GOV_Response_to_NPTU_HVAC_B2314_Pre-Proposal_Questions-Rev.pdf
PDF 65 KB Posted
- Attached to
- Repair HVAC, Training Support Facility, Bldg. 2314 (NPTU) Federal contract opportunity
- Solicitation number
- FA4418-15-R-0021
About this file
Pre-Proposal Site Visit Questions Answers for Solicitation FA4418-15-R-0021
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to Pre-Proposal Questions in [bold]:
FA4418-15-R-0021 Repair HVAC System NPTU Bldg 2314
Pre-Proposal Conference Q&A
1. Is the government responsible for moving all of the furniture and work stations out of the way so the contract work can be done ? Will the government replace them when the work is over?
[GC will be responsible for moving any study carrels and furniture. NPTU will be responsible for moving all computers and any other sensitive materials.]
2. Specification Section 23 09 23.13 20 Page 10 and 11 – Calls for Product Data for Duct Smoke Detectors and Variable Frequency drives. Are these items to be included in this section of work? Particularly the Duct Smoke Detectors typically are provided under Fire Alarm system.
[Yes]
3. Specification Section 23 09 23.13 20 Page 15 Item 2.1.1.10 – Please confirm there is an existing Ethernet backbone to connect BAS. Current system does not use Ethernet Backbone.
[POC is provided in 01 14 00 SPECIAL CONDITIONS]
4. Specification Section 23 09 23.13 20 Page 15 Item 2.1.1.11 a. and b. – Please confirm we are to provide an extra communication port. This has been strictly forbidden at this facility in the past. Please confirm we are to provide one telecommunication port per building. This also has been forbidden in the past.
5. Specification Section 23 09 23.13 20 Page 15 Item 2.1.1.12 – Please confirm that a modem is permissible at this facility.
6. Specification Section 23 09 23.13 20 Page 8 Item 1.4 b. – Will the new DDC system being installed in B2314 be connected to the new NPTU facility currently being constructed? If so, will a new server be required under this renovation since it may eventually connect to the new building server.
[Not known at this time]