechanical Systems

5 5 5

23 09 23.13 40 BACnet Direct Digital Control Systems for HVAC

5 5 2 5 5 5 5

23 23 31 13.00 40 1.2 Metal Ducts 5 5 5 5 5 5 5

24 23 36 00.00 40 Air Terminal Units 5 5 5 5

23 64 10 Water Chillers, Vapor Compression Type

5 5 5 5 5

23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems

5 5 5 5 5

23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units

5 5 2 5 5 5 5

23 82 02.00 10 Unitary Heating and Cooling Equipment

5 5 5 5 5

26 05 00 1.3 Common Work Results for Electrical

5 5 5 5 5

30 26 05 19 1.2 Insulated Wire and Cable 5 5

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE Repair HVAC System, SOLICITATION/CONTRACT NO.

DKGV 11-2314 Traininig Support Building 2314, NPTU

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM. CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

S D

-0

P R

E -C

O N

S

TR

U C

TI

O

N

S D

-0

C E

R

TI

FI

C

AT

E

O F

C O

M P

LI

A

N

-0

S H

O P

D R

AW

IN

G S

S D

-0

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

S D

-0

M

FG

'S

IN

S

TR

U C

TI

O

N S

M

FG

'S W

A R

R A

N

TY

S D

-0

P R

O D

U C

T D

AT

A

D E

S

IG

N D

AT

A

S D

-1

O P

E R

AT

IIO

N

M A

IN

TE

N A

N C

E

S D

-1

C

LO

S E

O U

T D

O C

U M

E N

TS

R E

P O

R

TS

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CON-

TRACTOR

RESUBMITTAL

FINAL

APPROVAL REMARKS

APPROVED DIS-

APPROVED

NO. OF COPIES REQUIRED

26 05 48 1.4 Seismic Protection for Electrical Equipment

5 5

32 26 20 00 1.3 Interior Distribution System 5 5 5 5 5

26 29 23 Variable Frequency Drive Systems Under 600 Volts

5 5 5 5 5

34 40 17 30.00 40 Welding General Piping 5 2 5 5 x