Questions and Answers -.pdf
PDF 99 KB Posted
- Attached to
- Renovate for MFRC Move B1249 to B5725
- Solicitation number
- FA301620Q0099
About this file
This document contains questions and answers regarding a federal design-build contract opportunity to renovate space at Lackland Air Force Base in San Antonio, Texas. The scope of work involves renovating and partitioning existing unused medical clinic space to accommodate a new family readiness center and education functions, including adding corridors, eliminating room-to-room egress, and bringing the space up to current building and fire codes. Bidders are advised that the project requires coordination with base stakeholders and making any non-compliant spaces ADA compliant as part of the scope. The solicitation number is FA301620Q0099 and is set aside for small businesses, with pricing estimated between $100,000 and $250,000. Quotes are due by August 19, 2020 and the selected contractor must hold pricing for 90 days.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers MFRC B1249 to B5725, Lackland AFB
Q1. Has the LAFB Fire Chief or AHJ reviewed this area or the RFP?
No. Specialties on the Base such as the Fire Dept, Base Environmental, SP, etc will review the project at the various design review stages of this Design-Build Project
The following is not really a question, but more of an observation.
I Currently this building does not appear to be sprinklered.
The Bldg does not have a sprinkler system.
ii. Originally, it appears the spaces in the work area were used as a health clinic of some kind.
The space previously was used for medical purposes, probably a Clinic.
iii. Currently, it appears the work area space is unused and much of it is storage.
Yes, the work area space is unused and some of the space is now used for storage.
iv. Per the video walk thru and the plans it appears the occupancy of the space will change to an Organization (family readiness) and Education (provided by family readiness) occupancy Yes, Concur
Q2. Due to this change in occupancy it appears that none of the spaces are in compliance of past and current IBC and NFPA building and fire protection codes. Making changes to heat detectors and fire alarm devices will not bring the building to current code and UFC standards. The floor plan needs to be completely changed to add more non-dead end corridors and eliminate egress from one room to another. Assuming we would need to do this as part of the D-B process?
Yes, Concur Has the LAFB Fire Chief or AHJ reviewed this area or the RFP?
See response to item Q1 above.
Q3. Areas that have the wood paneling over gypsum board, are they to be removed/replaced with another layer of gypsum board, I believe that is the intent but please confirm?
Yes, this is intent and then refinish and paint so the wall to resemble a continuous gypsum board wall.
Q4. I believe a projector was requested to be installed in the middle of the room. There are ceiling fans in the room and the proposed location could create a strobe effect on the screen. If the projector was lowered to clear the blades of the ceiling fans, then it would possibly create an ADA non-compliant condition for head room clearance. Is it ok to remove the ceiling fans as part of the D-B process or are those needed to cool the rooms?
The designer during the Design should coordinate the location of the overhead projector with the existing ceiling fan location so there will be no interference and no adverse condition left in the classrooms when the project is completed This include coordination with the Using Agency on these items location.
Q5. It was observed that many of the rooms in the work area have fans that provide ventilation, is there any ventilation issues with the mechanical equipment?
At this time, we are not aware of any ventilation issues
a. Changes in the work area such as taking a room and making it into 2 to 3 spaces would cause the ductwork to be re-routed back to the Air Handling Unit. Will the existing air handling equipment be able to facilitate these changes?
This is something that we have to defer to the designer to determine during the design phase of this DB Project. Maybe only extension of existing duct work will only be required.
b. Has the LAFB Fire Chief or AHJ reviewed this area or the RFP?
See response above for Question Q1.
Q6. Is there enough spare capacity on the existing electrical panels to handle the new loading as specified in the RFP? Where are the panels located?
This is something that we will have to defer to the designer to determine during the design phase of this DB Project, since we don’t know how many circuits will be required for the project.
Q7. Is there enough spare capacity on the existing Tech/Comm panels to handle the new loading as specified in the RFP? Where are the panels located?
The designer will need to coordinate COMM and LANS Requirements with the Lackland Base Communication Group at the Design Phase of this DB Project.
Q8. Is it the intent of the RFP to leave existing light fixtures where they are at as new partitions are added?
Leaving the existing fixtures in place will depend on the exact location of the new partitions and the distribution of the fixture light source. The fixtures should not be too close to the new partition.
Q9. Is it the intent of the RFP not to have any work done to the ceilings?
Yes this is the intent.
Q10. It is the intent of the RFP not to have any of the flooring refinished?
Yes this is the intent.
Q11. The following questions are in regards to the new partitions to be added.
a. Are there any STC requirements?
The STC requirements should match those in the IBC and UFC for this type of building.
b. What type, if any, wall base is to be installed? Wood? Resilient Rubber?
Resilient Rubber
c. Are there any specific gypsum products needed?
Yes, gypsum board
d. Should the new partitions go to the structure above?
New partitions shall be installed to the suspended ceiling.
e. What level finish should the new walls have?
Finish should be as directed by the UFC for this type of bldg.
f. Should the new paint color match the existing adjacent walls?
It is customary for the contractor to provide paint samples to the using agency for their selection during the construction phase.
12. On re-finishing the existing walls
a. Will wall painting be to the line of the existing ceilings?
Yes
b. What level finish should the existing walls have?
See item Q11 (e) above.
c. New wall base, if so, then what type?
See item Q11 (b) above.
Q14. Is there any work in the existing toilet room across from Room 11?
a. If so, what exactly is the scope of work?
Yes, painting and heat detector installation.
Q15. In the video a gentleman described where a new aluminum framed partition was to be installed.
a. Is the top of aluminum framing expected to be at or below the existing ceiling? The aluminum framing is expected to be below the existing ceiling.
b. What is the existing drop ceiling height? Refer to the Room Finish Schedule of the asbuilts to be forwarded later to Base Contracting.
c. What type of door hardware is expected to be on the door in the aluminum framing?
Hardware should match existing hardware in the facility.
d. Aluminum door with glass?
Yes, assembly shall be fire rated.
1. Medium or Wide Stile Frame?
Medium
2. Card reader?
Yes
3. The door will most likely need a panic device which will be a consideration in locking hardware if needed.
Yes Concur
Q16. Will there be any door hardware changes throughout the work area?
None is expected.
Q17. Toilet Rooms 213E and 213F
a. Are these included in the scope of work?
Yes
b. If yes, what is the intent of the scope of work relative to finishes, MEP and Fire
Protection, toilet accessories?
Painting and heat detector
Q18. Is it our responsibility to make the space ADA compliant? The following non-compliant conditions are reason for the question.
a. The room labeled RR across from Rm 11 – Office is non-compliant as it exists.
b. The door into BR 209A is non-compliant.
c. RR 213 E an 213 F are non-compliant.
The contractor is to make all necessary adjustments to make any non-compliant spaces within the scope ADA compliant.
Q17. Please provide a picture and location of the exiting fire alarm panel. .
Photo of existing Fire Alarm Control Panel attached
Q18. Specifications mention of this being a Design/Build but I'm also seeing this is a quote.
Can you please clarify?
This is Design-Build (DB) Project. The specific requirements for the performance are identified throughout the Summary of Work 01 11 00. The contractor’s offer shall provide pricing for CLIN0001 (Design) and CLIN0002 (Construction) in their response to the solicitation.